Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R2-2104756 Discussion on Group Scheduling discussion CATT NR_MBS-Core Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2104824 Discussion on Group scheduling for NR MBS discussion

revision of R2-2103475

ZTE, Sanechips Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2104876 MBS MAC layer and Group scheduling aspects discussion Intel Corporation NR_MBS-Core Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2104938 Discussion on group based scheduling for MBS discussion

revision of R2-2102895

OPPO NR_MBS-Core Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2104950 RAN2 aspects of Group Scheduling for NR MBS discussion MediaTek Inc. Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2104951 L1 HARQ operation for PTM transmission discussion MediaTek Inc. Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2104993 Considerations on Multiplexing & Scheduling Aspects discussion Samsung R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2105098 MBS reception in CONNECTED state discussion Apple NR_MBS-Core Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2105266 Miscellaneous Aspects of MBS Provisioning discussion

revision of R2-2102946

revised to R2-2107691

Nokia, Nokia Shanghai Bell NR_MBS-Core Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2105287 Group Scheduling for MBS discussion vivo NR_MBS-Core Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2105310 Dynamic PTM and PTP switching discussion Shanghai Jiao Tong University R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2105311 Group Scheduling for NR MBS discussion Shanghai Jiao Tong University R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2105313 Deactivation of MBS reception discussion Shanghai Jiao Tong University R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2105512 Consideration of dynamic PTM - PTP switching with service continuity for NR MBS discussion

revision of R2-2103373

revised to R2-2108000

Kyocera Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2105572 RAN2 aspects of group scheduling discussion TCL Communication Ltd. R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2105573 Dynamic PTM PTP Switch discussion TCL Communication Ltd. R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2105654 Open issues group scheduling discussion

revision of R2-2103517

Ericsson NR_MBS-Core Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2105681 MBS BWP UE capability and MBS resources discussion Sony NR_MBS-Core Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2105765 SDAP/PDCP/RLC Aspects for MBS discussion Samsung Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2105834 MBS Group Scheduling Aspects discussion Lenovo, Motorola Mobility Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2106241 Discussion on group scheduling for MBS discussion cmcc NR_MBS-Core Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2106283 RAN2 aspects of group scheduling discussion Huawei, CBN, HiSilicon NR_MBS-Core Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2106422 Discussion on RAN2 aspects of group scheduling and DRX discussion LG Electronics Deutschland NR_MBS-Core Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]
R2-2106483 [Pre114-e][002][MBS] Summary on MBS scheduling discussion vivo NR_MBS-Core Rel-17 R2-114-e

AI: 8.1.2.4

noted [WTS] [JSN]

24 documents (0.33530592918396 seconds)