Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-2107034 | Discussion on Scheduling and Power Saving of MBS | discussion | CATT | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2107049 | DRX scheme for NR MBS | discussion | MediaTek Inc. | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | ||
R2-2107205 | Discussion on group-based scheduling for MBS | discussion | OPPO | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2107233 | MBS Power Saving and Scheduling Aspects | discussion | Samsung |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |||
R2-2107337 | Group scheduling and power saving for NR MBS | discussion | ZTE, Sanechips | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2107438 | Consideration on dynamic PTM and PTP switching for NR MBS | discussion | Shanghai Jiao Tong University |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |||
R2-2107439 | Deactivation and reactivation of MBS reception | discussion | Shanghai Jiao Tong University |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |||
R2-2107446 | MBS group scheduling and power saving | discussion | Intel Corporation | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2107467 | Determination of HARQ retransmission for PTM | discussion | FGI, Asia Pacific Telecom |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |||
R2-2107545 | NR Multicast DRX aspects |
discussion revised to R2-2109901 |
Qualcomm India Pvt Ltd | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2107577 | DRX mechanism for MBS PTM reception | discussion | Apple | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2107682 | DRX for PTM and PTP | discussion | TCL Communication Ltd. |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |||
R2-2107694 | DRX for Multicast | discussion | Nokia, Nokia Shanghai Bell | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2107698 | Service Continuity for Connected mode UE | discussion | NEC | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
withdrawn | [WTS] [JSN] | |
R2-2107699 | Simultaneous transmission of multicast/unicast | discussion | NEC | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
withdrawn | [WTS] [JSN] | |
R2-2107787 | Notification of the Activation/Deactivation of PTM | discussion | SHARP Corporation |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |||
R2-2107796 | Further Considerations on Group Scheduling for MBS | discussion | vivo | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2107920 | MBS specific DRX operation and Data Inactivity Monitoring | discussion | Lenovo, Motorola Mobility | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | ||
R2-2107931 | MBS Group Scheduling | discussion | Samsung | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2108002 | Open issues on group scheduling for NR MBS | discussion | Kyocera | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | ||
R2-2108033 | Scheduling for NR MBS | discussion | CHENGDU TD TECH LTD. | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | ||
R2-2108079 | Aspects on Power Saving | discussion | Ericsson | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2108083 | Aspects on Scheduling | discussion | Ericsson | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2108123 | Support of dynamic switch | discussion | Huawei, HiSilicon | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2108125 | Discussion on group scheduling | discussion | Huawei, HiSilicon | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2108479 | Power saving for MBS PTM | discussion | ETRI |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |||
R2-2108486 | PTM activation and deactivation | discussion | InterDigital | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2108520 | Discussion on group scheduling | discussion | CMCC | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2108551 | Discussion on group scheduling and power saving | discussion | LG Electronics Inc. | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2108798 | Discussion on the group scheduling of MBS | discussion | Xiaomi Communications | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2108846 | [Pre115-e][001][MBS] Summary 8.1.2.2 L2 Centric Scheduling and PowSav (Qualcomm) | discussion | Qualcomm | NR_MBS-Core | Rel-17 |
R2-115-e AI: 8.1.2.2 |
noted | [WTS] [JSN] |
31 documents (0.3258810043335 seconds)