Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-2102718 | Dynamic PTM/PTP Switch | discussion | CATT | NR_MBS-Core | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | |
R2-2102767 | Discussion on dynamic PTM and PTP switching | discussion | Shanghai Jiao Tong University |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | |||
R2-2102783 | Dynamic Switch for NR MBS | discussion | MediaTek Inc. | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | ||
R2-2103119 | Dynamic PTM PTP switch for RRC Connected UE | discussion | vivo |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | |||
R2-2103163 | PTP_PTM dynamic switch | discussion | NEC | NR_MBS-Core | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | |
R2-2103202 | Service Continuity during Dynamic PTM/PTP Switch with Logical Channel Aggregation | discussion | Futurewei | NR_MBS-Core | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | |
R2-2103255 | Discussion on dynamic PTM PTP switching | discussion | Spreadtrum Communications | NR_MBS-Core | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | |
R2-2103358 | Dynamic PTM PTP switching | discussion | LG Electronics Inc. | NR_MBS-Core |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | ||
R2-2103373 | Consideration of dynamic PTM - PTP switching with service continuity for NR MBS |
discussion revised to R2-2105512 |
Kyocera | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | ||
R2-2103414 | MBS dynamic switch between PTP and PTM with service continuity | discussion | Lenovo, Motorola Mobility | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | ||
R2-2103474 | Mode switching signaling of NR MBS | discussion | ZTE, Sanechips | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | ||
R2-2103512 | Procedure for dynamic PTM/PTP switch | discussion | CHENGDU TD TECH LTD. | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | ||
R2-2103518 | Email discussion report [Post113-e][054]PTP/PTM dynamic switch and MRB type change | report | Ericsson (Rapporteur) | NR_MBS-Core | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
noted | [WTS] [JSN] | |
R2-2103524 | PTP/PTM dynamic switch and MRB initialization | discussion | Huawei, CBN, HiSilicon | NR_MBS-Core | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | |
R2-2103543 | MRB and DRB configuration | discussion | Sony Europe B.V. | NR_MBS-Core | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | |
R2-2103649 | Discussion on MRB | discussion | Samsung | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | ||
R2-2103680 | PTM/PTP mode switching | discussion | InterDigital | NR_MBS-Core | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | |
R2-2103872 | MBS PTP/PTM switching | discussion | Apple | NR_MBS-Core | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | |
R2-2104118 | Dynamic switch between PTM and PTP for service continuity | discussion | Intel Corporation | NR_MBS-Core | Rel-17 |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] | |
R2-2104207 | Support of dynamic switch between PTP and PTM | discussion | SHARP Corporation |
R2-113-bis-e AI: 8.1.2.2 |
available | [WTS] [JSN] |
20 documents (0.32001090049744 seconds)