Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S2-150044 | MONTE Event Analysis - Change in Location |
pCR revision of S2-143901 revised to S2-150524 |
Cisco | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150064 | Proposal for communication failure event |
pCR revised to S2-150518 |
China Mobile, Huawei | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150105 | Solution for monitoring via PGW | pCR | Huawei, HiSilicon | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
noted | [WTS] [JSN] |
S2-150239 | Cover Sheet for TR 23.789 for Approval at TSG SA |
TS or TR cover revised to S2-150527 |
Intel | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] | |
S2-150240 | Conclusions for MONTE |
pCR revised to S2-150523 |
Intel | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150241 | Removing Key issue 2 | pCR | Intel | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
approved | [WTS] [JSN] |
S2-150242 | Monitoring description and flow | CR | Intel | 23.682 13.0.0 CR#90 catB | MONTE | Rel-13 |
S2-107 AI: 7.8 |
noted | [WTS] [JSN] |
S2-150247 | Clarification on the usage of SCS/AS provided time period value for loss of connectivity monitoring via HSS |
pCR revised to S2-150514 |
LG Electronics | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150248 | Correction on monitoring event reporting via HSS | pCR | LG Electronics | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
approved | [WTS] [JSN] |
S2-150257 | Pseudo-CR on Notification configuration in HSS | pCR | Ericsson | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
approved | [WTS] [JSN] |
S2-150260 | Monitoring events in PCC |
pCR revised to S2-150510 |
Ericsson | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150268 | Update of HSS aspects for Solution 3 |
pCR revised to S2-150511 |
Huawei | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150269 | Update for Specific Monitoring Event Handling |
pCR revised to S2-150516 |
Huawei | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150270 | Proposed conclusions | pCR | Huawei, HiSilicon | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
noted | [WTS] [JSN] |
S2-150292 | Clarification on loss of connectivity |
pCR revised to S2-150513 |
CATT | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150313 | Reporting the Number of UEs in Certain Geographic Area |
pCR revised to S2-150509 |
ZTE | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150333 | Reporting the number and location of UEs in a certain area |
pCR revised to S2-150508 |
Orange | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150508 | Reporting the number and location of UEs in a certain area |
pCR revision of S2-150333 |
Orange | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
withdrawn | [WTS] [JSN] |
S2-150509 | Reporting the Number of UEs in Certain Geographic Area |
pCR revision of S2-150313 revised to S2-150517 |
ZTE | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150510 | Monitoring events in PCC |
pCR revision of S2-150260 revised to S2-150539 |
Ericsson | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150511 | Update of HSS aspects for Solution 3 |
pCR revision of S2-150268 revised to S2-150515 |
Huawei | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150512 | MONTE drafting session report | other | Intel | Rel-13 |
S2-107 AI: 7.8 |
noted | [WTS] [JSN] | ||
S2-150513 | Clarification on loss of connectivity |
pCR revision of S2-150292 |
CATT | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
approved | [WTS] [JSN] |
S2-150514 | Clarification on the usage of SCS/AS provided time period value for loss of connectivity monitoring via HSS |
pCR revision of S2-150247 |
LG Electronics | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
approved | [WTS] [JSN] |
S2-150515 | Update of HSS aspects for Solution 3 |
pCR revision of S2-150511 |
Huawei | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
approved | [WTS] [JSN] |
S2-150516 | Update for Specific Monitoring Event Handling |
pCR revision of S2-150269 revised to S2-150540 |
Huawei | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150517 | Reporting the Number of UEs in Certain Geographic Area |
pCR revision of S2-150509 |
ZTE | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
noted | [WTS] [JSN] |
S2-150518 | Proposal for communication failure event |
pCR revision of S2-150064 revised to S2-150542 |
China Mobile, Huawei | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150523 | Conclusions for MONTE |
pCR revision of S2-150240 revised to S2-150525 |
Intel, Cisco, KPN, Alcatel-Lucent, Huawei, HiSilicon, ZTE, CMCC | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150524 | MONTE Event Analysis - Change in Location |
pCR revision of S2-150044 |
Cisco | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
approved | [WTS] [JSN] |
S2-150525 | Conclusions for MONTE |
pCR revision of S2-150523 |
Intel, Cisco, KPN, Alcatel-Lucent, Huawei, HiSilicon, ZTE, CMCC | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
approved | [WTS] [JSN] |
S2-150526 | Conclusions for MONTE - Reporting number of UEs present in certain Area |
pCR revised to S2-150541 |
Intel, Cisco, KPN, Alcatel-Lucent, Huawei, HiSilicon, ZTE, CMCC, LG Electronic | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150539 | Monitoring events in PCC |
pCR revision of S2-150510 |
Ericsson | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
approved | [WTS] [JSN] |
S2-150540 | Update for Specific Monitoring Event Handling |
pCR revision of S2-150516 revised to S2-150679 |
Huawei | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
revised | [WTS] [JSN] |
S2-150541 | Conclusions for MONTE - Reporting number of UEs present in certain Area |
pCR revision of S2-150526 |
Intel, Cisco, KPN, Alcatel-Lucent, Huawei, HiSilicon, ZTE, CMCC, LG Electronic | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
approved | [WTS] [JSN] |
S2-150542 | Proposal for communication failure event |
pCR revision of S2-150518 |
China Mobile, Huawei | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
approved | [WTS] [JSN] |
S2-150679 | Update for Specific Monitoring Event Handling |
pCR revision of S2-150540 |
Huawei | 23.789 | MONTE | Rel-13 |
S2-107 AI: 7.8 |
approved | [WTS] [JSN] |
37 documents (0.33741784095764 seconds)