Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
SP-180624 | LS from ITU-R WP 5A: LIAISON ON THE REVISION OF RECOMMENDATION ITU-R M.2084-0 |
LS in source LS: LS_WP5A_TD304 LS To: External Oragnisations |
ITU-R WP 5A |
SP-81 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180625 | LS from ITU-R WP5D: LIAISON STATEMENT TO GCS PROPONENTS AND TRANSPOSING ORGANIZATIONS ON THE PROVISION OF TRANSPOSITION REFERENCES AND CERTIFICATION C FOR DRAFT REVISION 14 OF RECOMMENDATION ITU-R M.1457 |
LS in source LS: 5D_TD_521Rev1 LS To: 3GPP, 3GPP2, ARIB, ATIS, CCSA, ETSI, IEEE, TIA, TSDSI, TTA, TTC, WiMAX Forum |
ITU-R WP5D |
SP-81 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180626 | LS from ITU-R WP5D: Confirmation of receipt of initial description templates and updated information related to proposals for the terrestrial components of the radio interface(s) for IMT-2020 |
LS in source LS: 5D_TD_553 LS To: IMT-2020 proponents: 3GPP, KOREA, CHINA, ETSI, TSDSI |
ITU-R WP 5D |
SP-81 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180627 | LS from ITU-R WP5D: Availability of initial description template information and updated information related to proposals for the terrestrial components of the radio interface(s) for IMT-2020 |
LS in source LS: 5D_TD_554. LS To: Registered independent evaluation groups |
ITU-R WP 5D |
SP-81 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180628 | LS from ITU-R WP1A: PRELIMINARY DRAFT REVISION OF REPORT ITU-R SM.2351-2 ON SMART GRID UTILITY MANAGEMENT SYSTEMS |
LS in source LS: 1A/TEMP/135 LS To: 3GPP, 3GPP2, ARIB, ATIS, CCSA, CDG, ETSI, EUTC, IEEE, ITRI, GSMA, TIA, TTA, UTC, UTCAL, Wi-Fi Alliance, WiMAX Forum |
ITU-R WP1A |
SP-81 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180836 | List of new Rel-14 specifications to be added to M.2012 | other | ITU-R ad-hoc group |
SP-81 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180887 | LS from TSG RAN: DRAFT Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 4 of Rec. ITU-R M.2012 |
LS in source LS: RP-182099 LS To: TSG SA |
TSG RAN |
SP-81 AI: 7.7 |
revised | [WTS] [JSN] | |||
SP-180888 | LS from TSG RAN: Draft LTI ANSWER TO LIAISON STATEMENT TO EXTERNAL ORGANISATIONS ON THE REVISION OF RECOMMENDATION ITU-R M.2084-0 |
LS in source LS: RP-182100 LS To: TSG SA |
TSG RAN |
SP-81 AI: 7.7 |
endorsed | [WTS] [JSN] | |||
SP-180889 | LS from TSG RAN: DRAFT LETTER TO ITU IN REPLY TO ITU-R WP1A/TEMP/135 = RP-181516 ON PRELIMINARY DRAFT REVISION OF REPORT ITU-R SM.2351-2 ON SMART GRID UTILITY MANAGEMENT SYSTEMS |
LS in source LS: RP-182101 LS To: TSG SA |
TSG RAN |
SP-81 AI: 7.7 |
endorsed | [WTS] [JSN] | |||
SP-180904 | TSG RAN report to TSG SA#81 | report | TSG RAN Chairman |
SP-81 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180911 | LS from TSG RAN: Draft LTI on 3GPP 5G Preliminary Description Template and Self-Evaluation |
LS in source LS: RP-182097 LS To: TSG SA revised to SP-180919 |
TSG RAN |
SP-81 AI: 7.7 |
endorsed | [WTS] [JSN] | |||
SP-180912 | LS from TSG RAN: LS on 3GPP Workshop on 5G submission towards IMT-2020 |
LS in source LS: RP-182128 LS To: 3GPP MRPs: GSA, GSM Association, IPV6 Forum, TD Industry Alliance, 5G Americas, Small Cell Forum, Cellular Operators Association of India, NGMN Alliance, TCCA, GCF, CTIA, Wireless Broadband Alliance, 5G Infrastructure Association, Public Safety Communicat |
TSG RAN | Rel-15 |
SP-81 AI: 7.7 |
noted | [WTS] [JSN] | ||
SP-180916 | Letter to ITU on the completion of the submission of LTE-Advanced toward Revision 4 of Rec. ITU-R M.2012 |
LS out LS To: 3GPP PCG |
TSG SA |
SP-81 AI: 7.7 |
approved | [WTS] [JSN] | |||
SP-180917 | LTI ANSWER TO LIAISON STATEMENT TO EXTERNAL ORGANISATIONS ON THE REVISION OF RECOMMENDATION ITU-R M.2084-0 |
LS out LS To: 3GPP PCG |
TSG SA |
SP-81 AI: 7.7 |
approved | [WTS] [JSN] | |||
SP-180918 | LETTER TO ITU IN REPLY TO ITU-R WP1A/TEMP/135 = RP-181516 ON PRELIMINARY DRAFT REVISION OF REPORT ITU-R SM.2351-2 ON SMART GRID UTILITY MANAGEMENT SYSTEMS |
LS out LS To: 3GPP PCG |
TSG SA |
SP-81 AI: 7.7 |
approved | [WTS] [JSN] | |||
SP-180919 | LTI on 3GPP 5G Preliminary Description Template and Self-Evaluation |
LS out LS To: 3GPP PCG revision of SP-180911 |
TSG SA |
SP-81 AI: 7.7 |
approved | [WTS] [JSN] |
16 documents (0.34810996055603 seconds)