Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
SP-180006 | LS from ITU-R WP 5D: IMT-2020 IN SUPPORT OF PPDR |
LS in source LS: 5D_875_temp445r1 LS To: 3GPP |
ITU-R WP5D |
SP-79 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180007 | LS from ITU-R WP 5D: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE REVISED SCHEDULE FOR UPDATING RECOMMENDATION ITU-R M.2012 TO REVISION 4 |
LS in source LS: 5D_875_temp450r1 LS To: EXTERNAL ORGANIZATIONS |
ITU-T WP 5D |
SP-79 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180008 | LS from ITU-R WP5D: LIAISON STATEMENT TO IMT-2020 PROPONENTS 3GPP, KOREA AND CHINA |
LS in source LS: 5D_875_temp464r1 LS To: IMT-2020 PROPONENTS |
ITU-R WP5D |
SP-79 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180009 | LS from ITU-R WP 5D: Availability of initial description template information related to proposals for the terrestrial components of the radio interface(s) for IMT-2020 |
LS in source LS: 5D_875_temp465r1 LS To: REGISTERED INDEPENDENT EVALUATION GROUPS |
ITU-R WP 5D |
SP-79 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180020 | LS from ITU-T SG15: Initiation of work to support IMT-2020/5G in the Transport Network |
LS in source LS: SG15-LS115 LS To: TSG RAN, TSG SA |
ITU-T SG15 |
SP-79 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180174 | LS from ITU-T JCA: LS on Invitation to update the information in the IMT2020 roadmap |
LS in source LS: JCA-IMT2020-O-003 LS To: ITU-T SGs, External IMT-2020 LS Partners |
ITU-T JCA-IMT2020 |
SP-79 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180217 | LS from TSG RAN: DRAFT Letter to ITU on Update submission for LTE-Advanced toward Rev. 4 of Rec. ITU-R M.2012 |
LS in source LS: RP-180518 LS To: TSG SA |
TSG RAN |
SP-79 AI: 7.7 |
endorsed | [WTS] [JSN] | |||
SP-180218 | LS from TSG RAN: DRAFT Letter to ITU on IMT-2020 in support of PPDR |
LS in source LS: RP-180555 LS To: TSG SA |
TSG RAN |
SP-79 AI: 7.7 |
endorsed | [WTS] [JSN] | |||
SP-180219 | LS from TSG RAN: Letter to ITU on 3GPP IMT-2020 Self-evaluation |
LS in source LS: RP-180556 LS To: TSG SA |
TSG RAN |
SP-79 AI: 7.7 |
treated | [WTS] [JSN] | |||
SP-180241 | LS from TSG RAN: LS on secured Signalling-only connection |
LS in source LS: RP-180590 LS To: RAN WG3, SA WG2, SA WG3 |
TSG RAN | NR_newRAT | Rel-15 |
SP-79 AI: 7.7 |
noted | [WTS] [JSN] | |
SP-180242 | LS from TSG RAN: LS on optimisation of UE capability signalling |
LS in source LS: RP-180598 LS To: TSG SA, RAN WG2 |
TSG RAN | TEI15 | Rel-15 |
SP-79 AI: 7.7 |
noted | [WTS] [JSN] | |
SP-180243 | TSG RAN report to TSG SA#79 | report | TSG RAN Chairman |
SP-79 AI: 7.7 |
noted | [WTS] [JSN] | |||
SP-180244 | LS to PCG: DRAFT Letter to ITU on IMT-2020 in support of PPDR |
LS out LS To: PCG |
TSG RAN |
SP-79 AI: 7.7 |
approved | [WTS] [JSN] | |||
SP-180245 | LS to PCG: DRAFT Letter to ITU on Update submission for LTE-Advanced toward Rev. 4 of Rec. ITU-R M.2012 |
LS out LS To: PCG |
TSG RAN |
SP-79 AI: 7.7 |
approved | [WTS] [JSN] | |||
SP-180246 | Letter to ITU on 3GPP IMT-2020 Self-evaluation |
LS out LS To: PCG revised to SP-180248 |
TSG RAN |
SP-79 AI: 7.7 |
revised | [WTS] [JSN] | |||
SP-180248 | Letter to ITU on 3GPP IMT-2020 Self-evaluation |
LS out LS To: PCG revision of SP-180246 |
TSG RAN |
SP-79 AI: 7.7 |
approved | [WTS] [JSN] |
16 documents (0.35424208641052 seconds)