Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R4-2509361 | Discussion on UE Tx requirement for NTN support HPUE | other | CATT | NR_IoT_NTN_req_test_enh-Core |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | ||
| R4-2509536 | Power back-off results for PC2 on NTN L-band | discussion | Apple | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | |
| R4-2509537 | Power back-off results for PC2 on NTN S-band | discussion | Apple | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | |
| R4-2509538 | Power back-off results for PC2 on NTN L-/S-band | discussion | Apple, Globalstar | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | |
| R4-2509539 | Introduction of NTN HPUE to TR 38.741 |
CR revised to R4-2511665 |
Apple, Globalstar | 38.741 18.5.0 CR#9 catB | NR_IoT_NTN_req_test_enh-Core | Rel-18 |
R4-116 AI: 7.6.3.2.1 |
revised | [WTS] [JSN] |
| R4-2509854 | Discussion on NR-NTN HPUE TX RF requirements | discussion | MediaTek (Hefei) Inc. | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | |
| R4-2510500 | Views on HPUE for NR-NTN | discussion | CSCN | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | |
| R4-2510521 | Discussion on Tx requirements for NR-NTN HPUE | discussion | OPPO | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | |
| R4-2510522 | Analysis on NTN AMPR simulation results for n256 NS_24 | discussion | OPPO | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | |
| R4-2510710 | Discussion for UE RF Tx requirements of NTN_NR_HPUE | discussion | LG Electronics France | NR_IoT_NTN_req_test_enh-Core |
R4-116 AI: 7.6.3.2.1 |
withdrawn | [WTS] [JSN] | ||
| R4-2510776 | Discussion for UE RF Tx requirements of NTN_NR_HPUE | discussion | LG Electronics France | NR_IoT_NTN_req_test_enh-Core |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | ||
| R4-2510854 | On NR-NTN HPUE Tx requirements | other | Samsung | NR_IoT_NTN_req_test_enh | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | |
| R4-2510855 | Summary on NR-NTN HPUE A-MPR offline analysis | discussion | Samsung | NR_IoT_NTN_req_test_enh | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | |
| R4-2510857 | Draft CR to TS 38.101-5 for section 6 |
draftCR revised to R4-2511790 |
Samsung | NR_IoT_NTN_req_test_enh | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
revised | [WTS] [JSN] | |
| R4-2510921 | DraftCR for TR 38.863, Introduction on UE Transmission characteristics for NTN supporting HPUE |
draftCR revised to R4-2511791 |
CATT | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
revised | [WTS] [JSN] | |
| R4-2511269 | n256 A-MPR simulations and proposal | other | Nokia | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | |
| R4-2511320 | MPR and antenna isolation evaluation for 4Tx PC1 | other | Skyworks Solutions Inc. | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | ||
| R4-2511400 | NR NTN HPUE Tx requirements | other | Qualcomm Incorporated | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | |
| R4-2511498 | On practical aspects of defining HPUE AMPR for the satellite bands | discussion | Apple | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | |
| R4-2511587 | On the UE RF Tx requirements for NR-NTN HPUE | other | Ericsson | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
noted | [WTS] [JSN] | |
| R4-2511665 | Introduction of NTN HPUE to TR 38.741 |
CR revision of R4-2509539 |
Apple, Globalstar | 38.741 18.5.0 CR#91 catB | NR_IoT_NTN_req_test_enh-Core | Rel-18 |
R4-116 AI: 7.6.3.2.1 |
withdrawn | [WTS] [JSN] |
| R4-2511701 | Introduction of NTN HPUE to TR 38.741 |
CR revised to R4-2511867 |
Apple, Globalstar | 38.741 18.5.0 CR#11 catB | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
revised | [WTS] [JSN] |
| R4-2511790 | Draft CR to TS 38.101-5 for section 6 |
draftCR revision of R4-2510857 |
Samsung | NR_IoT_NTN_req_test_enh | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
endorsed | [WTS] [JSN] | |
| R4-2511791 | DraftCR for TR 38.863, Introduction on UE Transmission characteristics for NTN supporting HPUE |
draftCR revision of R4-2510921 |
CATT | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
endorsed | [WTS] [JSN] | |
| R4-2511867 | Introduction of NTN HPUE to TR 38.741 |
CR revision of R4-2511701 |
Apple, Globalstar | 38.741 18.5.0 CR#111 catB | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
agreed | [WTS] [JSN] |
| R4-2512822 | Addition of the L-band NTN HPUE power back-off simulations to TR 38.863 | CR | Apple | 38.863 19.0.1 CR#40 catB | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
endorsed | [WTS] [JSN] |
| R4-2512823 | Addition of the S-band NTN HPUE power back-off simulations to TR 38.863 | CR | Apple | 38.863 19.0.1 CR#41 catB | NR_IoT_NTN_req_test_enh-Core | Rel-19 |
R4-116 AI: 7.6.3.2.1 |
endorsed | [WTS] [JSN] |
27 documents (0.41728401184082 seconds)