Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S5-176069 5G Charging normative work organization discussion Nokia, Nokia Shanghai Bell Rel-15 S5-116

AI: 7.5.3

noted [WTS] [JSN]
S5-176070 Rel-15 pCR TR 32.899 conclusion for Online and offline charging evaluation pCR

revised to S5-176364

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176071 Rel-15 pCR TR 32.899 conclusion for roaming pCR

revised to S5-176362

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176072 Rel-15 pCR TR 32.899 conclusion on Network exposure capability pCR

revised to S5-176329

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176073 Rel-15 pCR TR 32.899 some conclusions on Interaction between SMF and UPF pCR

revised to S5-176321

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176074 Rel-15 pCR TR 32.899 conclusions on session mngt and service continuity pCR

revised to S5-176318

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176075 Rel-15 pCR TR 32.899 some final conclusions and recommendations pCR

revised to S5-176466

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176077 Rel-15 pCR TR 32.899 reference for PCC in roaming pCR Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176078 Rel-15 pCR TR 32.899 additional solution roaming LBO pCR

revised to S5-176361

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176081 Rel-15 pCR 32.899 Addition of Combined Online and Offline charging pCR

revised to S5-176363

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176082 Rel-15 pCR 32.899 Charging procedure for PDU session Anchor in UPFs pCR

revised to S5-176319

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176083 Rel-15 pCR 32.899 Addition of Network Slicing Charging pCR Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

noted [WTS] [JSN]
S5-176084 Rel-15 pCR 32.899 Solutions for QoS based Charging pCR

revised to S5-176325

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176085 Rel-15 pCR 32.899 Service Based Interface pCR

revised to S5-176365

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176086 Rel-15 pCR 32.899 Conclusion on the QoS Topic in clause 5.2 pCR

revised to S5-176327

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176087 Rel-15 pCR 32.899 Conclusion on the Interaction between SMF and UPF in clause 5.3 pCR Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

merged [WTS] [JSN]
S5-176088 Rel-15 pCR 32.899 Conclusion on the Network Slicing Topic in clause 5.4 pCR

revised to S5-176328

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176089 Rel-15 pCR 32.899 Conclusion on the Network Capability Exposure Topic in clause 5.5 pCR Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

merged [WTS] [JSN]
S5-176090 Rel-15 pCR 32.899 Conclusion on the Service-based Architecture in clause 5.7 pCR

revised to S5-176366

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176091 Rel-15 pCR 32.899 Conclusion on the Interworking between 5G System and Existing Systems in clause 5.8 pCR

revised to S5-176367

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176092 Rel-15 pCR 32.899 Conclusion on the Online and Offline Charging Evaluation Topic in clause 5.9 pCR Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

merged [WTS] [JSN]
S5-176093 Rel-15 pCR 32.899 Suggestion on Clause 6 pCR Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

noted [WTS] [JSN]
S5-176094 Rel-15 pCR 32.899 Correction on the TR 32.899 pCR Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176096 Rel-15 pCR TR 32.899 alternative solution for Network exposure capability pCR Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176156 Rel-15 pCR TR 32.899 introduction SSC mode 3 Multi homed pCR

revised to S5-176317

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176157 Rel-15 pCR 32.899 Refinements on scenarios with BP- UL CL pCR

revised to S5-176320

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176158 Rel-15 pCR 32.899 Correction roaming Home routed scenario pCR Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176159 Rel-15 pCR 32.899 update scenarios SSC mode 2 pCR

revised to S5-176315

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176196 Rel-15 pCR 32.899 Update conventions clause pCR

revised to S5-176314

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176218 Rel-15 pCR 32.899 Solution#3.6 Evaluation pCR

revised to S5-176324

Ericsson 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176219 Rel-15 pCR 32.899 Solution#3.8 Evaluation pCR

revised to S5-176323

Ericsson 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176220 Rel-15 pCR 32.899 Solution#10.1 Evaluation pCR

revised to S5-176368

Ericsson 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

revised [WTS] [JSN]
S5-176296 LS from CT4 to SA5 on Reply LS on 5G Charging Study Phase 1 on N4 LS in

LS reply in S5-176369

C4-175223 S5-116

AI: 7.5.3

replied to [WTS] [JSN]
S5-176314 Rel-15 pCR 32.899 Update conventions clause pCR

revision of S5-176196

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176315 Rel-15 pCR 32.899 update scenarios SSC mode 2 pCR

revision of S5-176159

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176316 Rel-15 pCR 32.899 Solution #3.1 evaluation pCR Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176317 Rel-15 pCR TR 32.899 introduction SSC mode 3 Multi homed pCR

revision of S5-176156

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176318 Rel-15 pCR TR 32.899 conclusions on session mngt and service continuity pCR

revision of S5-176074

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176319 Rel-15 pCR 32.899 Charging procedure for PDU session Anchor in UPFs pCR

revision of S5-176082

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176320 Rel-15 pCR 32.899 Refinements on scenarios with BP- UL CL pCR

revision of S5-176157

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176321 Rel-15 pCR TR 32.899 some conclusions on Interaction between SMF and UPF pCR

revision of S5-176073

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176323 Rel-15 pCR 32.899 Solution#3.8 Evaluation pCR

revision of S5-176219

Ericsson 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176324 Rel-15 pCR 32.899 Solution#3.6 Evaluation pCR

revision of S5-176218

Ericsson 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176325 Rel-15 pCR 32.899 Solutions for QoS based Charging pCR

revision of S5-176084

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176326 Rel-15 pCR 32.899 new Solution for QoS based Charging pCR Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

noted [WTS] [JSN]
S5-176327 Rel-15 pCR 32.899 Conclusion on the QoS Topic in clause 5.2 pCR

revision of S5-176086

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176328 Rel-15 pCR 32.899 Conclusion on the Network Slicing Topic in clause 5.4 pCR

revision of S5-176088

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176329 Rel-15 pCR TR 32.899 conclusion on Network exposure capability pCR

revision of S5-176072

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176361 Rel-15 pCR TR 32.899 additional solution roaming LBO pCR

revision of S5-176078

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176362 Rel-15 pCR TR 32.899 conclusion for roaming pCR

revision of S5-176071

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176363 Rel-15 pCR 32.899 Addition of Combined Online and Offline charging pCR

revision of S5-176081

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176364 Rel-15 pCR TR 32.899 conclusion for Online and offline charging evaluation pCR

revision of S5-176070

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176365 Rel-15 pCR 32.899 Service Based Interface pCR

revision of S5-176085

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176366 Rel-15 pCR 32.899 Conclusion on the Service-based Architecture in clause 5.7 pCR

revision of S5-176090

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176367 Rel-15 pCR 32.899 Conclusion on the Interworking between 5G System and Existing Systems in clause 5.8 pCR

revision of S5-176091

Huawei 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176368 Rel-15 pCR 32.899 Solution#10.1 Evaluation pCR

revision of S5-176220

Ericsson 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176369 Reply to: LS from CT4 to SA5 on Reply LS on 5G Charging Study Phase 1 on N4 LS out

LS is reply to S5-176296

LS To: CT4

Ericsson Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176371 Draft TR 32.899 draft TR Huawei FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176372 Cover sheet TR 32.899 TS or TR cover Huawei FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]
S5-176466 Rel-15 pCR TR 32.899 some final conclusions and recommendations pCR

revision of S5-176075

Nokia, Nokia Shanghai Bell 32.899 1.1.1 FS_5GS_Ph1_CH Rel-15 S5-116

AI: 7.5.3

approved [WTS] [JSN]

60 documents (0.3616030216217 seconds)