Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-1806256 | TDD UL/DL configuration HPUE in FR1 | discussion | Intel Corporation | Rel-15 |
R4-87 AI: 7.5.2.1 |
noted | [WTS] [JSN] | ||
R4-1806709 | Evaluation time for UE capability of maxUplinkDutyCycle | discussion | CATT | NR_newRAT-Core | Rel-15 |
R4-87 AI: 7.5.2.1 |
withdrawn | [WTS] [JSN] | |
R4-1806818 | More on HPUE behavior | discussion | OPPO | NR_newRAT-Core | Rel-15 |
R4-87 AI: 7.5.2.1 |
noted | [WTS] [JSN] | |
R4-1806819 | LS on power class 2 UE uplink downlink configuration restrictions |
LS out LS To: CCSA TC9, FCC, CENELEC CLC/TC 106X revised to R4-1808088 |
OPPO | NR_newRAT-Core | Rel-15 |
R4-87 AI: 7.5.2.1 |
revised | [WTS] [JSN] | |
R4-1806890 | Discussion on SAR evaluation period for NR HPUE | discussion | CMCC |
R4-87 AI: 7.5.2.1 |
noted | [WTS] [JSN] | |||
R4-1806891 | LS on evaluation period in UE capability of maxUplinkDutyCycle |
LS out LS To: RAN2 revised to R4-1808089 |
CMCC |
R4-87 AI: 7.5.2.1 |
revised | [WTS] [JSN] | |||
R4-1807440 | Draft CR for PCMAX and SAR related requirements in FR1 | draftCR | DOCOMO Communications Lab. | NR_newRAT-Core | Rel-15 |
R4-87 AI: 7.5.2.1 |
noted | [WTS] [JSN] | |
R4-1808088 | LS on power class 2 UE uplink downlink configuration restrictions |
LS out LS To: CCSA TC9, FCC, CENELEC CLC/TC 106X revision of R4-1806819 |
OPPO | NR_newRAT-Core | Rel-15 |
R4-87 AI: 7.5.2.1 |
noted | [WTS] [JSN] | |
R4-1808089 | LS on evaluation period in UE capability of maxUplinkDutyCycle |
LS out LS To: RAN2 revision of R4-1806891 revised to R4-1808197 |
CMCC |
R4-87 AI: 7.5.2.1 |
revised | [WTS] [JSN] | |||
R4-1808122 | WF FR1 HPUE behaviour |
other revised to R4-1808196 |
CMCC |
R4-87 AI: 7.5.2.1 |
revised | [WTS] [JSN] | |||
R4-1808196 | WF FR1 HPUE behaviour |
other revision of R4-1808122 |
CMCC |
R4-87 AI: 7.5.2.1 |
approved | [WTS] [JSN] | |||
R4-1808197 | LS on evaluation period in UE capability of maxUplinkDutyCycle |
LS out LS To: RAN2 revision of R4-1808089 |
CMCC | NR_newRAT-Core | Rel-15 |
R4-87 AI: 7.5.2.1 |
approved | [WTS] [JSN] |
12 documents (0.35288095474243 seconds)