Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-212140 | TS 36.523-1 Tracker status after RAN5#91-e | other | Samsung (Rapporteur) |
R5-91-e AI: 7.5 |
available | [WTS] [JSN] | |||
R5-212142 | TS 36.523-1 Tracker status after RAN5#91-e | other | Samsung (Rapporteur) |
R5-91-e AI: 7.5 |
available | [WTS] [JSN] | |||
R5-212377 | FR2 Measurement Uncertainty (MU) and Test Tolerances (TT) Target Completion Update | discussion | AT&T | 5GS_NR_LTE-UEConTest |
R5-91-e AI: 7.5 |
available | [WTS] [JSN] | ||
R5-212648 | RAN5#91-e summary of changes to RAN5 test cases with potential impact on GCF and PTCRB | report | Ericsson, Samsung |
R5-91-e AI: 7.5 |
available | [WTS] [JSN] | |||
R5-212650 | 3GPP RAN5 CA status list (post-RAN5#91-e meeting) | other | Ericsson |
R5-91-e AI: 7.5 |
available | [WTS] [JSN] | |||
R5-212659 | 5GS progress report RAN5#91-e | WI status report | Ericsson | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-91-e AI: 7.5 |
available | [WTS] [JSN] | |
R5-212660 | Update of RAN5 5G NR phases and target update RAN5#91-e | discussion | Ericsson | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-91-e AI: 7.5 |
available | [WTS] [JSN] | |
R5-213282 | LS on FR2 relative power tolerance |
LS out LS To: TSG RAN WG4 revised to R5-214106 |
TSG WG RAN5 | 5GS_NR_LTE-UEConTest |
R5-91-e AI: 7.5 |
revised | [WTS] [JSN] | ||
R5-213370 | draft TR 38.918 v0.1.0 | draft TR | CMCC | FS_NR_Slice_Test | Rel-16 |
R5-91-e AI: 7.5 |
approved | [WTS] [JSN] | |
R5-213429 | LS on Emergency call after Authentication Failure |
LS out LS To: TSG WG CT1 |
TSG WG RAN5 |
R5-91-e AI: 7.5 |
postponed | [WTS] [JSN] | |||
R5-213822 | LS on FR2 ETC testing |
LS out LS To: GCF CAG, PTCRB PVG revision of R5-213215 |
TSG WG RAN5 | 5GS_NR_LTE-UEConTest |
R5-91-e AI: 7.5 |
approved | [WTS] [JSN] | ||
R5-214045 | LS on the clarification for the Test Applicability of E-UTRA anchor-agnostic approach applied test cases |
LS out LS To: GCF CAG, PTCRB PVG |
TSG WG RAN5 |
R5-91-e AI: 7.5 |
postponed | [WTS] [JSN] | |||
R5-214106 | LS on FR2 relative power tolerance |
LS out LS To: TSG RAN WG4 revision of R5-213282 |
TSG WG RAN5 | 5GS_NR_LTE-UEConTest |
R5-91-e AI: 7.5 |
postponed | [WTS] [JSN] |
13 documents (0.34837603569031 seconds)