Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-1719415 | Remaining issues on scheduling, feedback and power control for SUL | other | Huawei, HiSilicon |
R1-91 AI: 7.5 |
noted | [WTS] [JSN] | |||
R1-1719803 | Remaining issues on harmonic interference handling | discussion | vivo |
R1-91 AI: 7.5 |
noted | [WTS] [JSN] | |||
R1-1719943 | Remaing issues on NR LTE coexistence | discussion | LG Electronics |
R1-91 AI: 7.5 |
noted | [WTS] [JSN] | |||
R1-1720106 | Remaining issues of NR-LTE coexistence | discussion | Intel Corporation | Rel-15 |
R1-91 AI: 7.5 |
noted | [WTS] [JSN] | ||
R1-1720214 | Remaining issues on LTE/NR coexistence |
discussion revision of R1-1717849 |
CATT |
R1-91 AI: 7.5 |
available | [WTS] [JSN] | |||
R1-1720219 | Some remaining issues with SUL | discussion | ZTE, Sanechips |
R1-91 AI: 7.5 |
available | [WTS] [JSN] | |||
R1-1720359 | On LTE-NR Coexistence | other | Samsung |
R1-91 AI: 7.5 |
noted | [WTS] [JSN] | |||
R1-1720446 | Remaining coex-related issues |
discussion revised to R1-1721424 |
Ericsson |
R1-91 AI: 7.5 |
revised | [WTS] [JSN] | |||
R1-1720483 | On LTE HARQ ACK feedback in 1Tx EN-DC | discussion | Nokia, Nokia Shanghai Bell |
R1-91 AI: 7.5 |
noted | [WTS] [JSN] | |||
R1-1720558 | Aspects related to Supplementary Uplink | discussion | InterDigital, Inc. | NR_newRAT-Core | Rel-15 |
R1-91 AI: 7.5 |
available | [WTS] [JSN] | |
R1-1720705 | NR LTE Coexistence Considerations | discussion | Qualcomm Incorporated | Rel-15 |
R1-91 AI: 7.5 |
withdrawn | [WTS] [JSN] | ||
R1-1721424 | Remaining coex-related issues |
discussion revision of R1-1720446 |
Ericsson |
R1-91 AI: 7.5 |
available | [WTS] [JSN] | |||
R1-1721444 | WF on LTE scheduling/HARQ timing for EN-DC UEs | discussion | vivo, OPPO, China Telecom, Xiaomi, ZTE, Orange, CMCC, China Unicom |
R1-91 AI: 7.5 |
noted | [WTS] [JSN] | |||
R1-1721449 | WF on remaining aspects on SUL operations |
discussion revised to R1-1721693 |
Huawei, HiSilicon |
R1-91 AI: 7.5 |
revised | [WTS] [JSN] | |||
R1-1721542 | WF on the granularity of backhaul signaling to consider LTE LR for single UL Tx and UL DL TDM | discussion | LG Electronics |
R1-91 AI: 7.5 |
available | [WTS] [JSN] | |||
R1-1721658 | Chairman's notes of AI 7.5 NR-LTE co-existence | other | Ad-Hoc chair (Ericsson) |
R1-91 AI: 7.5 |
endorsed | [WTS] [JSN] | |||
R1-1721693 | WF on remaining aspects on SUL operations |
other revision of R1-1721449 |
Huawei, HiSilicon, CMCC, Ericsson, Intel |
R1-91 AI: 7.5 |
noted | [WTS] [JSN] | |||
R1-1721697 | WF on UL Fallback DCI in SUL cell | discussion | CMCC, Huawei, HiSilicon, Ericsson |
R1-91 AI: 7.5 |
noted | [WTS] [JSN] |
18 documents (0.35642194747925 seconds)