Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R2-2309547 Discussion on subsequent CPAC discussion CATT NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2309722 Remaining issues for subsequent CPAC discussion vivo NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2309831 Summary of [Post123][054][feMob] Discussion on stage-2 signalling open issues discussion ZTE Corporation, Sanechips NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2309835 Remaining issues on subsequent CPAC discussion ZTE Corporation, Sanechips NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2309852 Considerations on Subsequent CPAC after SCG Change discussion Samsung NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2309908 Discussion on Subsequent CPAC discussion FGI R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2309948 Left issues on subsequent CPAC discussion Lenovo Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2310006 Discussion on issues of subsequent CPAC discussion Spreadtrum Communications Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2310019 Discussion on Selective Activation of Cell Groups in NR-DC discussion Transsion Holdings Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2310268 Discussion on remaining open issues for subsequent CPAC discussion CMCC NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2310326 Discussion on Subsequent CPAC discussion Apple NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2310337 UE reporting of sk-counter for S-CPAC discussion Apple NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2310377 Discussion on open issues for subsequent CPAC in NR-DC discussion OPPO NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2310529 Subsequent CPAC in NR-DC discussion Qualcomm Incorporated Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2310573 Discussion on the evaluation adjustment for SCPAC discussion

revision of R2-2307889

ITRI NR_Mob_enh2-Core R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2310620 Discussion on subsequent CPAC discussion Xiaomi NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2310647 Discussion on subsequent CPAC discussion NEC NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2310873 Discussion on subsequent CPAC discussion

revision of R2-2308756

MediaTek Inc. NR_Mob_enh2-Core R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2310890 Discussion on subsequent CPAC discussion Ericsson NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2310987 Open issues regarding subsequent CPAC discussion Interdigital Inc. NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2311002 Subsequent CPAC discussion Huawei, HiSilicon NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

noted [WTS] [JSN]
R2-2311010 Rapporteur summary Post[123][046][feMob] subsequent CPAC security issues discussion Nokia, Nokia Shanghai Bell R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2311011 Discussion on Measurements, Reference Configuration, Security Issues, and Failure Handling for SCPAC discussion Nokia, Nokia Shanghai Bell R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2311096 Stage 2 and 3 issues for Subsequent CPC discussion LG Electronics Inc. NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2311147 Remaining issues for security aspects of Subsequent CPAC discussion Sharp NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2311148 Discussion on subsequent CPAC discussion Sharp NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2311163 Discussion on security issue for subsequent CPAC discussion NTT DOCOMO, INC. R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2311195 Discussion on NR-DC with subsequent CPAC. discussion DENSO CORPORATION NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

available [WTS] [JSN]
R2-2311331 LS on RAN2 progress on subsequent CPAC LS out

LS To: RAN3

revision of R2-2311535

RAN2 NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

approved [WTS] [JSN]
R2-2311535 [DRAFT] LS on RAN2 progress on subsequent CPAC LS out

LS To: RAN3

revised to R2-2311331

ZTE Corporation, Sanechips NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

revised [WTS] [JSN]
R2-2311538 Rapporteur summary [[AT123bis][503][feMob] subsequent CPAC security issues (Nokia) discussion Nokia, Nokia Shanghai Bell NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

noted [WTS] [JSN]
R2-2311605 RRC running CR for subsequent CPAC in NR-DC draftCR

revision of R2-2310375

OPPO NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

endorsed [WTS] [JSN]
R2-2311607 Reply LS on security for selective SCG activation LS out

LS is reply to R2-2307070

LS To: SA3

revised to R2-2311618

RAN2 NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

revised [WTS] [JSN]
R2-2311618 Reply LS on security for selective SCG activation LS out

LS is reply to R2-2307070

LS To: SA3

revision of R2-2311607

RAN2 NR_Mob_enh2-Core Rel-18 R2-123-bis

AI: 7.4.3

approved [WTS] [JSN]

34 documents (0.32092595100403 seconds)