Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2503506 draftCR on MTTD/MRTD for intra-band non-collocated scenarios Phase 2 draftCR

revised to R4-2504942

Nokia, Nokia Shanghai Bell NonCol_intraB_ENDC_NR_CA_Ph2-Core Rel-19 R4-114-bis

AI: 7.4.2

revised [WTS] [JSN]
R4-2503507 RRM requirements for intra-band non-collocated scenarios Phase2 discussion Nokia, Nokia Shanghai Bell NonCol_intraB_ENDC_NR_CA_Ph2-Core Rel-19 R4-114-bis

AI: 7.4.2

noted [WTS] [JSN]
R4-2503860 draftCR on SCell Activation Delay Requirement for NonCol_intraB draftCR

revised to R4-2504943

ZTE Corporation, Sanechips NonCol_intraB_ENDC_NR_CA_Ph2-Core Rel-19 R4-114-bis

AI: 7.4.2

revised [WTS] [JSN]
R4-2503881 Discussion on RRM requirements for supporting intra-band non-collocated EN-DC/NR-CA deployment Phase2: new receiver type(s) discussion Huawei, HiSilicon NonCol_intraB_ENDC_NR_CA_Ph2 R4-114-bis

AI: 7.4.2

noted [WTS] [JSN]
R4-2503882 Draft CR on RRM requirements for supporting intra-band non-collocated EN-DC/NR-CA deployment Phase2: new receiver type(s) draftCR

revised to R4-2504944

Huawei, HiSilicon NonCol_intraB_ENDC_NR_CA_Ph2 Rel-19 R4-114-bis

AI: 7.4.2

revised [WTS] [JSN]
R4-2504199 Remaining requirements for type 4 UEs in non-colocated scenario other Ericsson NonCol_intraB_ENDC_NR_CA_Ph2-Core Rel-19 R4-114-bis

AI: 7.4.2

noted [WTS] [JSN]
R4-2504200 DraftCR: Scheduling availability of UE during radio link monitoring draftCR

revised to R4-2504945

Ericsson NonCol_intraB_ENDC_NR_CA_Ph2-Core Rel-19 R4-114-bis

AI: 7.4.2

revised [WTS] [JSN]
R4-2504201 DraftCR: Scheduling availability of UE performing beam failure detection + L1-RSRP draftCR

revised to R4-2504946

Ericsson NonCol_intraB_ENDC_NR_CA_Ph2-Core Rel-19 R4-114-bis

AI: 7.4.2

revised [WTS] [JSN]
R4-2504292 Draft CR on interruption requirements for Type 4 EN-DCNR-CA draftCR

revised to R4-2504947

Samsung NonCol_intraB_ENDC_NR_CA_Ph2-Core Rel-19 R4-114-bis

AI: 7.4.2

revised [WTS] [JSN]
R4-2504942 draftCR on MTTD/MRTD for intra-band non-collocated scenarios Phase 2 draftCR

revision of R4-2503506

Nokia, Nokia Shanghai Bell NonCol_intraB_ENDC_NR_CA_Ph2-Core Rel-19 R4-114-bis

AI: 7.4.2

withdrawn [WTS] [JSN]
R4-2504943 draftCR on SCell Activation Delay Requirement for NonCol_intraB draftCR

revision of R4-2503860

ZTE Corporation, Sanechips NonCol_intraB_ENDC_NR_CA_Ph2-Core Rel-19 R4-114-bis

AI: 7.4.2

withdrawn [WTS] [JSN]
R4-2504944 Draft CR on RRM requirements for supporting intra-band non-collocated EN-DC/NR-CA deployment Phase2: new receiver type(s) draftCR

revision of R4-2503882

Huawei, HiSilicon NonCol_intraB_ENDC_NR_CA_Ph2 Rel-19 R4-114-bis

AI: 7.4.2

endorsed [WTS] [JSN]
R4-2504945 DraftCR: Scheduling availability of UE during radio link monitoring draftCR

revision of R4-2504200

Ericsson NonCol_intraB_ENDC_NR_CA_Ph2-Core Rel-19 R4-114-bis

AI: 7.4.2

withdrawn [WTS] [JSN]
R4-2504946 DraftCR: Scheduling availability of UE performing beam failure detection + L1-RSRP draftCR

revision of R4-2504201

Ericsson NonCol_intraB_ENDC_NR_CA_Ph2-Core Rel-19 R4-114-bis

AI: 7.4.2

withdrawn [WTS] [JSN]
R4-2504947 Draft CR on interruption requirements for Type 4 EN-DCNR-CA draftCR

revision of R4-2504292

Samsung NonCol_intraB_ENDC_NR_CA_Ph2-Core Rel-19 R4-114-bis

AI: 7.4.2

withdrawn [WTS] [JSN]
R4-2504975 Draft big CR on RRM requirements for Support of intra-band non-collocated EN-DC/NR-CA deployment Phase 2 draftCR Huawei, HiSilicon NonCol_intraB_ENDC_NR_CA_Ph2-Core Rel-19 R4-114-bis

AI: 7.4.2

endorsed [WTS] [JSN]

16 documents (0.39098119735718 seconds)