Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R2-1806732 Consideration on handling Pmax in HPUE discussion KDDI Corporation R2-102

AI: 7.3.2

noted [WTS] [JSN]
R2-1806733 Handling of Pmax for PC2 and uplink intra-band contiguous CA capable UEs CR

revised to R2-1808877

KDDI, Ericsson, Qualcomm 36.331 13.9.1 CR#3392 catF LTE_CA_C_B41_PC2 Rel-13 R2-102

AI: 7.3.2

revised [WTS] [JSN]
R2-1806734 Handling of Pmax for PC2 and uplink intra-band contiguous CA capable UEs CR

revised to R2-1808878

KDDI, Ericsson, Qualcomm 36.331 14.6.2 CR#3393 catA LTE_CA_C_B41_PC2 Rel-14 R2-102

AI: 7.3.2

revised [WTS] [JSN]
R2-1806735 Handling of Pmax for PC2 and uplink intra-band contiguous CA capable UEs CR

revised to R2-1808879

KDDI, Ericsson, Qualcomm 36.331 15.1.0 CR#3394 catA LTE_CA_C_B41_PC2 Rel-15 R2-102

AI: 7.3.2

revised [WTS] [JSN]
R2-1807525 Correction to handling of p-Max procedure for high-power UEs CR

revised to R2-1808880

Intel Corporation 36.331 13.9.1 CR#3428 catF TEI13 Rel-13 R2-102

AI: 7.3.2

revised [WTS] [JSN]
R2-1807526 Correction to handling of p-Max procedure for high-power UEs CR

revised to R2-1808881

Intel Corporation 36.331 14.6.2 CR#3429 catA TEI13 Rel-14 R2-102

AI: 7.3.2

revised [WTS] [JSN]
R2-1807527 Correction to handling of p-Max procedure for high-power UEs CR

revised to R2-1808882

Intel Corporation 36.331 15.1.0 CR#3430 catA TEI13 Rel-15 R2-102

AI: 7.3.2

revised [WTS] [JSN]
R2-1808877 Handling of Pmax for PC2 and uplink intra-band contiguous CA capable UEs CR

revision of R2-1806733

KDDI, Ericsson, Qualcomm 36.331 13.9.1 CR#33921 catF LTE_CA_C_B41_PC2 Rel-13 R2-102

AI: 7.3.2

agreed [WTS] [JSN]
R2-1808878 Handling of Pmax for PC2 and uplink intra-band contiguous CA capable UEs CR

revision of R2-1806734

KDDI, Ericsson, Qualcomm 36.331 14.6.2 CR#33931 catF LTE_CA_C_B41_PC2 Rel-14 R2-102

AI: 7.3.2

agreed [WTS] [JSN]
R2-1808879 Handling of Pmax for PC2 and uplink intra-band contiguous CA capable UEs CR

revision of R2-1806735

KDDI, Ericsson, Qualcomm 36.331 15.1.0 CR#33941 catF LTE_CA_C_B41_PC2 Rel-15 R2-102

AI: 7.3.2

agreed [WTS] [JSN]
R2-1808880 Correction to handling of p-Max procedure for high-power UEs CR

revision of R2-1807525

Intel Corporation 36.331 13.9.1 CR#34281 catF TEI13 Rel-13 R2-102

AI: 7.3.2

agreed [WTS] [JSN]
R2-1808881 Correction to handling of p-Max procedure for high-power UEs CR

revision of R2-1807526

Intel Corporation 36.331 14.6.2 CR#34291 catA TEI13 Rel-14 R2-102

AI: 7.3.2

agreed [WTS] [JSN]
R2-1808882 Correction to handling of p-Max procedure for high-power UEs CR

revision of R2-1807527

Intel Corporation 36.331 15.1.0 CR#34301 catA TEI13 Rel-15 R2-102

AI: 7.3.2

agreed [WTS] [JSN]

13 documents (0.33992099761963 seconds)