Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R4-2505355 | On core requirements for on-demand SIB1 | discussion | Qualcomm Technologies Ireland |
R4-115 AI: 7.27.3.3 |
noted | [WTS] [JSN] | |||
| R4-2505664 | On remaining issues for on-demand SIB1 in R19 NES | discussion | vivo | Netw_Energy_NR_enh-Core |
R4-115 AI: 7.27.3.3 |
noted | [WTS] [JSN] | ||
| R4-2505704 | On RRM requirement for on-demand SIB1 | other | OPPO | Netw_Energy_NR_enh-Core | Rel-19 |
R4-115 AI: 7.27.3.3 |
noted | [WTS] [JSN] | |
| R4-2505705 | draftCR on requirements for interruption in paging reception |
draftCR revised to R4-2508425 |
OPPO | Netw_Energy_NR_enh-Core | Rel-19 |
R4-115 AI: 7.27.3.3 |
postponed | [WTS] [JSN] | |
| R4-2505874 | Discussion on on-demand SIB1 | discussion | Apple | Netw_Energy_NR_enh-Core |
R4-115 AI: 7.27.3.3 |
noted | [WTS] [JSN] | ||
| R4-2506100 | Discussion on RRM requirements for On-demand SIB1 | discussion | CATT | Netw_Energy_NR_enh-Core | Rel-19 |
R4-115 AI: 7.27.3.3 |
noted | [WTS] [JSN] | |
| R4-2506296 | Discussion on RRM requirements of on-demand SIB1 for Rel-19 NES | discussion | LG Electronics Inc. | Netw_Energy_NR_enh-Core | Rel-19 |
R4-115 AI: 7.27.3.3 |
noted | [WTS] [JSN] | |
| R4-2506343 | Discussion on On-demand SIB1 for enhancements of NES for NR | discussion | China Telecom | Netw_Energy_NR_enh-Core |
R4-115 AI: 7.27.3.3 |
noted | [WTS] [JSN] | ||
| R4-2506424 | draftCR on Introduce timing requirements for UL-WUS for OD-SIB1 |
draftCR revised to R4-2508426 |
CMCC | Netw_Energy_NR_enh-Core | Rel-19 |
R4-115 AI: 7.27.3.3 |
revised | [WTS] [JSN] | |
| R4-2506425 | Discussion on RRM requirement of OD-SIB1 for NES enhancement | discussion | CMCC | Netw_Energy_NR_enh-Core | Rel-19 |
R4-115 AI: 7.27.3.3 |
noted | [WTS] [JSN] | |
| R4-2506484 | Discussion on RRM requirements for OD-SIB1 | discussion | MediaTek inc. | Netw_Energy_NR_enh-Core | Rel-19 |
R4-115 AI: 7.27.3.3 |
noted | [WTS] [JSN] | |
| R4-2506709 | Discussion on RRM impact for OD-SIB1 | discussion | Huawei, HiSilicon | Netw_Energy_NR_enh-Core |
R4-115 AI: 7.27.3.3 |
noted | [WTS] [JSN] | ||
| R4-2506906 | Discussion on OD-SIB1 in Rel-19 NES | discussion | Ericsson | Netw_Energy_NR_enh-Core | Rel-19 |
R4-115 AI: 7.27.3.3 |
noted | [WTS] [JSN] | |
| R4-2507354 | RRM requirements for On-demand-SIB1 | discussion | Nokia, Nokia Shanghai Bell | Netw_Energy_NR_enh-Core | Rel-19 |
R4-115 AI: 7.27.3.3 |
noted | [WTS] [JSN] | |
| R4-2508425 | draftCR on requirements for interruption in paging reception |
draftCR revision of R4-2505705 |
OPPO | Netw_Energy_NR_enh-Core | Rel-19 |
R4-115 AI: 7.27.3.3 |
withdrawn | [WTS] [JSN] | |
| R4-2508426 | draftCR on Introduce timing requirements for UL-WUS for OD-SIB1 |
draftCR revision of R4-2506424 |
CMCC | Netw_Energy_NR_enh-Core | Rel-19 |
R4-115 AI: 7.27.3.3 |
endorsed | [WTS] [JSN] |
16 documents (0.41737508773804 seconds)