Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2505353 On core requirements for on-demand SSB SCell operation discussion Qualcomm Technologies Ireland R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2505662 On remaining issues for on-demand SSB SCell operation in R19 NES discussion vivo Netw_Energy_NR_enh-Core R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2505672 Draft CR for Scheduling for L1-SINR measurements for Reporting for NES draftCR vivo Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]
R4-2505702 On RRM requirements of on-demand SSB SCell operation other OPPO Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2505777 Discussion on OD-SSB requirements discussion Xiaomi Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2505779 draftCR on Rel19 NES (8.2.2.2.2 Interruptions at SCell activation/deactivation) draftCR Xiaomi NR_IoT_NTN_req_test_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]
R4-2505780 draftCR on Rel19 NES (8.2.2.2.3 interruption during measurements on deactivated SCC) draftCR Xiaomi NR_IoT_NTN_req_test_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]
R4-2505870 Discussion on on-demand SSB SCell operation discussion Apple Netw_Energy_NR_enh-Core R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2505871 DraftCR of interruptions for OD-SSB transmission draftCR Apple Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]
R4-2506098 Discussion on RRM requirements for on-demand SSB SCell operation discussion CATT Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2506099 Draft CR to TS 38.133 on carrier-specific scaling factor for OD-SSB draftCR CATT Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]
R4-2506205 RRM requirements for OD-SSB SCell operation discussion Nokia, Nokia Shanghai Bell Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2506206 draftCR on OD-SSB based SCell activation delay with L3 reporting draftCR Nokia, Nokia Shanghai Bell Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]
R4-2506294 Discussion on RRM requirements of on-demand SSB Scell operation for Rel-19 NES discussion LG Electronics Inc. Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2506298 Draft CR for NES for SCell Deactivation Delay Requirement for Activated SCell draftCR LG Electronics Inc. Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]
R4-2506340 Discussion on On-demand SSB SCell operation for enhancements of NES for NR discussion China Telecom Netw_Energy_NR_enh-Core R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2506341 Draft CR on OD-SSB based L1-RSRP measurements for Reporting draftCR China Telecom Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]
R4-2506421 draftCR on Introduce OD-SSB based direct SCell Activation requirement at SCell addition draftCR CMCC Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]
R4-2506422 Discussion on RRM requirement of OD-SSB for NES enhancement discussion CMCC Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2506482 Discussion on RRM requirements for OD-SSB for network energy saving discussion MediaTek inc. Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2506483 DraftCR on introduction and measurement restriction for L1-SINR measurement draftCR MediaTek inc. Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]
R4-2506705 Discussion on RRM impact for Rel-19 NES OD-SSB discussion Huawei, HiSilicon Netw_Energy_NR_enh-Core R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2506706 DraftCR on OD-SSB based SCell Activation Delay Requirement for Deactivated PUCCH SCell draftCR Huawei, HiSilicon Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

not pursued [WTS] [JSN]
R4-2506824 Discussion on RRM requirements for On-demand SSB SCell operations discussion Intel Corporation R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2506825 DraftCR for scheduling availability during UE intra-frequency measurements based on OD-SSB draftCR Intel Corporation Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]
R4-2506904 Discussion on OD-SSB in Rel-19 NES discussion Ericsson Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2506910 draftCR on OD-SSB based NR intra-frequency measurements draftCR Ericsson Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]
R4-2507252 Discussion on RRM requirements for NES OD-SSB discussion Samsung Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2507254 Draft CR on OD-SSB based SCell Activation Delay Requirement for Deactivated SCell draftCR Samsung Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]
R4-2507286 Discussion on On-demand SSB SCell operation of R19 NES discussion ZTE Corporation, Sanechips Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

noted [WTS] [JSN]
R4-2507298 Draft CR on scheduling restriction of L1-RSRP measurement of R19 NES draftCR ZTE Corporation, Sanechips Netw_Energy_NR_enh-Core Rel-19 R4-115

AI: 7.27.3.1

postponed [WTS] [JSN]

31 documents (0.40056777000427 seconds)