Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-1702908 | Enhanced CRS-IM PDSCH performance requirements | discussion | Intel Corporation | LTE_eCRSIM_eSUMIMO |
R4-82 AI: 7.27.2.1 |
noted | [WTS] [JSN] | ||
R4-1702909 | Summary of Enhanced CRS-IM PDSCH simulation results (FDD) | other | Intel Corporation | LTE_eCRSIM_eSUMIMO |
R4-82 AI: 7.27.2.1 |
noted | [WTS] [JSN] | ||
R4-1703031 | PDSCH demodulation performance of Enhanced CRS-IM |
discussion revised to R4-1704166 |
CATT | LTE_eCRSIM_eSUMIMO | Rel-14 |
R4-82 AI: 7.27.2.1 |
revised | [WTS] [JSN] | |
R4-1703154 | Simulation results for PDSCH demodulation performance of enhanced CRS-IM receiver UE | other | Qualcomm Incorporated | LTE_eCRSIM_eSUMIMO |
R4-82 AI: 7.27.2.1 |
noted | [WTS] [JSN] | ||
R4-1703252 | Simulation results for PDSCH performance of enhanced CRS-IM | discussion | LG Electronics Inc. |
R4-82 AI: 7.27.2.1 |
noted | [WTS] [JSN] | |||
R4-1703308 | Simulation results for eCRS-IM PDSCH demodulation | discussion | ZTE, ZTE Microelectronics | LTE_eCRSIM_eSUMIMO | Rel-14 |
R4-82 AI: 7.27.2.1 |
noted | [WTS] [JSN] | |
R4-1704166 | PDSCH demodulation performance of Enhanced CRS-IM |
discussion revision of R4-1703031 |
CATT | LTE_eCRSIM_eSUMIMO | Rel-14 |
R4-82 AI: 7.27.2.1 |
noted | [WTS] [JSN] | |
R4-1704271 | Way forward on CRS-IM capability and assistance signaling | other | Qualcomm, Intel, CATT |
R4-82 AI: 7.27.2.1 |
noted | [WTS] [JSN] |
8 documents (0.3437488079071 seconds)