Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R4-2509034 | Additional comments on core requirements for on-demand SSB SCell operation | discussion | Qualcomm Technologies Ireland |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | |||
| R4-2509220 | Discussion on RRM requirements for OD-SSB for network energy saving | discussion | MediaTek inc. | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | |
| R4-2509221 | DraftCR on introduction and measurement restriction for L1-SINR measurement |
draftCR revised to R4-2512250 |
MediaTek inc. | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2509280 | Discussion on RRM requirements for on-demand SSB SCell operation | discussion | CATT | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | |
| R4-2509281 | Draft CR to TS 38.133 on carrier-specific scaling factor for R19 NES |
draftCR revised to R4-2512251 |
CATT | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2509282 | Draft CR to TS 38.133 on intra-frequency measurements without measurement gaps for R19 NES |
draftCR revised to R4-2512252 |
CATT | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
not pursued | [WTS] [JSN] | |
| R4-2509450 | Discussion on on-demand SSB SCell operation | discussion | Apple | Netw_Energy_NR_enh-Core |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | ||
| R4-2509451 | DraftCR of interruptions for OD-SSB transmission |
draftCR revised to R4-2512253 |
Apple | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2509623 | RRM requirements for on-demand SCell operation | discussion | Nokia, Nokia Shanghai Bell | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | |
| R4-2509624 | Draft CR on OD-SSB based SCell activation delay with L3 reporting |
draftCR revised to R4-2512254 |
Nokia, Nokia Shanghai Bell | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2509626 | Discussion on RRM requirements of on-demand SSB Scell operation for Rel-19 NES | discussion | LG Electronics Inc. | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | |
| R4-2509630 | Draft CR for OD-SSB based SCell Deactivation Delay Requirement for Activated SCell |
draftCR revised to R4-2512255 |
LG Electronics Inc. | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2509693 | On RRM requirements of on-demand SSB SCell operation | other | OPPO | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | |
| R4-2509694 | Draft CR on OD-SSB related RRM requirements |
draftCR revised to R4-2512256 |
OPPO | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2509789 | Discussion on OD-SSB requirements | discussion | Xiaomi | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
withdrawn | [WTS] [JSN] | |
| R4-2509795 | Discussion on OD-SSB requirements | discussion | Xiaomi | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | |
| R4-2509797 | draftCR on Rel19 NES (8.2.2.2.1 Interruptions at SCell addition/release) |
draftCR revised to R4-2512257 |
Xiaomi | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2509798 | draftCR on Rel19 NES (8.2.2.2.2 Interruptions at SCell activation/deactivation) |
draftCR revised to R4-2512258 |
Xiaomi | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2509799 | draftCR on Rel19 NES (8.2.2.2.3 interruption during measurements on deactivated SCC) |
draftCR revised to R4-2512259 |
Xiaomi | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2509926 | DraftCR: Scheduling availability during UE intra-frequency measurements based on OD-SSB | draftCR | Intel Corporation | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2510026 | Discussion on RRM requirement of OD-SSB for NES enhancement | discussion | CMCC | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | |
| R4-2510027 | (Netw_Energy_NR_enh-Core) draftCR on Introduce OD-SSB based direct SCell Activation requirement at SCell addition |
draftCR revised to R4-2512260 |
CMCC | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2510089 | Discussion on On-demand SSB SCell operation for enhancements of NES for NR | discussion | China Telecom | Netw_Energy_NR_enh-Core |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | ||
| R4-2510090 | Draft CR on OD-SSB based L1-RSRP measurements for Reporting | draftCR | China Telecom | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2510190 | Discussion on remaining issues for on-demand SSB SCell operation in R19 NES | discussion | vivo | Netw_Energy_NR_enh-Core |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | ||
| R4-2510196 | Draft CR for Scheduling for L1-SINR measurements for Reporting and minimum requirements at transitions |
draftCR revised to R4-2512261, R4-2512262 |
vivo | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2510596 | Discussion on RRM impact for Rel-19 NES OD-SSB | discussion | Huawei, HiSilicon |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | |||
| R4-2510597 | DraftCR on OD-SSB based SCell Activation Delay Requirement for Deactivated PUCCH SCell | draftCR | Huawei, HiSilicon | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2510680 | Discussion on On-demand SSB SCell operation of R19 NES | discussion | ZTE Corporation, Sanechips | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | |
| R4-2510721 | Draft CR on scheduling restriction of L1-RSRP measurement of R19 NES | draftCR | ZTE Corporation, Sanechips | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2510722 | Draft CR on transition requirements of L1-RSRP measurement for R19 NES |
draftCR revised to R4-2512264 |
ZTE Corporation, Sanechips | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2510913 | Discussion on OD-SSB in Rel-19 NES | discussion | Ericsson | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | |
| R4-2510917 | draftCR on OD-SSB based NR intra-frequency measurements |
draftCR revised to R4-2512265 |
Ericsson | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2511081 | Discussion on RRM requirements for NES OD-SSB | discussion | Samsung | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
noted | [WTS] [JSN] | |
| R4-2511084 | Draft CR on OD-SSB based SCell Activation Delay Requirement for Deactivated SCell |
draftCR revised to R4-2512266 |
Samsung | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2512250 | DraftCR on introduction and measurement restriction for L1-SINR measurement |
draftCR revision of R4-2509221 |
MediaTek inc. | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2512251 | Draft CR to TS 38.133 on carrier-specific scaling factor for R19 NES |
draftCR revision of R4-2509281 |
CATT | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2512252 | Draft CR to TS 38.133 on intra-frequency measurements without measurement gaps for R19 NES |
draftCR revision of R4-2509282 |
CATT | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
withdrawn | [WTS] [JSN] | |
| R4-2512253 | DraftCR of interruptions for OD-SSB transmission |
draftCR revision of R4-2509451 |
Apple | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
withdrawn | [WTS] [JSN] | |
| R4-2512254 | Draft CR on OD-SSB based SCell activation delay with L3 reporting |
draftCR revision of R4-2509624 |
Nokia, Nokia Shanghai Bell | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2512255 | Draft CR for OD-SSB based SCell Deactivation Delay Requirement for Activated SCell |
draftCR revision of R4-2509630 |
LG Electronics Inc. | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2512256 | Draft CR on OD-SSB related RRM requirements |
draftCR revision of R4-2509694 |
OPPO | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2512257 | draftCR on Rel19 NES (8.2.2.2.1 Interruptions at SCell addition/release) |
draftCR revision of R4-2509797 |
Xiaomi | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2512258 | draftCR on Rel19 NES (8.2.2.2.2 Interruptions at SCell activation/deactivation) |
draftCR revision of R4-2509798 |
Xiaomi | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2512259 | draftCR on Rel19 NES (8.2.2.2.3 interruption during measurements on deactivated SCC) |
draftCR revision of R4-2509799 revised to R4-2512344 |
Xiaomi | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2512260 | (Netw_Energy_NR_enh-Core) draftCR on Introduce OD-SSB based direct SCell Activation requirement at SCell addition |
draftCR revision of R4-2510027 |
CMCC | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2512261 | Draft CR for Scheduling for L1-SINR measurements for Reporting and minimum requirements at transitions |
draftCR revision of R4-2510196 |
vivo | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2512262 | Draft CR for Scheduling for L1-SINR measurements for Reporting and minimum requirements at transitions |
draftCR revision of R4-2510196 revised to R4-2512345 |
vivo | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
revised | [WTS] [JSN] | |
| R4-2512264 | Draft CR on transition requirements of L1-RSRP measurement for R19 NES |
draftCR revision of R4-2510722 |
ZTE Corporation, Sanechips | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2512265 | draftCR on OD-SSB based NR intra-frequency measurements |
draftCR revision of R4-2510917 |
Ericsson | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2512266 | Draft CR on OD-SSB based SCell Activation Delay Requirement for Deactivated SCell |
draftCR revision of R4-2511084 |
Samsung | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2512344 | draftCR on Rel19 NES (8.2.2.2.3 interruption during measurements on deactivated SCC) |
draftCR revision of R4-2512259 |
Xiaomi | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2512345 | Draft CR for Scheduling for L1-SINR measurements for Reporting and minimum requirements at transitions |
draftCR revision of R4-2512262 |
vivo | Netw_Energy_NR_enh-Core | Rel-19 |
R4-116 AI: 7.23.3.1 |
endorsed | [WTS] [JSN] |
53 documents (0.38854312896729 seconds)