Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-1911859 | Discussion on physical layer control procedures for NTN | other | Huawei, HiSilicon |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | |||
R1-1912123 | Physical layer control procedure in NR-NTN | discussion | MediaTek Inc. | Rel-16 |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | ||
R1-1912164 | Physical layer control procedure enhancement | discussion | CATT |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | |||
R1-1912211 | On physical layer control procedures for NTN | discussion | Intel Corporation | Rel-16 |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | ||
R1-1912246 | Discussion on physical layer control procedures for NTN | discussion | Asia Pacific Telecom co. Ltd |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | |||
R1-1912347 | Discussion on physical layer control procedures |
discussion revision of R1-1910746 |
Sony |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | |||
R1-1912469 | Physical layer control procedures in NTN | discussion | Samsung |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | |||
R1-1912535 | Discussion on UL transmission timing for NTN | discussion | CMCC |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | |||
R1-1912611 | Discussion on the physical control procedure for NTN | discussion | ZTE |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | |||
R1-1912722 | TP for Section 6.2 in TR 38.821 on NTN PHY control procedures |
discussion revised to R1-1913402 |
Ericsson | FS_NR_NTN_solutions |
R1-99 AI: 7.2.5.2 |
revised | [WTS] [JSN] | ||
R1-1912724 | On physical layer control procedures for NTN | discussion | Ericsson |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | |||
R1-1912902 | Discussion on beam management and polarization for NTN | discussion | Panasonic Corporation |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | |||
R1-1912955 | Physical Layer Procedures for NTN | discussion | Qualcomm Incorporated | FS_NR_NTN_solutions | Rel-16 |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | |
R1-1913016 | Considerations on Physical Layer Control Procedure in NTN | discussion | Nokia, Nokia Shanghai Bell |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | |||
R1-1913131 | Considerations on satellite beam management, control loops and feeder link switch over | discussion | THALES |
R1-99 AI: 7.2.5.2 |
not treated | [WTS] [JSN] | |||
R1-1913302 | Feature lead summary #1 on NTN physical layer control procedures |
discussion revised to R1-1913401 |
Ericsson | FS_NR_NTN_solutions | Rel-16 |
R1-99 AI: 7.2.5.2 |
noted | [WTS] [JSN] | |
R1-1913401 | Feature lead summary #2 on NTN physical layer control procedures |
discussion revision of R1-1913302 |
Ericsson | FS_NR_NTN_solutions | Rel-16 |
R1-99 AI: 7.2.5.2 |
noted | [WTS] [JSN] | |
R1-1913402 | TP for Section 6.2 in TR 38.821 on NTN PHY control procedures |
discussion revision of R1-1912722 |
Ericsson | FS_NR_NTN_solutions |
R1-99 AI: 7.2.5.2 |
endorsed | [WTS] [JSN] |
18 documents (0.3572199344635 seconds)