Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R1-1909982 Physical layer control procedure in NR-NTN discussion MediaTek Inc. Rel-16 R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1910063 Discussion on physical layer control procedures for NTN other Huawei, HiSilicon R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1910192 Discussion on the physical control procedure for NTN other Pengcheng laboratory R1-98

AI: 7.2.5.2

withdrawn [WTS] [JSN]
R1-1910337 Physical layer control procedure enhancement discussion CATT R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1910363 Discussion on the physical control procedure for NTN discussion ZTE R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1910386 NTN control procedure for physical layer other OPPO R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1910480 Physical layer control procedures in NTN discussion Samsung R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1910657 On physical layer control procedures for NTN discussion Intel Corporation Rel-16 R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1910746 Discussion on physical layer control procedures discussion

revision of R1-1908774

revised to R1-1912347

Sony R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1910845 Discussion on physical layer control procedures for NTN discussion Asia Pacific Telecom co. Ltd R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1910863 Discussion on the physical control procedure for NTN discussion Pengcheng laboratory R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1910981 On physical layer control procedures for NTN discussion Ericsson R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1911003 On physical layer control procedures for NTN discussion Panasonic Corporation R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1911114 Physical Layer Procedures for NTN discussion Qualcomm Incorporated FS_NR_NTN_solutions Rel-16 R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1911219 Considerations on UL Power Control, AMC and CSI in NTN discussion Nokia, Nokia Shanghai Bell FS_NR_NTN_solutions R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1911430 FL summary#0 for physical layer control procedures for NTN discussion Ericsson FS_NR_NTN_solutions Rel-16 R1-98

AI: 7.2.5.2

not treated [WTS] [JSN]
R1-1911487 Tuesday offline discussion on NTN physical layer control procedures discussion Ericsson FS_NR_NTN_solutions Rel-16 R1-98

AI: 7.2.5.2

noted [WTS] [JSN]
R1-1911565 Wednesday offline discussion on NTN physical layer control procedures discussion Ericsson FS_NR_NTN_solutions Rel-16 R1-98

AI: 7.2.5.2

noted [WTS] [JSN]

18 documents (0.3598051071167 seconds)