Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-156275 | Conducted Output Power Requirements for AAS BS | pCR | NEC | 37.842 | AAS_BS_LTE_UTRA-Core | Rel-13 |
R4-76 AI: 7.2.2.2 |
noted | [WTS] [JSN] |
R4-156353 | Wanted emissions limits | other | Ericsson | AAS_BS_LTE_UTRA-Core | Rel-13 |
R4-76 AI: 7.2.2.2 |
noted | [WTS] [JSN] | |
R4-156357 | Conducted TX power accuracy requirement | other | Ericsson | AAS_BS_LTE_UTRA-Core | Rel-13 |
R4-76 AI: 7.2.2.2 |
noted | [WTS] [JSN] | |
R4-156444 | TP for TR - Conducted power requirements and definitions |
pCR revised to R4-156814 |
Huawei | AAS_BS_LTE_UTRA-Core |
R4-76 AI: 7.2.2.2 |
revised | [WTS] [JSN] | ||
R4-156445 | Way Forward: Accuracy of broadcast power messages | other | Huawei | AAS_BS_LTE_UTRA-Core |
R4-76 AI: 7.2.2.2 |
noted | [WTS] [JSN] | ||
R4-156814 | TP for TR - Conducted power requirements and definitions |
pCR revision of R4-156444 revised to R4-156928 |
Huawei | AAS_BS_LTE_UTRA-Core |
R4-76 AI: 7.2.2.2 |
revised | [WTS] [JSN] | ||
R4-156928 | TP for TR - Conducted power requirements and definitions |
pCR revision of R4-156814 |
Huawei | AAS_BS_LTE_UTRA-Core |
R4-76 AI: 7.2.2.2 |
approved | [WTS] [JSN] |
7 documents (0.36642289161682 seconds)