Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-2400112 | Discussion on remaining open issues for MUSIM | discussion | CATT | NR_DualTxRx_MUSIM-Core |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | ||
R2-2400114 | [O100] Discussion on Timer T346n | discussion | OPPO | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2400115 | [O101] Discussion on Reporting Maximum Number of CC | discussion | OPPO | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2400116 | [O102] Discussion on Need for Gap Requirements for MUSIM Purpose | discussion | OPPO | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2400545 | Discussion on open issue for early indication | discussion | Huawei, HiSilicon | Rel-18 |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | ||
R2-2400546 | [H035] Discussion on Early Indication for Resume Request with no configuration | discussion | Huawei, HiSilicon | Rel-18 |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | ||
R2-2400593 | Discussion on open issues for temporary capability restriction | discussion | Huawei, HiSilicon | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2400594 | Discussion on open issues in NR-DC and Handover | discussion | Huawei, HiSilicon | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | |
R2-2400605 | Remaining issue of MUSIM temporary capability restriction | discussion | NEC | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | |
R2-2400618 | [RIL-S851] Capability restriction and RRC Reestablishment | discussion | Samsung |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |||
R2-2400619 | [RIL-S852] Remaining issues for Musim-NeedForGaps | discussion | Samsung |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |||
R2-2400776 | [S857] Start / Restart Wait Timer for UAI during HO and CHO | discussion | Samsung | Rel-18 |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | ||
R2-2401013 | [RIL-S853] No capability restriction in first UAI after early indication | discussion | Samsung, Huawei, HiSilicon |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |||
R2-2401015 | Considerations on Open issues for R18 MUSIM | discussion | LG Electronics | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2401017 | Remaining Issues on the Temporary Capability Reporting Procedure | discussion | ZTE Corporation, Sanechips | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2401018 | Remaining Issues on the Temporary Capability Reporting | discussion | ZTE Corporation, Sanechips | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | |
R2-2401019 | Remaining Issues on the MUSIM Gap | discussion | ZTE Corporation, Sanechips | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | |
R2-2401036 | Remaining consideration on MUSIM early indication | discussion | DENSO CORPORATION | NR_DualTxRx_MUSIM-Core |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | ||
R2-2401038 | Further discussion on Rel-17 MUSIM UAI and Rel-18 UAI Interworking | discussion | Nokia, Nokia Shanghai Bell |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | |||
R2-2401039 | Temporary capability restriction related open issues | discussion | Nokia, Nokia Shanghai Bell |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | |||
R2-2401040 | Additional capability restrictions related to measurement gaps | discussion | Nokia, Nokia Shanghai Bell |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | |||
R2-2401069 | Discussion on the remaining issue of MUSIM temporary capability restriction | discussion | vivo | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2401070 | Discussion on the remaining issue of MUSIM early indication | discussion | vivo | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | |
R2-2401071 | [C010][Z102]Discussion on musim-GapProhibitTimer | discussion | vivo | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2401180 | Discussion on Q622 and Q623 | discussion | Qualcomm Incorporated |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |||
R2-2401190 | InterNode communictaion for temporary capability restrictions [S854] [OI5][OI6] | discussion | Samsung |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | |||
R2-2401192 | Discussion on temporary capability restriction and handover [OI2] | discussion | Samsung |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | |||
R2-2401193 | Discussion on S858, Z101, C007 | discussion | Samsung Electronics Czech | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2401197 | Discussion on compliance check in RRCReconfiguration for MUSIM | discussion | Samsung Electronics Czech | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | |
R2-2401254 | Discussion on remaining open issues for MUSIM | discussion | China Telecom | NR_DualTxRx_MUSIM-Core |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | ||
R2-2401340 | Open issues on MUSIM Band restrictions | discussion | Ericsson | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
available | [WTS] [JSN] | |
R2-2401341 | Discussion on remaining MUSIM open issues | discussion | Ericsson | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2401495 | [RIL-Z102] MUSIM Gap UAI Processing | discussion | ZTE Corporation, Sanechips | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2401552 | On Issue#6 FFS on additional info on how the network set the content of MUSIM band list filter | discussion | Huawei, HiSilicon |
R2-125 AI: 7.17.2 |
noted | [WTS] [JSN] | |||
R2-2402313 | [S854] Discussion on MUSIM remaining issues | discussion | CATT | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2402451 | Further discussion on open Issue#8 about reconfiguration failure for MUSIM | discussion | Huawei, HiSilicon, vivo, DENSO CORPORATION, China Telecom, Qualcomm Incorporated, Samsung | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2402485 | Discussion on the capability restriction during RRC re-establishment | discussion | vivo | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2402968 | [H104][H105][H106][H108][H109] Discussion on MUSIM RILs |
discussion revised to R2-2403728 |
Huawei, HiSilicon | Rel-18 |
R2-125-bis AI: 7.17.2 |
revised | [WTS] [JSN] | ||
R2-2403142 | Discussion on security issue for early indication | discussion | Huawei, HiSilicon | Rel-18 |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | ||
R2-2403146 | Remaining open issues for Dual TX/TX MUSIM Operation | discussion | Nokia |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |||
R2-2403147 | Additional capability restrictions related to measurement gaps | discussion | Nokia |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |||
R2-2403150 | Corrections on need for gap for MUSIM purpose | discussion | OPPO | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
available | [WTS] [JSN] | |
R2-2403151 | Corrections on the feature for keeping MUSIM gaps when collision | discussion | OPPO | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2403262 | Dependency of Musim-NeedForGaps with Nr-NeedForGap-Reporting capability | discussion | Samsung |
R2-125-bis AI: 7.17.2 |
available | [WTS] [JSN] | |||
R2-2403324 | Open issues on MUSIM Band restrictions | discussion | Ericsson | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
postponed | [WTS] [JSN] | |
R2-2403325 | Discussion on bandEntryIndex at handover | discussion | Ericsson | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2403428 | Consideration on the UAI Processing during Handover | discussion | ZTE Corporation, Sanechips | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2403429 | Consideration on the Fallback Relationship for the Affected Band Combinations | discussion | ZTE Corporation, Sanechips | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2403430 | [RIL-Z116] Consideration on the MUSIM UAI Setting |
discussion revised to R2-2403739 |
ZTE Corporation, Sanechips | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
revised | [WTS] [JSN] | |
R2-2403522 | [L012] Wait timer issue when performing Handover | discussion | LG Electronics Inc. | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2403560 | No capability restriction in first UAI after early indication | discussion | Samsung, Huawei, HiSilicon, ZTE Corporation, Sanechips |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |||
R2-2403562 | [S860] Discussion on early indication of MUSIM temporary capability restriction in RRCReestablishmentComplete | discussion | Samsung, Intel Corporation, CATT, Xiaomi, Qualcomm, Apple, China Telecom, NEC, vivo, Huawei, HiSilicon | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2403617 | [S854][S862][S863] RILs on MUSIM | discussion | Samsung |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |||
R2-2403715 | [Z102][S863] Consideration on the musim-MaxCC Reporting | discussion | ZTE Corporation, Sanechips | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
withdrawn | [WTS] [JSN] | |
R2-2403728 | [H104][H105][H106][H108][H109] Discussion on MUSIM RILs |
discussion revision of R2-2402968 |
Huawei, HiSilicon | Rel-18 |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | ||
R2-2403739 | [Z116][Z102][S863] Consideration on the MUSIM UAI Reporting |
discussion revision of R2-2403430 |
ZTE Corporation, Sanechips | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] | |
R2-2403741 | [AT125bis][201][MUSIM] Offline discussion on the remaining RILs and other issues (vivo) | discussion | Rapporteur (vivo) | NR_DualTxRx_MUSIM-Core | Rel-18 |
R2-125-bis AI: 7.17.2 |
noted | [WTS] [JSN] |
57 documents (0.35682106018066 seconds)