Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-2014400 | Simulation results for NR PUSCH UL timing adjustment demodulation requirement | discussion | CATT | NR_HST-Perf | Rel-16 |
R4-97-e AI: 7.15.3.2.3 |
noted | [WTS] [JSN] | |
R4-2014426 | Discussion on remaining issues of PUSCH UL TA | discussion | CATT | NR_HST-Perf | Rel-16 |
R4-97-e AI: 7.15.3.2.3 |
noted | [WTS] [JSN] | |
R4-2014427 | CR for 38.141-2: Introduction of NR PUSCH UL timing adjustment performance requirement for scenario X |
CR revised to R4-2017558 |
CATT | 38.141-2 16.5.0 CR#228 catF | NR_HST-Perf | Rel-16 |
R4-97-e AI: 7.15.3.2.3 |
revised | [WTS] [JSN] |
R4-2014702 | Discussion on remaining issues for NR HST BS demodulation | discussion | CMCC | NR_HST-Perf |
R4-97-e AI: 7.15.3.2.3 |
noted | [WTS] [JSN] | ||
R4-2014823 | Views on NR PUSCH for UL timing adjustment | other | NTT DOCOMO, INC. | NR_HST-Perf | Rel-16 |
R4-97-e AI: 7.15.3.2.3 |
noted | [WTS] [JSN] | |
R4-2015093 | On NR Rel-16 HST BS demodulation UL timing adjustment requirements and simulation results | discussion | Nokia, Nokia Shanghai Bell | NR_HST-Perf | Rel-16 |
R4-97-e AI: 7.15.3.2.3 |
noted | [WTS] [JSN] | |
R4-2015119 | Discussion and simulation results for NR HST UL timing adjustment | discussion | Samsung | NR_HST-Perf | Rel-16 |
R4-97-e AI: 7.15.3.2.3 |
noted | [WTS] [JSN] | |
R4-2015121 | CR on UL timing adjustment conducted performance requirement for TS 38.141-1 |
CR revised to R4-2017559 |
Samsung | 38.141-1 16.5.0 CR#158 catB | NR_HST-Perf | Rel-16 |
R4-97-e AI: 7.15.3.2.3 |
revised | [WTS] [JSN] |
R4-2015610 | Discussion and simulation results on the UL timing adjustment | discussion | Huawei, HiSilicon | NR_HST-Perf |
R4-97-e AI: 7.15.3.2.3 |
noted | [WTS] [JSN] | ||
R4-2015847 | discussion on HST UL TA remain issues | other | Ericsson | NR_HST-Perf | Rel-16 |
R4-97-e AI: 7.15.3.2.3 |
noted | [WTS] [JSN] | |
R4-2015848 | additional simulation results for UL TA | other | Ericsson | NR_HST-Perf | Rel-16 |
R4-97-e AI: 7.15.3.2.3 |
noted | [WTS] [JSN] | |
R4-2016468 | Simulation results for NR HST UL TA | discussion | Intel Corporation | NR_HST-Perf | Rel-16 |
R4-97-e AI: 7.15.3.2.3 |
noted | [WTS] [JSN] | |
R4-2017558 | CR for 38.141-2: Introduction of NR PUSCH UL timing adjustment performance requirement for scenario X |
CR revision of R4-2014427 |
CATT | 38.141-2 16.5.0 CR#2281 catF | NR_HST-Perf | Rel-16 |
R4-97-e AI: 7.15.3.2.3 |
agreed | [WTS] [JSN] |
R4-2017559 | CR on UL timing adjustment conducted performance requirement for TS 38.141-1 |
CR revision of R4-2015121 |
Samsung | 38.141-1 16.5.0 CR#1581 catB | NR_HST-Perf | Rel-16 |
R4-97-e AI: 7.15.3.2.3 |
agreed | [WTS] [JSN] |
14 documents (0.33309102058411 seconds)