Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R4-2014570 | Discussion of RRC based BWP switching on multiple CCs | discussion | Intel Corporation | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
noted | [WTS] [JSN] | |
| R4-2014773 | Remaining issues on multiple BWP switch | discussion | MediaTek inc. | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
noted | [WTS] [JSN] | |
| R4-2014774 | CR on multiple BWP switch in R16 | CR | MediaTek inc. | 38.133 16.5.0 CR#1203 catF | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
postponed | [WTS] [JSN] |
| R4-2014837 | CR for simultaneous DCI based BWP switch delay on multiple CCs | CR | vivo | 38.133 16.5.0 CR#1206 catF | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
postponed | [WTS] [JSN] |
| R4-2015304 | Discussion on cross carrier BWP switch delay requirements for single and multiple CC | discussion | NEC | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
noted | [WTS] [JSN] | |
| R4-2015305 | CR to TS 38.133 on DCI based BWP switch requirements for cross carrier scheduling |
CR revised to R4-2017323 |
NEC | 38.133 16.5.0 CR#1252 catF | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
revised | [WTS] [JSN] |
| R4-2015505 | CR on interruption due to active BWP switching on mulitple CCs |
CR revised to R4-2017175 |
Huawei, HiSilicon | 38.133 16.5.0 CR#1284 catF | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
revised | [WTS] [JSN] |
| R4-2015506 | Discussion on requirements maintenance for BWP switch on multiple CCs | discussion | Huawei, HiSilicon | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
noted | [WTS] [JSN] | |
| R4-2016165 | Analysis of RRC based non-simultaneous multiple CC BWP | other | Ericsson | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
noted | [WTS] [JSN] | |
| R4-2016166 | Correction to RRC based non-simultaneous multiple CC BWP |
CR revised to R4-2017176 |
Ericsson | 38.133 16.5.0 CR#1367 catF | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
revised | [WTS] [JSN] |
| R4-2016427 | On Active BWP switching under cross-carrier scheduling | discussion | Ericsson | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
noted | [WTS] [JSN] | |
| R4-2016428 | CR 38.133 Active BWP switching with cross-carrier scheduling | CR | Ericsson | 38.133 16.5.0 CR#1392 catF | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
not pursued | [WTS] [JSN] |
| R4-2017175 | CR on interruption due to active BWP switching on mulitple CCs |
CR revision of R4-2015505 |
Huawei, HiSilicon | 38.133 16.5.0 CR#12841 catF | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
agreed | [WTS] [JSN] |
| R4-2017176 | Correction to RRC based non-simultaneous multiple CC BWP |
CR revision of R4-2016166 |
Ericsson | 38.133 16.5.0 CR#13671 catF | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
agreed | [WTS] [JSN] |
| R4-2017323 | CR to TS 38.133 on DCI based BWP switch requirements for cross carrier scheduling |
CR revision of R4-2015305 |
NEC | 38.133 16.5.0 CR#12521 catF | NR_RRM_enh-Core | Rel-16 |
R4-97-e AI: 7.13.1.3 |
agreed | [WTS] [JSN] |
15 documents (0.40270400047302 seconds)