Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-1814562 On Remaining issues for Beam Failure Detection discussion Intel Corporation NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

noted [WTS] [JSN]
R4-1814873 Discussion on requirements for beam failure detection discussion MediaTek inc. NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

noted [WTS] [JSN]
R4-1814874 CR for condition for non-Rx beam sweeping in BFD requirements (section 8.5.2.2 and 8.5.3.2) draftCR MediaTek inc. NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

noted [WTS] [JSN]
R4-1815174 Further discussion on BFD requirements discussion Huawei, HiSilicon R4-89

AI: 7.11.8.1.1

noted [WTS] [JSN]
R4-1815175 CR to BFD requriements (section 8.5.2, 8.5.3) draftCR

revised to R4-1816680

Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

revised [WTS] [JSN]
R4-1815176 CR to BFD scheduling restriction (section 8.5.7) draftCR Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

endorsed [WTS] [JSN]
R4-1815425 CR to Link Recovery Procedures section 8.5 draftCR

revised to R4-1816681

Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

revised [WTS] [JSN]
R4-1815426 CR to Link Recovery Procedures section 8.5.4 draftCR

revised to R4-1816682

Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

revised [WTS] [JSN]
R4-1815433 NR Beam Failure Detection Discussion discussion Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

noted [WTS] [JSN]
R4-1815742 CR to 38.133 on Link Recovery Procedures (Section 8.5) draftCR Intel Corporation NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

noted [WTS] [JSN]
R4-1816144 LS on SSB based BFD LS out

LS To: RAN1

Intel NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

approved [WTS] [JSN]
R4-1816587 CR to BFD requriements (section 8.5.2, 8.5.3) draftCR Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

endorsed [WTS] [JSN]
R4-1816588 CR to Link Recovery Procedures section 8.5 draftCR

revised to R4-1816766

Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

revised [WTS] [JSN]
R4-1816680 CR to BFD requriements (section 8.5.2, 8.5.3) draftCR

revision of R4-1815175

Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

revised [WTS] [JSN]
R4-1816681 CR to Link Recovery Procedures section 8.5 draftCR

revision of R4-1815425

Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

revised [WTS] [JSN]
R4-1816682 CR to Link Recovery Procedures section 8.5.4 draftCR

revision of R4-1815426

Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

noted [WTS] [JSN]
R4-1816766 CR to Link Recovery Procedures section 8.5 draftCR

revision of R4-1816588

Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R4-89

AI: 7.11.8.1.1

endorsed [WTS] [JSN]

17 documents (0.35360407829285 seconds)