Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-1814533 On UE timing adjustment with beam switching discussion Intel Corporation NR_newRAT-Core Rel-15 R4-89

AI: 7.11.6.1

noted [WTS] [JSN]
R4-1815535 DraftCR on maintaining UE timing requirements in TS38.133 draftCR

revised to R4-1816674

Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-89

AI: 7.11.6.1

revised [WTS] [JSN]
R4-1815536 Discussion on beam transition impacts on UE timing requirements discussion Huawei, HiSilicon R4-89

AI: 7.11.6.1

noted [WTS] [JSN]
R4-1815537 DraftCR on modifying UE timing requirements for beam transition in TS38.133 draftCR Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-89

AI: 7.11.6.1

noted [WTS] [JSN]
R4-1815929 Timing adjustment on UE beam switch discussion Qualcomm Incorporated R4-89

AI: 7.11.6.1

noted [WTS] [JSN]
R4-1816674 DraftCR on maintaining UE timing requirements in TS38.133 draftCR

revision of R4-1815535

Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-89

AI: 7.11.6.1

endorsed [WTS] [JSN]

6 documents (0.35543298721313 seconds)