Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-1812188 | On UL timing adjustment with beam switching | discussion | Intel Corporation | NR_newRAT-Core | Rel-15 |
R4-88 AI: 7.11.6.1 |
noted | [WTS] [JSN] | |
R4-1812863 | Draft CR to 38.133 on N_TA-offset requirements (section 7.1.2) |
draftCR revised to R4-1814205 |
ZTE | NR_newRAT | Rel-15 |
R4-88 AI: 7.11.6.1 |
revised | [WTS] [JSN] | |
R4-1813044 | Discussion on NTA-offfset remaining issues for NR CA | discussion | Huawei, HiSilicon | NR_newRAT-Core |
R4-88 AI: 7.11.6.1 |
noted | [WTS] [JSN] | ||
R4-1813045 | CR on TS38.133 for UE Tx timing requirements (section 7.1) | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R4-88 AI: 7.11.6.1 |
noted | [WTS] [JSN] | |
R4-1813046 | CR on TS38.133 for timing advance requirements (section 7.3) | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R4-88 AI: 7.11.6.1 |
endorsed | [WTS] [JSN] | |
R4-1813163 | CR on introducing requirement of Rx-to-Tx and Tx-to-Rx transition time (Section 7.8) | draftCR | MediaTek inc. | NR_newRAT-Core | Rel-15 |
R4-88 AI: 7.11.6.1 |
noted | [WTS] [JSN] | |
R4-1813186 | Analysis of UE transmit timing adjustment under TX and RX beam switching | other | Ericsson | NR_newRAT-Core | Rel-15 |
R4-88 AI: 7.11.6.1 |
noted | [WTS] [JSN] | |
R4-1814205 | Draft CR to 38.133 on N_TA-offset requirements (section 7.1.2) |
draftCR revision of R4-1812863 |
ZTE, NTT DOCOMO, INC., Huawei, | NR_newRAT | Rel-15 |
R4-88 AI: 7.11.6.1 |
endorsed | [WTS] [JSN] |
8 documents (0.3510320186615 seconds)