Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-1814728 | Discussion on UE behavior on the slot before or after MG | discussion | LG Electronics |
R4-89 AI: 7.11.3.1.2 |
noted | [WTS] [JSN] | |||
R4-1814731 | draft CR on UE behavior in the slot before or after MG | draftCR | LG Electronics | NR_newRAT-Core | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
noted | [WTS] [JSN] | |
R4-1814755 | draft CR on clarification of UE behavior during interrupted slots by MGL | draftCR | LG Electronics | NR_newRAT-Core | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
noted | [WTS] [JSN] | |
R4-1814894 | UE Behavior Before and After Measurement Gap | discussion | MediaTek inc. | NR_newRAT-Core | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
noted | [WTS] [JSN] | |
R4-1815022 | Draft CR to 38.133 on UE behaviour before and after measurement gap (section 9.1.2) |
draftCR revised to R4-1816677 |
ZTE | NR_newRAT | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
revised | [WTS] [JSN] | |
R4-1815023 | Draft CR to 38.133 on correction of measurement gap and interruption time (section 9.1.2) | draftCR | ZTE | NR_newRAT | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
noted | [WTS] [JSN] | |
R4-1815024 | Further discussion on UE behaviour before and after measurement gap | discussion | ZTE | NR_newRAT | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
noted | [WTS] [JSN] | |
R4-1815162 | UE UL transmission after MG (section 9.1.2) | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
noted | [WTS] [JSN] | |
R4-1815163 | Further discussion on UE behavior around MG | discussion | Huawei, HiSilicon |
R4-89 AI: 7.11.3.1.2 |
noted | [WTS] [JSN] | |||
R4-1815913 | On measurement gaps and scheduling opportunities | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
noted | [WTS] [JSN] | |
R4-1815914 | Draft CR 38.133 (9.1.2) Definition of measurement gap |
draftCR revised to R4-1816139 |
Ericsson | NR_newRAT-Core | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
revised | [WTS] [JSN] | |
R4-1815915 | On UE behaviour before and after measurement gap | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
noted | [WTS] [JSN] | |
R4-1815916 | Draft CR 38.133 (9.1.2) UE behaviour before and after measurement gap | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
noted | [WTS] [JSN] | |
R4-1816139 | Draft CR 38.133 (9.1.2) Definition of measurement gap |
draftCR revision of R4-1815914 revised to R4-1816676 |
Ericsson | NR_newRAT-Core | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
revised | [WTS] [JSN] | |
R4-1816676 | Draft CR 38.133 (9.1.2) Definition of measurement gap |
draftCR revision of R4-1816139 |
Ericsson, ZTE | NR_newRAT-Core | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
endorsed | [WTS] [JSN] | |
R4-1816677 | Draft CR to 38.133 on UE behaviour before and after measurement gap (section 9.1.2) |
draftCR revision of R4-1815022 |
ZTE | NR_newRAT | Rel-15 |
R4-89 AI: 7.11.3.1.2 |
endorsed | [WTS] [JSN] |
16 documents (0.34729194641113 seconds)