Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-1812138 On starting point to execute the measurement gap discussion Intel Corporation NR_newRAT-Core Rel-15 R4-88

AI: 7.11.3.1.1

noted [WTS] [JSN]
R4-1812139 CR on starting point to execute the measurement gap (section 9.1.2) draftCR Intel Corporation NR_newRAT-Core Rel-15 R4-88

AI: 7.11.3.1.1

noted [WTS] [JSN]
R4-1812429 Discussion on UE measurement gap starting time discussion LG Electronics R4-88

AI: 7.11.3.1.1

noted [WTS] [JSN]
R4-1812430 draft CR on MG starting time draftCR LG Electronics NR_newRAT-Core Rel-15 R4-88

AI: 7.11.3.1.1

noted [WTS] [JSN]
R4-1812706 The definition of measurement gap starting point discussion NTT DOCOMO, INC. NR_newRAT-Core Rel-15 R4-88

AI: 7.11.3.1.1

noted [WTS] [JSN]
R4-1812860 Discussion on starting point of measurement gap discussion ZTE NR_newRAT Rel-15 R4-88

AI: 7.11.3.1.1

noted [WTS] [JSN]
R4-1812985 Measurement gap starting point (section 9.1.2) draftCR

revised to R4-1814071

Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-88

AI: 7.11.3.1.1

revised [WTS] [JSN]
R4-1812986 Discussion on measurement gap starting point discussion Huawei, HiSilicon NR_newRAT-Core R4-88

AI: 7.11.3.1.1

noted [WTS] [JSN]
R4-1813160 Discussion on Gap Starting Point discussion MediaTek inc. NR_newRAT-Core Rel-15 R4-88

AI: 7.11.3.1.1

noted [WTS] [JSN]
R4-1814071 Measurement gap starting point (section 9.1.2) draftCR

revision of R4-1812985

Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-88

AI: 7.11.3.1.1

endorsed [WTS] [JSN]

10 documents (0.3532931804657 seconds)