Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R2-2309538 Leftover CP issues on Multicast reception in RRC_INACTIVE discussion ZTE, Sanechips NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2309556 Report of [Post123][606][eMBS] Session activation deactivation and state transitions discussion

revised to R2-2311257

CATT NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

revised [WTS] [JSN]
R2-2309557 Remaining CP Issues for Multicast reception in RRC_INACTIVE discussion CATT, CBN NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2309564 Discussion on Remaining Issues for eMBS CP discussion vivo NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2309801 Remaining control plane issues for multicast reception in RRC INACTIVE discussion MediaTek inc. NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2309837 Further discussion on control plane for multicast reception in RRC_INACTIVE state discussion TD Tech, Chengdu TD Tech Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2309846 MCCH change notification for multicast sessions in RRC_INACTIVE state discussion TD Tech, Chengdu TD Tech R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2309859 Remaining issues on PTM configuration and notification discussion LG Electronics Inc. NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2309860 Remaining issues on multicast servic continuity discussion LG Electronics Inc. NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2309946 Control plane aspects of multicast reception in RRC_INAVTICE discussion Lenovo Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2310015 Discussion on Service Continuity and RRC state transitions discussion Spreadtrum Communications Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2310048 Consideration on the control plane issue for multicast reception in RRC_INACTIVE discussion Xiaomi Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2310059 Discussion on control plane for multicast reception in RRC_INACTIVE discussion NEC Corporation. NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2310087 CP aspects for Multicast reception in RRC_INACTIVE discussion Samsung R&D Institute India Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2310265 Discussion on CP open issues discussion CMCC NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2310311 CP issues for multicast reception in RRC INACTIVE discussion Apple NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2310549 Coexistence of SDT and Multicast reception in RRC_INACTIVE discussion Sharp R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2310550 RRC Resume Due to Bad Reception Quality of Multicast discussion Sharp R2-123-bis

AI: 7.11.2.1

noted [WTS] [JSN]
R2-2310574 Discussion on co-existence between multicast reception in INACTIVE and SDT discussion

revision of R2-2307895

revised to R2-2312545

ITRI NR_MBS_enh-Core R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2310712 CP issues for multicast reception for RRC INACTIVE UE discussion Huawei, HiSilicon NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

noted [WTS] [JSN]
R2-2310797 Control plane details for multicast reception in RRC_INACTIVE state discussion Nokia, Nokia Shanghai Bell NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2311034 Remaining aspects of RRC state transition and notifications not concluded by [Post123][606] discussion Qualcomm Incorporated NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2311065 Consideration of RRC Resume due to bad quality and resume cause discussion Kyocera Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2311066 Other CP open issues for multicast reception in INACTIVE discussion

revised to R2-2312853

Kyocera Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2311092 Discussion on PTM configuration for eMBS discussion Shanghai Jiao Tong University R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2311236 Multicast reception in RRC_INACTIVE discussion Ericsson NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2311237 MBS multicast and UE power saving discussion Ericsson NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2311257 Report of [Post123][606][eMBS] Session activation deactivation and state transitions discussion

revision of R2-2309556

CATT NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

available [WTS] [JSN]
R2-2311403 Report of [AT123bis][605][eMBS] Session activation/deactivation and state transitions (CATT) discussion CATT NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

noted [WTS] [JSN]
R2-2311404 Report of [AT123bis][606][eMBS] MRBs handling (Huawei) discussion Huawei, HiSilicon NR_MBS_enh-Core Rel-18 R2-123-bis

AI: 7.11.2.1

noted [WTS] [JSN]

30 documents (0.30531692504883 seconds)