Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-1806304 Discussion about CSI-RS based L1-RSRP for beam detection discussion Intel Corporation NR_newRAT-Core Rel-15 R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1806322 Discussion on Beam Failure Detection for Beam Management discussion Intel Corporation NR_newRAT-Core Rel-15 R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1806391 Scheduling availability during L1 measurement discussion NTT DOCOMO, INC. NR_newRAT Rel-15 R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1806392 Requirements for beam failure detection based on SSB and CSI-RS discussion NTT DOCOMO, INC. NR_newRAT Rel-15 R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1806394 Scheduling availability during RLM discussion NTT DOCOMO, INC. NR_newRAT Rel-15 R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1806395 Scheduling availability during CSI-RS based L3 measurement discussion NTT DOCOMO, INC. NR_newRAT Rel-15 R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1806457 Discussion on requirements for beam management discussion MediaTek (Wuhan) Inc. NR_newRAT-Core Rel-15 R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1806642 Further discussion on BFR requirements discussion Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1806767 Discussion on beam management other Ericsson NR_newRAT-Core Rel-15 R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1807280 Discussion on link reconfiguration procedures requirements for beam management discussion Huawei, HiSilicon R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1807281 CR on TS38.133 for link reconfiguration procedure requirements draftCR

revised to R4-1808443

Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-87

AI: 7.10.4.4

revised [WTS] [JSN]
R4-1807282 Discussion on Beam Measurement and Reporting for Beam Management discussion Huawei, HiSilicon R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1807283 WF on Beam management requirements in NR other

revised to R4-1808444

Huawei, HiSilicon R4-87

AI: 7.10.4.4

revised [WTS] [JSN]
R4-1807551 CSI-RS and SSB beam management discussion Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1807975 Summary on offline discussion on remaining issues regarding scheduling availability other

revised to R4-1808445

NTT DOCOMO R4-87

AI: 7.10.4.4

revised [WTS] [JSN]
R4-1808443 CR on TS38.133 for link reconfiguration procedure requirements draftCR

revision of R4-1807281

Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1808444 WF on Beam management requirements in NR other

revision of R4-1807283

Huawei, HiSilicon R4-87

AI: 7.10.4.4

approved [WTS] [JSN]
R4-1808445 Summary on offline discussion on remaining issues regarding scheduling availability other

revision of R4-1807975

NTT DOCOMO R4-87

AI: 7.10.4.4

noted [WTS] [JSN]
R4-1808523 CR on scheduling availablility during RLM draftCR NTT DOCOMO NR_newRAT-Core Rel-15 R4-87

AI: 7.10.4.4

endorsed [WTS] [JSN]
R4-1808524 CR on scheduling availablility during beam failure detection draftCR NTT DOCOMO NR_newRAT-Core Rel-15 R4-87

AI: 7.10.4.4

endorsed [WTS] [JSN]

20 documents (0.34535813331604 seconds)