Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-156244 | Scheduling request based on prescheduling transmission | discussion | III | FS_LTE_LATRED |
R2-92 AI: 7.10.1.1 |
available | [WTS] [JSN] | ||
R2-156256 | Feedback for SPS PDCCH command | discussion | CATT | FS_LTE_LATRED |
R2-92 AI: 7.10.1.1 |
available | [WTS] [JSN] | ||
R2-156296 | Further analysis on uplink transmission skipping | discussion | Huawei, HiSilicon | FS_LTE_LATRED | Rel-13 |
R2-92 AI: 7.10.1.1 |
available | [WTS] [JSN] | |
R2-156298 | Introduction of CB-PUSCH transmission | CR | Huawei, HiSilicon | 36.331 12.7.0 CR#1938 catB | FS_LTE_LATRED | Rel-13 |
R2-92 AI: 7.10.1.1 |
available | [WTS] [JSN] |
R2-156299 | Summary of email discussion: [91bis#34][LTE/LATRED] CB-PUSCH |
report revised to R2-156923 |
Huawei | FS_LTE_LATRED | Rel-13 |
R2-92 AI: 7.10.1.1 |
revised | [WTS] [JSN] | |
R2-156300 | Text Proposal capturing outcome of email discussion: [91bis#34][LTE/LATRED] CB-PUSCH | pCR | Huawei | FS_LTE_LATRED | Rel-13 |
R2-92 AI: 7.10.1.1 |
revised | [WTS] [JSN] | |
R2-156322 | Discussion on the SPS activation or release command | discussion | ZTE Corporation | FS_LTE_LATRED |
R2-92 AI: 7.10.1.1 |
available | [WTS] [JSN] | ||
R2-156402 | Performance evaluation of CB-PUSCH | discussion | Nokia Networks | FS_LTE_LATRED | Rel-13 |
R2-92 AI: 7.10.1.1 |
available | [WTS] [JSN] | |
R2-156644 | Uplink Latency Reduction through Contention-Based PUSCH Transmissions | other | Motorola Mobility UK Ltd. | Rel-13 |
R2-92 AI: 7.10.1.1 |
available | [WTS] [JSN] | ||
R2-156653 | Impact of latency reduction techniques in TDD systems | discussion | Ericsson | Rel-13 |
R2-92 AI: 7.10.1.1 |
available | [WTS] [JSN] | ||
R2-156658 | Email discussion report for [91bis#33][LTE/LATRED] – L2 enhancements | report | Ericsson | Rel-13 |
R2-92 AI: 7.10.1.1 |
noted | [WTS] [JSN] | ||
R2-156695 | Fast UL evaluation for Mission Critical / Real Time applications | discussion | Sequans Communications | Rel-14 |
R2-92 AI: 7.10.1.1 |
noted | [WTS] [JSN] | ||
R2-156696 | Further considerations on sharing of semi-persistent uplink resources | discussion | ETRI | FS_LTE_LATRED | Rel-13 |
R2-92 AI: 7.10.1.1 |
available | [WTS] [JSN] | |
R2-156756 | Need for feedback of SPS activation-release | discussion | LG Electronics Inc. | FS_LTE_LATRED |
R2-92 AI: 7.10.1.1 |
available | [WTS] [JSN] | ||
R2-156759 | Remaining issues for SkipULTx | discussion | LG Electronics Inc. | FS_LTE_LATRED |
R2-92 AI: 7.10.1.1 |
available | [WTS] [JSN] | ||
R2-156820 | Text proposal as result of Email discussion [91bis#33][LTE/LATRED] – L2 enhancements |
pCR revised to R2-156924 |
Ericsson | 36.881 0.4.0 | Rel-13 |
R2-92 AI: 7.10.1.1 |
revised | [WTS] [JSN] | |
R2-156921 | Text Proposal for Handover Latency Reduction Solutions | pCR | Intel Corporation | FS_LTE_LATRED | Rel-13 |
R2-92 AI: 7.10.1.1 |
agreed | [WTS] [JSN] | |
R2-156922 | Updated conclusion on CB-PUSCH |
report revised to R2-156925 |
Huawei, CATT, Nokia Networks, Intel | FS_LTE_LATRED | Rel-13 |
R2-92 AI: 7.10.1.1 |
revised | [WTS] [JSN] | |
R2-156923 | Text Proposal capturing outcome of email discussion: [91bis#34][LTE/LATRED] CB-PUSCH |
pCR revision of R2-156299 revised to R2-156926 |
Huawei | FS_LTE_LATRED | Rel-13 |
R2-92 AI: 7.10.1.1 |
revised | [WTS] [JSN] | |
R2-156924 | Text proposal as result of Email discussion [91bis#33][LTE/LATRED] – L2 enhancements |
pCR revision of R2-156820 |
Ericsson | 36.881 0.4.0 | FS_LTE_LATRED | Rel-14 |
R2-92 AI: 7.10.1.1 |
agreed | [WTS] [JSN] |
R2-156925 | Text Proposal capturing outcome of email discussion: [91bis#34][LTE/LATRED] CB-PUSCH |
pCR revision of R2-156922 |
Huawei, | FS_LTE_LATRED | Rel-13 |
R2-92 AI: 7.10.1.1 |
agreed | [WTS] [JSN] | |
R2-156926 | Updated conclusion on CB-PUSCH |
pCR revision of R2-156923 |
Huawei, CATT, Nokia Networks, Intel | FS_LTE_LATRED | Rel-13 |
R2-92 AI: 7.10.1.1 |
agreed | [WTS] [JSN] | |
R2-156928 | TP on conclusions for Handover latency reduction |
pCR revised to R2-157117 |
Intel Corporation | FS_LTE_LATRED | Rel-13 |
R2-92 AI: 7.10.1.1 |
revised | [WTS] [JSN] | |
R2-157117 | TP on conclusions for Handover latency reduction |
pCR revision of R2-156928 |
Intel Corporation | FS_LTE_LATRED | Rel-13 |
R2-92 AI: 7.10.1.1 |
agreed | [WTS] [JSN] |
24 documents (0.35354399681091 seconds)