Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R1-1608659 Discussion on UL CWS adjustment for eLAA other Huawei, HiSilicon R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1608978 Periodic CSI reporting for eLAA other Samsung R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1608979 Draft CR on Periodic CSI report draftCR Samsung LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

available [WTS] [JSN]
R1-1608980 Draft CR on start timing of PUSCH draftCR

revised to R1-1610475

Samsung LTE_eLAA-Core Rel-13 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1608981 PHR reporting for two-step scheduling other Samsung R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1608982 CCA slot and tx-rx/rx-tx switching time other Samsung R1-86

AI: 7.1.7

available [WTS] [JSN]
R1-1609172 Discussion on (E)PDCCH candidate configuration discussion LG Electronics Rel-14 R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1609173 Discussion on periodic CSI transmission discussion LG Electronics Rel-14 R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1609174 Correction on UL grant reception in ending partial subframe draftCR

revised to R1-1610456

LG Electronics LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1609175 Correction on UL burst scheduling draftCR

revised to R1-1610775

LG Electronics LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1609366 Draft CR on UL CWS adjustment for eLAA in 36.213 draftCR

revised to R1-1610996

Huawei, HiSilicon LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1609367 Draft CR on PHICH operation for eLAA in 36.213 draftCR

revised to R1-1610458

Huawei, HiSilicon LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1609569 [Draft 36.212 CR] Corrections to RV in eLAA DCI definitions draftCR

revised to R1-1610459

Nokia, Alcatel-Lucent Shanghai Bell LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1609576 Draft CR on DCI formats related with LAA in TS 36.212 draftCR

revised to R1-1610463

ETRI LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1609577 Draft CR on timing offset field in TS 36.213 draftCR ETRI LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1609777 Draft CR on eLAA UL Multicarrier channel access draftCR BROADCOM LIMITED LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

postponed [WTS] [JSN]
R1-1609944 Discussion on UL resource allocation for 10MHz eLAA discussion Qualcomm Incorporated R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1609945 Draft 212 CR on UL resource allocation for 10MHz eLAA draftCR Qualcomm Incorporated LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

postponed [WTS] [JSN]
R1-1609946 Draft 213 CR on UL resource allocation for 10MHz eLAA draftCR Qualcomm Incorporated LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

postponed [WTS] [JSN]
R1-1609947 Discussion on trigger monitoring timeline for two stage triggered grants in eLAA discussion Qualcomm Incorporated R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1609948 Draft CR on trigger monitoring timeline for triggered grants in eLAA draftCR

revised to R1-1611021

Qualcomm Incorporated LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1609949 Dicussion on simultanoeus transmission on the non-LAA and LAA Scells discussion Qualcomm Incorporated R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1609950 Draft CR on SRS dropping rules for eLAA draftCR Qualcomm Incorporated LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

postponed [WTS] [JSN]
R1-1609951 Discussion on RI transmission on PUSCH for LAA Scells discussion Qualcomm Incorporated R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1609952 Draft CR for RI transmission on PUSCH for LAA Scells draftCR

revised to R1-1610998

Qualcomm Incorporated LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1609953 Frame structure and maximum timing advance for eLAA discussion Qualcomm Incorporated R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1609954 On UE assumptions for UL LBT and start of UL transmission discussion Qualcomm Incorporated R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1610198 Correction on PUSCH RE mapping in case of multiple subframe scheduling draftCR WILUS Inc. LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1610199 Correction on handling UL LBT procedure under UE power limited case draftCR

revised to R1-1610460

WILUS Inc. LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1610200 Clarification on channel access priority class according to UL LBT type indication in eLLA DCI draftCR WILUS Inc. LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1610201 Discussion on UL Multi-carrier Transmission for eLAA other WILUS Inc. R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1610202 Discussion on Handling UL Multicarrier Transmission under UE power limited case other WILUS Inc. R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1610209 On simultaneous transmission of periodic and aperiodic CSI in eLAA discussion Qualcomm Incorporated R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1610210 Draft CR on simultaneous transmission of periodic and aperiodic CSI in eLAA draftCR Qualcomm Incorporated LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

available [WTS] [JSN]
R1-1610421 Removal of LAA DRS channel access from UL Type 2 Channel Access description draftCR

revised to R1-1610884

Nokia, Alcatel-Lucent Shanghai Bell LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1610456 Correction on UL grant reception in ending partial subframe CR

revision of R1-1609174

LG Electronics 36.213 14.0.0 CR#759 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1610457 Correction on UL burst scheduling CR LG Electronics 36.213 14.0.0 CR#760 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1610458 CR on PHICH operation for eLAA in 36.213 CR

revision of R1-1609367

Huawei, HiSilicon 36.213 14.0.0 CR#761 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1610459 Corrections to RV in eLAA DCI definitions CR

revision of R1-1609569

Nokia, Alcatel-Lucent Shanghai Bell 36.212 14.0.0 CR#221 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1610460 Correction on handling UL LBT procedure under UE power limited case CR

revision of R1-1610199

WILUS Inc. 36.213 14.0.0 CR#762 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1610463 Draft CR on DCI formats related with LAA in TS 36.212 draftCR

revision of R1-1609576

revised to R1-1610476

ETRI LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1610464 Draft CR on UL duration and offset field in TS 36.213 draftCR

revised to R1-1610896

ETRI LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1610475 CR on start timing of PUSCH CR

revision of R1-1608980

Samsung 36.211 13.3.0 CR#297 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1610476 CR on DCI formats related with LAA in TS 36.212 CR

revision of R1-1610463

ETRI 36.212 14.0.0 CR#222 catD LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1610653 Correction on channel access priority class according to UL LBT type indication in eLAA draftCR

revised to R1-1610900

WILUS Inc. LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1610774 Correction on periodic CSI transmission draftCR

revised to R1-1610908

LG Electronics Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1610775 Correction on UL burst scheduling draftCR

revision of R1-1609175

LG Electronics LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1610853 Correction on PDCCH candidate configuration draftCR

revised to R1-1611072

LG Electronics LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

noted [WTS] [JSN]
R1-1610858 Draft CR on using 25us LBT for UEs on carriers without eNB Cat 4 LBT foe eLAA draftCR Qualcomm LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

postponed [WTS] [JSN]
R1-1610859 Draft CR on clarification of PUSCH start position for eLAA draftCR

revised to R1-1610886

Panasonic, Qualcomm Incorporated LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1610884 Removal of LAA DRS channel access from UL Type 2 Channel Access description CR

revision of R1-1610421

Nokia, Alcatel-Lucent Shanghai Bell 36.213 14.0.0 CR#773 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1610886 Clarification of PUSCH start position for eLAA CR

revision of R1-1610859

Panasonic, Qualcomm Incorporated 36.212 14.0.0 CR#223 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1610896 CR on UL duration and offset field in TS 36.213 CR

revision of R1-1610464

ETRI 36.213 14.0.0 CR#774 catD LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1610900 Correction on channel access priority class according to UL LBT type indication in eLAA CR

revision of R1-1610653

WILUS Inc. 36.213 14.0.0 CR#775 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1610908 Correction on periodic CSI transmission CR

revision of R1-1610774

revised to R1-1611007

LG Electronics 36.213 14.0.0 CR#776 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1610996 Draft CR on UL CWS adjustment for eLAA in 36.213 draftCR

revision of R1-1609366

revised to R1-1611022

Huawei, HiSilicon, Qualcomm, Broadcom, LGE, Ericsson, Intel LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1610998 CR for RI transmission on PUSCH for LAA Scells CR

revision of R1-1609952

Qualcomm 36.212 14.0.0 CR#224 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1611007 Correction on periodic CSI transmission CR

revision of R1-1610908

LG Electronics 36.213 14.0.0 CR#7761 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1611021 Draft CR on trigger monitoring timeline for triggered grants in eLAA draftCR

revision of R1-1609948

revised to R1-1611025

Qualcomm Incorporated LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

revised [WTS] [JSN]
R1-1611022 CR on UL CWS adjustment for eLAA in 36.213 CR

revision of R1-1610996

Huawei, HiSilicon, Qualcomm, Broadcom, LGE, Ericsson, Intel 36.213 14.0.0 CR#778 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1611025 CR on trigger monitoring timeline for triggered grants in eLAA CR

revision of R1-1611021

revised to R1-1613509

Qualcomm Incorporated 36.213 14.0.0 CR#779 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]
R1-1611031 Response LS to IEEE 802.11 regarding LAA LS out

LS is reply to R1-167908

LS To: IEEE 802 LAN/MAN Standards Committee

revision of R1-1609934

RAN1, Qualcomm LTE_LAA-Core Rel-13 R1-86

AI: 7.1.7

approved [WTS] [JSN]
R1-1611072 Correction on PDCCH candidate configuration CR

revision of R1-1610853

LG Electronics 36.213 14.0.0 CR#784 catF LTE_eLAA-Core Rel-14 R1-86

AI: 7.1.7

agreed [WTS] [JSN]

63 documents (0.36962103843689 seconds)