Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
GP-150725 | EC-GSM: Discussion on the need to start the specification work as soon as possible | other | ORANGE, TeliaSonera AB |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150742 | EC-GSM - Impacts to Legacy Base Stations | other | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150757 | pCR 45.820, MAR periodic and network command system capacity evaluation (revision of GPC15062, revised in GP-150898) |
pCR revised to GP-150898 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150758 | EC-GSM, Software upgrade system evaluation | other | Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150759 | pCR 45.820, EC-GSM, Software upgrade system evaluation (revised in GP-150899) |
pCR revised to GP-150899 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150760 | EC-GSM, Random access system capacity evaluation (update of GPC150491) | other | Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150761 | pCR 45.820, EC-GSM, Random access system capacity evaluation (update of GPC150632) | pCR | Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
agreed | [WTS] [JSN] | |||
GP-150763 | pCR 45.820, EC-GSM, Miscellaneous corrections and clarifications (revised in GP-150897) |
pCR revised to GP-150897 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150765 | pCR 45.820, EC-GSM – Simulation Results for Coexistence with UTRA and EUTRA (revised in GP-150900) |
pCR revised to GP-150900 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150766 | EC-GSM, Conclusion to the TR (updated in GP-150918) |
other revised to GP-150918 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150767 | pCR 45.820, EC-GSM, Conclusion to the TR (revised in GP-150919) |
pCR revised to GP-150919 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150800 | On SCH coverage extension in GSM legacy systems | other | Friedrich-Alex-Universität |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150832 | UL System Level Simulation Results of GERAN CIoT Solutions: EC-GSM | other | Intel |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150833 | DL System Level Simulation Results of GERAN CIoT Solutions: EC-GSM | other | Intel |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150834 | pCR TR 45.820 – EC-GSM, Downlink and Uplink System Level Simulation Results (revised in GP-150931) |
pCR revised to GP-150931 |
Intel |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150835 | GERAN CIoT Link-to-System Mapping Methodology | other | Intel |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150881 | Response to GP-150742 on impact to GSM/EDGE BTS hardware from EC-GSM | other | Ericsson LM, Nokia Networks, Alcatel Lucent |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150897 | pCR 45.820, EC-GSM, Miscellaneous corrections and clarifications (revision of GP-150763, revised in GP-150970) |
pCR revision of GP-150763 revised to GP-150970 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150898 | pCR 45.820, MAR periodic and network command system capacity evaluation (revision of GP-150757) |
pCR revision of GP-150757 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
agreed | [WTS] [JSN] | |||
GP-150899 | pCR 45.820, EC-GSM, Software upgrade system evaluation (revision of GP-150759) |
pCR revision of GP-150759 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
agreed | [WTS] [JSN] | |||
GP-150931 | pCR TR 45.820 – EC-GSM, Downlink and Uplink System Level Simulation Results (revision of GP-150834, revised in GP-150992) |
pCR revision of GP-150834 revised to GP-150992 |
Intel |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150970 | pCR 45.820, EC-GSM, Miscellaneous corrections and clarifications (revision of GP-150897) |
pCR revision of GP-150897 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
agreed | [WTS] [JSN] |
22 documents (0.36077213287354 seconds)