Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R1-1910419 Correction on PUSCH scheduling with CSS for Case 1 HARQ timing draftCR

revised to R1-1911473

Huawei, HiSilicon NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

revised [WTS] [JSN]
R1-1910420 Correction on PRACH transmission for intra-band EN-DC draftCR

revised to R1-1911474

Huawei, HiSilicon NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

revised [WTS] [JSN]
R1-1910421 Correction on power control for NE-DC draftCR

revised to R1-1911495

Huawei, HiSilicon NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

revised [WTS] [JSN]
R1-1910436 Correction to uplink power control in NE-DC draftCR NEC NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

not pursued [WTS] [JSN]
R1-1910437 Correction to uplink power control in E-UTRA cells in EN-DC/NE-DC draftCR NEC NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

not pursued [WTS] [JSN]
R1-1911045 Draft CR on clarification on bit number of UL/SUL indicator in DCI format 0_1 draftCR MediaTek Inc. NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

noted [WTS] [JSN]
R1-1911473 Correction on PUSCH scheduling with CSS for Case 1 HARQ timing draftCR

revision of R1-1910419

revised to R1-1911502

Huawei, HiSilicon NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

revised [WTS] [JSN]
R1-1911474 Correction on PRACH transmission for intra-band EN-DC draftCR

revision of R1-1910420

Huawei, HiSilicon NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

withdrawn [WTS] [JSN]
R1-1911495 Correction on power control for NE-DC draftCR

revision of R1-1910421

revised to R1-1911604

Huawei, HiSilicon NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

revised [WTS] [JSN]
R1-1911498 Draft CR on UL/SUL indicator in DCI format 0_1 draftCR

revised to R1-1911611

MediaTek NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

revised [WTS] [JSN]
R1-1911502 Correction on PUSCH scheduling with CSS for Case 1 HARQ timing draftCR

revision of R1-1911473

Huawei, HiSilicon NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

not pursued [WTS] [JSN]
R1-1911514 Chairman's notes of AI 7.1.4 Maintenance for NR-LTE co-existence other Ad-Hoc Chair (Ericsson) NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

endorsed [WTS] [JSN]
R1-1911537 Draft CR on PUSCH configuration for UL/SUL carrier draftCR MediaTek NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

not pursued [WTS] [JSN]
R1-1911604 Correction on power control for NE-DC CR

revision of R1-1911495

Huawei, HiSilicon 38.213 15.7.0 CR#66 catF NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

agreed [WTS] [JSN]
R1-1911611 CR on UL/SUL indicator in DCI format 0_1 CR

revision of R1-1911498

MediaTek 38.212 15.7.0 CR#21 catF NR_newRAT-Core Rel-15 R1-98

AI: 7.1.4

agreed [WTS] [JSN]

15 documents (0.39177703857422 seconds)