Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-163994 | Discussions on control signaling for NR | other | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-163995 | Discussions on reference signal design for NR | other | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-163996 | Discussion on the base subcarrier spacing for NR | other | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-163997 | Cell search for NR: design consideration | other | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-163998 | Proposed set of numerologies for NR | other | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-163999 | Discussion on different scaling methods for NR subcarrier spacing | other | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164000 | Unified framework for NR physical layer | other | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164001 | Framework for multiplexing verticals in NR | other | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164002 | Design aspects of URLLC for NR | other | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164003 | Dynamic TDD for NR | other | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164004 | Discussion on TTI, subframe and signaling timing for NR | other | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164005 | Support of wireless relay for NR | other | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164006 | Design aspects of mMTC for NR | other | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164030 | Evaluation of scalable numerology proposals | other | Huawei, HiSilicon |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164031 | Analysis and comparison on numerology candidates | other | Huawei, HiSilicon |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-164032 | Discussion on frame structure for NR | other | Huawei, HiSilicon |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164179 | Subcarrier spacing and scaling for new RAT | discussion | Intel Corporation | Rel-14 |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | ||
R1-164180 | Low Latency Frame Structure Design for NR | discussion | Intel Corporation | Rel-14 |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | ||
R1-164181 | NR Operation in Unlicensed Spectrum | discussion | Intel Corporation | Rel-14 |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | ||
R1-164248 | NR frame structure design | discussion | CATT | Rel-14 |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | ||
R1-164249 | Discussion of NR numerology | discussion | CATT | Rel-14 |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | ||
R1-164261 | Forward compatibility of numerology and frame structure design | discussion | ZTE |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164271 | Overview of numerology candidates | discussion | ZTE |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-164272 | Performance evaluation of numerology candidates | discussion | ZTE |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164273 | Frequency multiplexing of different numerologies | discussion | ZTE |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164274 | Frame structure for NR | discussion | ZTE |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164275 | NR frame structure for unlicensed spectrum | discussion | ZTE |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164276 | Discussions on HARQ operation for NR | discussion | ZTE |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164330 | NR sub-carrier spacing | other | Fujitsu |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164331 | TDD frame structure with mixed numerology | other | Fujitsu |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164332 | NR Frame structure considerations for low latency TDD operation | other | Fujitsu |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164333 | Discussion on flexible/dynamic TDD | other | Fujitsu |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164347 | Numerology for 5G NR | discussion | Fiberhome Technologies Group |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164380 | Frame Structure Design Considerations for Bands above 6 GHz | other | Huawei, HiSilicon |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164381 | Impact of directional transmission on NR numerology for high frequency bands | other | Huawei, HiSilicon |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164472 | Frame structure supporting flexible parameter allocations | discussion | Guangdong OPPO Mobile Telecom. | Rel-14 |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | ||
R1-164482 | Considerations on the design of frame structure for NR | discussion | NEC |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164486 | Subcarrier spacing and other parameters for numerology | discussion | NEC |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164559 | Initial Evaluation Result for NR Numerology |
discussion revised to R1-165431 |
LG Electronics |
R1-85 AI: 7.1.4 |
revised | [WTS] [JSN] | |||
R1-164560 | Discussion on frame structure for NR | discussion | LG Electronics |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164561 | Support different numerology and different usage scenarios | discussion | LG Electronics |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164562 | Consideration of Flexible and Full duplex operation in NR design | discussion | LG Electronics |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164590 | Discussion on numerology sets | discussion | Spreadtrum Communications | Rel-14 |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | ||
R1-164591 | Discussion on frame structure | discussion | Spreadtrum Communications | Rel-14 |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | ||
R1-164621 | On a 30kHz subcarrier spacing option for NR | discussion | Ericsson |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164622 | NR numerology | discussion | Ericsson |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-164623 | Mixed Numerology in an OFDM System |
discussion revised to R1-165833 |
Ericsson |
R1-85 AI: 7.1.4 |
revised | [WTS] [JSN] | |||
R1-164627 | Hybrid-ARQ acknowledgements for NR | discussion | Ericsson |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164628 | Frame structure for NR | discussion | Ericsson |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164630 | Performance difference between 60 and 75 kHz subcarrier spacing | discussion | Ericsson |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164631 | Duplex schemes for NR | discussion | Ericsson |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164652 | Frame structure design for new radio interface | discussion | Lenovo (Beijing) Ltd |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164657 | Discussion on frame structure design for NR | other | Sony |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164658 | Discussion on numerology design for NR | other | Sony |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164665 | Frame structure for New Radio | other | INTERDIGITAL COMMUNICATIONS | FS_NR_newRAT | Rel-14 |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |
R1-164666 | Numerology for New Radio | other | INTERDIGITAL COMMUNICATIONS | FS_NR_newRAT | Rel-14 |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |
R1-164690 | NB-IOT Coexistence Analysis for NR Numerology | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164691 | NR numerology design and evaluation for long delay spread channels | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164692 | Numerology and TTI multiplexing for NR Forward Compatibility Analysis | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-164693 | NR sampling rate related numerology considerations for eMBB and mMTC | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164694 | Frame structure requirements | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164695 | Candidate frame structures | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164696 | Summary of email discussion on frame structure |
discussion revised to R1-165456 |
Qualcomm Incorporated |
R1-85 AI: 7.1.4 |
revised | [WTS] [JSN] | |||
R1-164723 | Numerology and Frame Structure for NR-Unlicensed | other | Huawei, HiSilicon |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164870 | Discussion on numerology for NR | discussion | ETRI |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164871 | Frame structure for new radio interface | discussion | ETRI |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164890 | Discussion on the frame structure design for new radio | other | CMCC |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164915 | Transient period on NR uplink frame structure design | discussion | Panasonic Corporation |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-164973 | NR frame structure considering coexistence with TDD LTE | discussion | SoftBank Corp. | FS_NR_newRAT | Rel-14 |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |
R1-164976 | Discussion on NR numerology |
discussion revised to R1-165525 |
KT Corp. |
R1-85 AI: 7.1.4 |
revised | [WTS] [JSN] | |||
R1-164985 | Discussion on the multiplexing of different numerologies | discussion | Panasonic |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165024 | Flexible numerology for 5G | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165025 | Comparison of different numerology scaling principles | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165026 | Comparison of different subcarrier spacings | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165027 | Basic frame structure principles for 5G | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165028 | URLLC U-plane latency analysis | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165029 | Main components for forward compatible frame structure design in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165030 | On the unlicensed band operation in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165031 | On the wireless relay operation in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165055 | Discussion on Frame Structure for NR | discussion | Cohere Technologies |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165083 | Consideration on URLLC in NR frame structure | discussion | ZTE |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165107 | Numerology and Frame Structure for NR | other | Motorola Mobility |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165112 | NR Numerology Design Principles | discussion | Qualcomm Incorporated | Rel-14 |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | ||
R1-165162 | On Numerology for New Radio Access Technology | discussion | MediaTek Inc. |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165163 | Flexible Frame Structure for New Radio Access Technology | discussion | MediaTek Inc. |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165176 | Discussion on frame structure for NR | discussion | NTT DOCOMO, INC. |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165177 | Views on numerology for NR |
discussion revised to R1-165439 |
NTT DOCOMO, INC. |
R1-85 AI: 7.1.4 |
revised | [WTS] [JSN] | |||
R1-165178 | Views on domodulation RS design for NR access technology | discussion | NTT DOCOMO, INC. |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165217 | Consideration on frame structure for NR | other | Beijing Xiaomi Mobile Software |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165242 | On Frame Structure for NR | other | Innovative Technology Lab Co. |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165285 | Bidirectional frame structure for imparity CCFD scheme | other | III |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165291 | Discussions on the numerology and frame structure design for NR | other | CATR |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165311 | Considerations on frame structure for NR | discussion | KT Corp. |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165316 | Scalable numerology for New RAT | other | Sharp |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165371 | Discussion of Numerology for NR | discussion | Convida Wireless LLC |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165431 | Initial Evaluation Result for NR Numerology |
discussion revision of R1-164559 |
LG Electronics |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165436 | Discussions on reference signal design for NR | discussion | Samsung |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165439 | Views on numerology for NR |
discussion revision of R1-165177 |
NTT DOCOMO, INC. |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165456 | Summary of email discussion on frame structure |
discussion revision of R1-164696 |
Qualcomm Incorporated |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165517 | WF on scaling of subcarrier spacing in NR | discussion | Samsung, Intel, KT Corp., Verizon Wireless, Fiberhome |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165525 | Discussion on NR numerology |
discussion revision of R1-164976 |
KT Corp., Verizon Wireless |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165560 | WF on subframe definition for NR | discussion | Samsung |
R1-85 AI: 7.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-165575 | Way Forward On Frame Structure | discussion | Qualcomm, Ericsson, Panasonic, NTT Docomo, ZTE, Convida, Nokia, ASB, Sony, Intel |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165582 | Summary of offline email discussions on numerology | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-165583 | WF on Scalable Numerology Symbol Boundary Alignment |
discussion revised to R1-165821 |
Qualcomm, ZTE, ETRI, NEC, OPPO , Panasonic, DoCoMo, Deutsch Telecom, Convida Wireless |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165660 | WF on Scalable NCP | discussion | Qualcomm Incorporated, ZTE |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165661 | WF on Scalable Numerology TTI Boundary Alignment | discussion | Qualcomm |
R1-85 AI: 7.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-165662 | WF on NR frame structure | discussion | Samsung, Mediatek, Intel, NTT DOCOMO, CMCC, Panasonic, Sony, ITRI, Interdigital, LG Electronics |
R1-85 AI: 7.1.4 |
agreed | [WTS] [JSN] | |||
R1-165669 | Way Forward On Frame Structure | discussion | Qualcomm, OPPO, MediaTek, Intel, CATT, DOCOMO, InterDigital, Samsung, Sony, ZTE, Ericsson, Panasonic, ITRI, ETRI |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165685 | WF on phase noise modeling | discussion | Nokia, Alcatel-Lucent Shanghai Bell, NTT DoCoMo, Samsung, Qualcomm, Ericsson, Intel, InterDigital |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165700 | Way Forward on frame structure timing relations | discussion | Ericsson, Qualcomm, ZTE, NTT DOCOMO |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165719 | Discussion on frequency-domain initiated numerology and time-domain initiated numerology | discussion | CMCC |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165731 | WF on numerology | discussion | LG Electronics, NTT DOCOMO, Sprints, LGU+ |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165734 | WF on subcarrier spacing in NR | discussion | Verizon Wireless, KT Corp., Reliance-jio, CHTTL, Samsung, Intel, Potevio, Fiberhome, IITH, CEWiT, Tejas Neworks |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165739 | NR Frame Structure Timing Relations | discussion | Ericsson |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165807 | WF on timing relations for NR Frame structure |
discussion revised to R1-165871 |
CMCC, CATT, OPPO, MediaTek, Lenovo |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165811 | WF on Frame Structure and Control Interference | discussion | Qualcomm |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165818 | WF on frame structure for NR |
discussion revised to R1-165896 |
LG Electronics, CATT, ETRI, Lenovo |
R1-85 AI: 7.1.4 |
revised | [WTS] [JSN] | |||
R1-165821 | WF on Scalable Numerology Symbol Boundary Alignment |
discussion revision of R1-165583 revised to R1-165886 |
Panasonic, InterDigital, Ericsson, Fujitsu, NTT DOCOMO |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165833 | Mixed Numerology in an OFDM System |
discussion revision of R1-164623 |
Ericsson |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165840 | WF on NR frame structure with asynchronous UL HARQ | discussion | ZTE, Qualcomm, Ericsson, DOCOMO, ETRI |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165841 | WF on NR CP type | discussion | Huawei, HiSilicon, Intel, LGE, CATT, IITH, CEWiT, Reliance-jio, Tejas Networks, Samsung, NEC, Sony, Fujitsu, Vodafone |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165842 | Proposals for evaluation of CP requirements in NR | discussion | CMCC |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165858 | WF on subcarrier spacing in NR | discussion | Samsung |
R1-85 AI: 7.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-165871 | WF on timing relations for NR Frame structure |
discussion revision of R1-165807 |
CMCC, CATT, OPPO, MediaTek, Lenovo, Huawei, HiSilicon |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165872 | WF on minimum HARQ Timing |
discussion revised to R1-165887 |
LG Electronics, Panasonic |
R1-85 AI: 7.1.4 |
revised | [WTS] [JSN] | |||
R1-165877 | WF on wireless relay/backhaul for NR |
discussion revised to R1-165902 |
Samsung, AT&T Ericsson |
R1-85 AI: 7.1.4 |
revised | [WTS] [JSN] | |||
R1-165878 | WF on further step on numerology study | discussion | Huawei, CMCC, National Instruments, Ericsson, Orange, Vodafone, Panasonic |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165885 | WF on carrier spacing in NR |
discussion revised to R1-165891 |
Verizon Wireless, KT Corp., Reliance-jio, CHTTL, China Telecom, Samsung, Intel, Potevio, Fiberhome, IITH, CEWiT, Tejas Neworks, ETRI, Straight Path |
R1-85 AI: 7.1.4 |
revised | [WTS] [JSN] | |||
R1-165886 | WF on Scalable Numerology Symbol Boundary Alignment |
discussion revision of R1-165821 |
Panasonic, InterDigital, Ericsson, Fujitsu, NTT DOCOMO |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165887 | WF on minimum HARQ Timing |
discussion revision of R1-165872 |
LG Electronics, Panasonic, Qualcomm, NTT DOCOMO |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165891 | WF on carrier spacing in NR |
discussion revision of R1-165885 |
Verizon Wireless, KT Corp., Reliance-jio, CHTTL, China Telecom, Samsung, Intel, Potevio, Fiberhome, IITH, CEWiT, Tejas Neworks, Straight Path, ITL, WILLUS |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165896 | WF on frame structure for NR |
discussion revision of R1-165818 revised to R1-165925 |
LG Electronics, CATT, ETRI, Lenovo |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165902 | WF on wireless backhaul for NR |
discussion revision of R1-165877 |
Samsung, AT&T, Ericsson, Intel, IITH, CEWiT, Tejas Networks, Reliance-jio, Straight Path |
R1-85 AI: 7.1.4 |
agreed | [WTS] [JSN] | |||
R1-165925 | WF on frame structure for NR |
discussion revision of R1-165896 |
LG Electronics, CATT |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] | |||
R1-165931 | WF on time interval for NR | discussion | LGE, CATT |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-165955 | WF on time interval X |
discussion revised to R1-166013 |
Huawei, HiSilicon, Qualcomm, Nokia, ASB |
R1-85 AI: 7.1.4 |
revised | [WTS] [JSN] | |||
R1-165990 | WF Frame Structure and Evaluation |
discussion revised to R1-166027 |
Qualcomm, Huawei, HiSilicon, NTT DOCOMO, Ericsson |
R1-85 AI: 7.1.4 |
revised | [WTS] [JSN] | |||
R1-166012 | Way Forward on Ack/Nack feedback of DL HARQ for NR |
discussion revised to R1-166032 |
ZTE, ZTE Microelectronics, Ericsson, Qualcomm, NTT DOCOMO |
R1-85 AI: 7.1.4 |
revised | [WTS] [JSN] | |||
R1-166013 | WF on time interval X |
discussion revision of R1-165955 |
Huawei, HiSilicon, Qualcomm, Nokia, ASB |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-166027 | WF Frame Structure and Evaluation |
discussion revision of R1-165990 |
Qualcomm, Panasonic, NTT DOCOMO, KT Corp, MediaTek, Intel |
R1-85 AI: 7.1.4 |
noted | [WTS] [JSN] | |||
R1-166032 | Way Forward on Ack/Nack feedback of DL HARQ for NR |
discussion revision of R1-166012 |
ZTE, ZTE Microelectronics, Ericsson, Qualcomm, NTT DOCOMO |
R1-85 AI: 7.1.4 |
available | [WTS] [JSN] |
142 documents (0.3636589050293 seconds)