Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R1-1611247 Discussion on MIMO calibration other

revised to R1-1613100

Huawei, HiSilicon R1-87

AI: 7.1.3.4

revised [WTS] [JSN]
R1-1611423 Summary of [86b-19] email discussion on Phase 2 MIMO calibration for NR other

revised to R1-1613104

ZTE, ZTE Microelectronics R1-87

AI: 7.1.3.4

revised [WTS] [JSN]
R1-1611424 Results of Phase 1 calibration for NR MIMO other ZTE, ZTE Microelectronics R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1611425 Further clarification on assumptions for Phase 1 NR-MIMO calibration other ZTE, ZTE Microelectronics R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1611477 Phase 1 system level calibration results discussion

revised to R1-1613502

Spreadtrum Communications Rel-14 R1-87

AI: 7.1.3.4

revised [WTS] [JSN]
R1-1611677 Further discussion of UL power control for NR other Huawei, HiSilicon R1-87

AI: 7.1.3.4

noted [WTS] [JSN]
R1-1611827 Phase I SLS calibration results for NR MIMO discussion LG Electronics R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1611828 Phase II SLS calibration results for NR MIMO discussion LG Electronics R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1611829 Phase I LLS calibration results for NR MIMO discussion LG Electronics R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1611830 Phase II LLS calibration results for NR MIMO discussion LG Electronics R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1611831 Discussion on UL power control for NR discussion LG Electronics R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1611988 On uplink power control for NR discussion Intel Corporation R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612060 Phase 1 calibration results for sub6GHz and Phase 2 calibration assumptions discussion Qualcomm Incorporated R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612061 Phase 1 calibration results for above 6GHz and Phase 2 calibration assumptions discussion Qualcomm Incorporated R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612129 Phase 1 LLS Calibration Results for NR MIMO discussion MediaTek Inc. R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612259 NR MIMO system level calibration results discussion Beijing Xinwei Telecom Techn. R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612260 NR MIMO link level calibration results discussion Beijing Xinwei Telecom Techn. R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612356 On power control in NR and MU-MIMO other Ericsson R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612518 UL Power Control Aspects other Samsung R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612519 MIMO LLS calibration results for NR on 4GHz frequency band other Samsung R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612520 MIMO LLS phase 1 calibration results for NR on 30GHz frequency band other

revised to R1-1613383

Samsung R1-87

AI: 7.1.3.4

revised [WTS] [JSN]
R1-1612521 MIMO LLS phase 2 calibration results for NR on 30GHz frequency band other Samsung R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612522 MIMO SLS phase 1 calibration results for NR on 30GHz frequency band other

revised to R1-1613384

Samsung R1-87

AI: 7.1.3.4

revised [WTS] [JSN]
R1-1612523 MIMO SLS phase 2 calibration results for NR on 30GHz frequency band other Samsung R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612643 Link level calibration for NR MIMO discussion InterDigital Communications R1-87

AI: 7.1.3.4

withdrawn [WTS] [JSN]
R1-1612711 Views on UL transmit power control for NR discussion NTT DOCOMO, INC. R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612734 MIMO calibration results discussion NTT DOCOMO, INC. R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612750 Phase I calibration results of NR MIMO discussion CATT Rel-14 R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612874 On-demand power boost and cell muting for URLLC in the 5G New Radio discussion Nokia, Alcatel-Lucent Shanghai Bell R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612875 Latency assumptions for network-based coordination studies discussion Nokia, Alcatel-Lucent Shanghai Bell R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612876 Power control for MIMO discussion Nokia, Alcatel-Lucent Shanghai Bell R1-87

AI: 7.1.3.4

noted [WTS] [JSN]
R1-1612888 UL power control in multi-beam based approaches discussion ASUSTEK COMPUTER (SHANGHAI) R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1612900 Phase 1 NR MIMO calibration results discussion

revised to R1-1613115

Ericsson LM R1-87

AI: 7.1.3.4

revised [WTS] [JSN]
R1-1613100 Discussion on MIMO calibration other

revision of R1-1611247

Huawei, HiSilicon R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1613104 Summary of [86b-19] email discussion on Phase 1 and Phase 2 MIMO calibration for NR discussion

revision of R1-1611423

ZTE, ZTE Microelectronics R1-87

AI: 7.1.3.4

noted [WTS] [JSN]
R1-1613115 Phase 1 NR MIMO calibration results discussion

revision of R1-1612900

Ericsson LM R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1613383 MIMO LLS phase 1 calibration results for NR on 30GHz frequency band other

revision of R1-1612520

Samsung R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1613384 MIMO SLS phase 1 calibration results for NR on 30GHz frequency band other

revision of R1-1612522

Samsung R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1613502 Phase 1 system level calibration results discussion

revision of R1-1611477

Spreadtrum Communications R1-87

AI: 7.1.3.4

available [WTS] [JSN]
R1-1613718 Way forward on Phase 1 and Phase 2 MIMO calibration for NR ZTE discussion

revised to R1-1613741

ZTE R1-87

AI: 7.1.3.4

revised [WTS] [JSN]
R1-1613724 WF on UL TPC discussion NTT DOCOMO, CATT, Huawei, HiSilicon, Samsung R1-87

AI: 7.1.3.4

noted [WTS] [JSN]
R1-1613741 WF on phase 1 and phase 2 MIMO calibration discussion

revision of R1-1613718

ZTE R1-87

AI: 7.1.3.4

noted [WTS] [JSN]
R1-1613744 NR-MIMO phase 1 calibration results discussion ZTE, ZTE Microelectronics R1-87

AI: 7.1.3.4

noted [WTS] [JSN]

43 documents (0.35920190811157 seconds)