Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-1611247 | Discussion on MIMO calibration |
other revised to R1-1613100 |
Huawei, HiSilicon |
R1-87 AI: 7.1.3.4 |
revised | [WTS] [JSN] | |||
R1-1611423 | Summary of [86b-19] email discussion on Phase 2 MIMO calibration for NR |
other revised to R1-1613104 |
ZTE, ZTE Microelectronics |
R1-87 AI: 7.1.3.4 |
revised | [WTS] [JSN] | |||
R1-1611424 | Results of Phase 1 calibration for NR MIMO | other | ZTE, ZTE Microelectronics |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1611425 | Further clarification on assumptions for Phase 1 NR-MIMO calibration | other | ZTE, ZTE Microelectronics |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1611477 | Phase 1 system level calibration results |
discussion revised to R1-1613502 |
Spreadtrum Communications | Rel-14 |
R1-87 AI: 7.1.3.4 |
revised | [WTS] [JSN] | ||
R1-1611677 | Further discussion of UL power control for NR | other | Huawei, HiSilicon |
R1-87 AI: 7.1.3.4 |
noted | [WTS] [JSN] | |||
R1-1611827 | Phase I SLS calibration results for NR MIMO | discussion | LG Electronics |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1611828 | Phase II SLS calibration results for NR MIMO | discussion | LG Electronics |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1611829 | Phase I LLS calibration results for NR MIMO | discussion | LG Electronics |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1611830 | Phase II LLS calibration results for NR MIMO | discussion | LG Electronics |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1611831 | Discussion on UL power control for NR | discussion | LG Electronics |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1611988 | On uplink power control for NR | discussion | Intel Corporation |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612060 | Phase 1 calibration results for sub6GHz and Phase 2 calibration assumptions | discussion | Qualcomm Incorporated |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612061 | Phase 1 calibration results for above 6GHz and Phase 2 calibration assumptions | discussion | Qualcomm Incorporated |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612129 | Phase 1 LLS Calibration Results for NR MIMO | discussion | MediaTek Inc. |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612259 | NR MIMO system level calibration results | discussion | Beijing Xinwei Telecom Techn. |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612260 | NR MIMO link level calibration results | discussion | Beijing Xinwei Telecom Techn. |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612356 | On power control in NR and MU-MIMO | other | Ericsson |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612518 | UL Power Control Aspects | other | Samsung |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612519 | MIMO LLS calibration results for NR on 4GHz frequency band | other | Samsung |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612520 | MIMO LLS phase 1 calibration results for NR on 30GHz frequency band |
other revised to R1-1613383 |
Samsung |
R1-87 AI: 7.1.3.4 |
revised | [WTS] [JSN] | |||
R1-1612521 | MIMO LLS phase 2 calibration results for NR on 30GHz frequency band | other | Samsung |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612522 | MIMO SLS phase 1 calibration results for NR on 30GHz frequency band |
other revised to R1-1613384 |
Samsung |
R1-87 AI: 7.1.3.4 |
revised | [WTS] [JSN] | |||
R1-1612523 | MIMO SLS phase 2 calibration results for NR on 30GHz frequency band | other | Samsung |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612643 | Link level calibration for NR MIMO | discussion | InterDigital Communications |
R1-87 AI: 7.1.3.4 |
withdrawn | [WTS] [JSN] | |||
R1-1612711 | Views on UL transmit power control for NR | discussion | NTT DOCOMO, INC. |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612734 | MIMO calibration results | discussion | NTT DOCOMO, INC. |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612750 | Phase I calibration results of NR MIMO | discussion | CATT | Rel-14 |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | ||
R1-1612874 | On-demand power boost and cell muting for URLLC in the 5G New Radio | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612875 | Latency assumptions for network-based coordination studies | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612876 | Power control for MIMO | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-87 AI: 7.1.3.4 |
noted | [WTS] [JSN] | |||
R1-1612888 | UL power control in multi-beam based approaches | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1612900 | Phase 1 NR MIMO calibration results |
discussion revised to R1-1613115 |
Ericsson LM |
R1-87 AI: 7.1.3.4 |
revised | [WTS] [JSN] | |||
R1-1613100 | Discussion on MIMO calibration |
other revision of R1-1611247 |
Huawei, HiSilicon |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1613104 | Summary of [86b-19] email discussion on Phase 1 and Phase 2 MIMO calibration for NR |
discussion revision of R1-1611423 |
ZTE, ZTE Microelectronics |
R1-87 AI: 7.1.3.4 |
noted | [WTS] [JSN] | |||
R1-1613115 | Phase 1 NR MIMO calibration results |
discussion revision of R1-1612900 |
Ericsson LM |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1613383 | MIMO LLS phase 1 calibration results for NR on 30GHz frequency band |
other revision of R1-1612520 |
Samsung |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1613384 | MIMO SLS phase 1 calibration results for NR on 30GHz frequency band |
other revision of R1-1612522 |
Samsung |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1613502 | Phase 1 system level calibration results |
discussion revision of R1-1611477 |
Spreadtrum Communications |
R1-87 AI: 7.1.3.4 |
available | [WTS] [JSN] | |||
R1-1613718 | Way forward on Phase 1 and Phase 2 MIMO calibration for NR ZTE |
discussion revised to R1-1613741 |
ZTE |
R1-87 AI: 7.1.3.4 |
revised | [WTS] [JSN] | |||
R1-1613724 | WF on UL TPC | discussion | NTT DOCOMO, CATT, Huawei, HiSilicon, Samsung |
R1-87 AI: 7.1.3.4 |
noted | [WTS] [JSN] | |||
R1-1613741 | WF on phase 1 and phase 2 MIMO calibration |
discussion revision of R1-1613718 |
ZTE |
R1-87 AI: 7.1.3.4 |
noted | [WTS] [JSN] | |||
R1-1613744 | NR-MIMO phase 1 calibration results | discussion | ZTE, ZTE Microelectronics |
R1-87 AI: 7.1.3.4 |
noted | [WTS] [JSN] |
43 documents (0.35920190811157 seconds)