Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-1706915 | Consideration on subsequent transmission/retransmission after pre-emption | other | Huawei, HiSilicon |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1706918 | Discussion on UL multiplexing of grant-based eMBB and grant-free URLLC | other | Huawei, HiSilicon |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1707176 | Multiplexing data with different transmisison durations | discussion | ZTE |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1707193 | Uplink multiplexing for different transmission durations | discussion | ZTE Corporation |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1707242 | Discussion on DL multiplexing of eMBB and URLLC | discussion | vivo |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1707243 | Discussion on UL multiplexing of eMBB and URLLC | discussion | vivo |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1707261 | Discussion onĀ Preemption Indicator Design | other | Fujitsu |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1707414 | Indication of preemption of DL transmissions | discussion | Intel Corporation | Rel-15 |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | ||
R1-1707415 | Multiplexing of UL transmissions with different data durations and latency requirements | discussion | Intel Corporation | Rel-15 |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | ||
R1-1707516 | Multiplexing of different DL data transmission durations | discussion | CATT |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1707664 | Discussion on pre-emption indication design | discussion | LG Electronics | Rel-15 |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | ||
R1-1707665 | Discussion on eMBB and URLLC multiplexing for uplink | discussion | LG Electronics | Rel-15 |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | ||
R1-1707726 | On symbol-level time-domain resource allocation | discussion | Guangdong OPPO Mobile Telecom. |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1707733 | Further details on NR mini-slot based design | discussion | AT&T |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1707771 | On eMBB/URLLC multiplexing for uplink transmission | discussion | Lenovo, Motorola Mobility |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1707788 | Discussion on pre-emption indication method for DL multiplexing of URLLC and eMBB | discussion | Spreadtrum Communications | Rel-15 |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | ||
R1-1707789 | DL eMBB and URLLC multiplexing under mixed numerology | discussion | Spreadtrum Communications | Rel-15 |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | ||
R1-1708036 | Indication of Preempted Resources | other | Samsung |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708037 | Considerations on signaling design for indicating Preemted Resources | other | Samsung |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708038 | Indication of Preempted Resources Prior to HARQ-ACK Feedback | other | Samsung |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708039 | Evaluation Results of Preemption Indication | other | Samsung |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708124 | On pre-emption indication for DL multiplexing of URLLC and eMBB | other | Huawei, HiSilicon |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708125 | Discussion on UL multiplexing of grant-based eMBB and URLLC | other | Huawei, HiSilicon |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708251 | Further considerations on using pre-emption indicator for DL URLLC/eMBB multiplexing | discussion | Sony |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708257 | On eMBB/URLLC multiplexing for Uplink | discussion | Sony |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708266 | Preemption Indication Details for eMBB URLLC Multiplexing | discussion | TCL Communication Ltd. |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708279 | eMBB and URLLC multiplexing for NR | discussion | Apple Inc. |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708355 | Multiplexing of low-latency traffic and non-latency sensitive traffic in UL | discussion | InterDigital, Inc. |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708485 | Multiplexing of different data durations for downlink | discussion | NTT DOCOMO, INC. |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708486 | Multiplexing of different data durations for uplink | discussion | NTT DOCOMO, INC. |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708531 | On scheduling of mini-slots within slots | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708532 | Open issues for preemptive scheduling | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708533 | Pause-Resume Scheduling for Low Latency Uplink Transmissions | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708634 | UL URLLC capacity study and URLLC/eMBB dynamic multiplexing design principle | discussion | Qualcomm Incorporated | Rel-15 |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | ||
R1-1708635 | Indication design for UL URLLC and eMBB multiplexing | discussion | Qualcomm Incorporated | Rel-15 |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | ||
R1-1708636 | URLLC DL control and indication channel | discussion | Qualcomm Incorporated | Rel-15 |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | ||
R1-1708637 | DL indication channel design principle for URLLC/eMBB dynamic multiplexing | discussion | Qualcomm Incorporated | Rel-15 |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | ||
R1-1708745 | Pre-emption indication and Sub-sequent transmission | discussion | Shenzhen Coolpad Technologies |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708954 | On multiplexing of URLLC and eMBB in DL | discussion | Sequans Communications |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708979 | Impact on eMBB DMRS puncturing by URLLC burst | discussion | WILUS Inc. |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1708980 | Pre-emption indication on DL multiplexing between eMBB and URLLC | discussion | WILUS Inc. |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1709005 | Considerations on multiplexing with different transmission durations | other | KDDI Corporation |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1709059 | Discussion on DL Preemption Indication | discussion | Convida Wireless |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1709110 | Performance Evaluation of DL Puncturing | discussion | Ericsson |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1709111 | On Pre-empted Transmissions for Downlink | discussion | Ericsson |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1709112 | On Inter-UE UL Puncturing | discussion | Ericsson |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1709113 | On Intra-UE UL Puncturing | discussion | Ericsson |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] | |||
R1-1709144 | Considerations on pre-emption indication for DL transmission | discussion | KT Corp. |
R1-89 AI: 7.1.3.3.6 |
available | [WTS] [JSN] |
48 documents (0.35840487480164 seconds)