Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R1-2000249 Draft 38.213 CR on UL skipping draftCR vivo NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

withdrawn [WTS] [JSN]
R1-2000303 Draft 38.214 CR on UL skipping draftCR vivo NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000415 Correction on PDCCH Blind Detection for NR-DC draftCR ZTE NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000486 Correction on multiplexing HARQ-ACK/SR/CSI in a PUCCH determined based on PRI CR OPPO 38.213 15.8.0 CR#83 catF NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000487 Correction on multiplexing HARQ-ACK/SR/CSI in a multi-CSI-PUCCH CR OPPO 38.213 15.8.0 CR#84 catF NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000516 Clarification for processing order of UL multiplexing and cancellation discussion CATT R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000517 Correction on the definition for timeline condition draftCR CATT NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000518 Correction for PUCCH repetition transmission draftCR CATT NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000553 Draft 38.211 CR Intra-slot frequency hopping with 1-symbol PUCCH draftCR Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

not pursued [WTS] [JSN]
R1-2000555 Draft 38.212 CR Correction to dynamic frequency domain resource allocation type selection draftCR

revised to R1-2002616

Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000556 Draft 38.214 CR Corrections to PDSCH PRB bundling draftCR

revised to R1-2002617

Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000558 Draft 38.214 CR Correction to TBS determination when 3824 draftCR

revised to R1-2002618

Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000579 Clarification on UE behaviour with no transmission of UL-SCH discussion Fujitsu Limited Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000718 Clarification on UE features on BWP operations discussion Intel Corporation Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000808 Clarification for N_info draftCR Ericsson NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

withdrawn [WTS] [JSN]
R1-2000869 Correction on rate matching output sequence length draftCR

revised to R1-2002379

Sharp NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000870 Correction on removal of padding bits in DCI size alignment procedure draftCR

revised to R1-2002380

Sharp NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000952 Draft CR on clarifying A-CSI multiplexing on PUSCH with slot aggregation draftCR Qualcomm Incorporated NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2000994 UL grant overridden between configured grant and RAR grant discussion

revision of R1-1912862

revised to R1-2002462

ASUSTeK NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2001032 Clarification on UCI multiplexing on PUSCH discussion Huawei, HiSilicon NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2001100 Correction on PDCCH candidate colliding with RB-symbol level RMR in TS38.213 draftCR Huawei, HiSilicon NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2001101 Correction on rate-matching for PDSCH/PDSCH with SPS in TS38.214 draftCR Huawei, HiSilicon NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]
R1-2001115 Correction on PUSCH with a Type 1 configured grant draftCR Huawei, HiSilicon NR_newRAT-Core Rel-15 R1-ah-37786

AI: 7.1.3

postponed [WTS] [JSN]

23 documents (0.3564088344574 seconds)