Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-1905986 | TP for 38.213 alignment CR | draftCR | NEC | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1906123 | Draft TS 38.213 CR on UCI reporting in PUSCH | draftCR | vivo | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1906295 | Correction on Timing for secondary cell activation/deactivation | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1906296 | Discussion on Timing for secondary cell activation/deactivation | discussion | CATT |
R1-97 AI: 7.1.3 |
not treated | [WTS] [JSN] | |||
R1-1906297 | Correction on timeline check for uplink physical channel overlapping |
draftCR revised to R1-1907807 |
CATT | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1906298 | Correction on timeline definition for uplink physical channel overlapping | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1906299 | Correction on HARQ-ACK transmission on PUSCH with dynamic codebook | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1906300 | Correction on PDSCH resource mapping with RE level granularity | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1906301 | Correction on PDSCH processing capability 2 with scheduling limitation of SCS 30kHz | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1906302 | Correction on PUSCH selection for overlapping of PUCCH and PUSCH | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1906303 | Correction on default HARQ-ACK transmission for RRC connection re-establishment | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1906382 | Correction on HARQ-ACK codebook | draftCR | Spreadtrum Communications | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1906406 | Draft CR on PUCCH transmission drop due to BWP switching | draftCR | ZTE | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1906407 | Draft CR on bwp-InactivityTimer configuration for Scell | draftCR | ZTE | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1906408 | Draft CR on PDCCH-ConfigCommon and PDCCH-Config configuration for Scell |
draftCR revised to R1-1907727 |
ZTE | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1906531 | DraftCR for TS38.212 on default value for max MIMO layers (Rel15, NR_newRAT-Core) | draftCR | MediaTek Inc. | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1906532 | Remaining issues on DCI size ambiguity of fallback DCI formats | discussion | MediaTek Inc. |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |||
R1-1906533 | DraftCR for TS38.213 on PUCCH/PUSCH multiplexing considering cancellation of grant-free PUSCH (Rel15, NR_newRAT-Core) | draftCR | MediaTek Inc. | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1906642 | Draft CR on rate matching for PDSCH | draftCR | ZTE | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1906901 | Draft CR on FDRA for DCI format 1_0 | draftCR | Samsung | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
withdrawn | [WTS] [JSN] | |
R1-1907045 | Clarification on aggregationFactor with CG retransmission |
draftCR revised to R1-1907871 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907046 | Clarification regarding non-full-duplex UE communication |
draftCR revised to R1-1907872 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907057 | Correction to the CBGI field size in the DCI format 1_1 | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1907058 | Correction of the parameter name for SRS in DCI 0_1 | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907059 | Correction to the DCI field interpretation in cross-carrier scheduling | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907060 | Correction to the CBG determination in HARQ-ACK codebook determination | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907061 | Correction to the DCI size determination in cross-carrier scheduling | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1907062 | Correction to UE behaviour on out-of-order HARQ-ACK | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907111 | Clarification on PDSCH resource mapping around scheduling PDCCH | discussion | Ericsson | NR_newRAT-Core |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | ||
R1-1907113 | Clarification on PDSCH resource mapping | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1907208 | Corrections on mapping from virtual to physical resource blocks for PUSCH scheduled by RAR UL grant and Msg3 retransmission |
draftCR revised to R1-1907748 |
Sharp | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907320 | Draft CR to 38.213 on Clarification of ACK or NACK for TB-based HARQ-ACK codebook | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907321 | Draft CR to 38.213 on deactivation timing for ScellDeactivationTimer and a typo fix for group TPC | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907349 | Correction to DL SPS on the number of codewords supported | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1907441 | Multiplexing of overlapping PUCCH and PUSCH with different numerologies | discussion | Nokia, Nokia Shanghai Bell |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |||
R1-1907489 | Discussion on conditions of rate matching pattern overlapping with PDSCH DMRS symbols | discussion | Huawei, HiSilicon |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |||
R1-1907490 | Discussion on PDCCH monitoring for NR-DC | discussion | Huawei, HiSilicon |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |||
R1-1907497 | Correction on DCI size alignment for SUL |
draftCR revised to R1-1907718 |
Huawei, HiSilicon | NR_newRAT | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1907499 | Correction on OFDM baseband signal generation | draftCR | Huawei, HiSilicon | NR_newRAT | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1907500 | Correction on initial BWP in TS38.211 | draftCR | Huawei, HiSilicon | NR_newRAT | Rel-15 |
R1-97 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1907501 | Correction on initial BWP in TS38.213 | draftCR | Huawei, HiSilicon | NR_newRAT | Rel-15 |
R1-97 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1907502 | Correction on simultaneous PRACH and other UL transmissions | draftCR | Huawei, HiSilicon | NR_newRAT | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1907503 | Correction on DL SPS with fallback DCI | draftCR | Huawei, HiSilicon | NR_newRAT | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1907504 | Correction on slot aggregation with fallback DCI | draftCR | Huawei, HiSilicon | NR_newRAT | Rel-15 |
R1-97 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1907505 | Correction on DataRate and DataRateCC | draftCR | Huawei, HiSilicon | NR_newRAT | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1907658 | Summary of draft CRs on resource allocation | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907659 | Summary of draft CRs on DCI content | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907661 | Summary for Rel-15 UL configured grant transmission | discussion | NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907664 | Summary of Draft CRs on CA and HARQ-ACK Codebook for Rel-15 NR | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907685 | Correction on TC-RNTI in 38.214 with DCI format 0-1 |
draftCR revised to R1-1907741 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907696 | Summary of Rel.15 maintenance for PDCCH and search space |
discussion revised to R1-1907749 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907701 | Summary of Bandwidth Part Related Draft CRs | discussion | MediaTek | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907702 | Summary on CRs related to rate-matching in NR | discussion | Nokia | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907715 | Summary of CRs on UCI multiplexing on PUSCH |
discussion revised to R1-1907753 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907716 | Correction on default CORESET for types 0a, 1, and 2 CSS | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1907717 | Summary for Rel-15 CRs on DL/UL data scheduling and HARQ procedure |
discussion revised to R1-1907751 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907718 | Correction on DCI size alignment for SUL |
draftCR revision of R1-1907497 |
Huawei, HiSilicon | NR_newRAT | Rel-15 |
R1-97 AI: 7.1.3 |
withdrawn | [WTS] [JSN] | |
R1-1907727 | Draft CR on PDCCH-ConfigCommon and PDCCH-Config configuration for Scell |
draftCR revision of R1-1906408 |
ZTE | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1907736 | Clarification and aligning of terminologies on MSG3 (re)transmission and RAR UL grant in 38.211 | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1907737 | Clarification and aligning of terminologies on MSG3 (re)transmission and RAR UL grant in 38.213 |
draftCR revised to R1-1907898 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907738 | Clarification and aligning of terminologies on MSG3 (re)transmission and RAR UL grant in 38.214 |
draftCR revised to R1-1907899 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907741 | Correction on TC-RNTI in 38.214 with DCI format 0-1 |
draftCR revision of R1-1907685 revised to R1-1907780 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907743 | Outcome of offline discussion on DCI format | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907744 | Outcome of offline discussion on resource allocation | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907746 | Discussion on necessity of frame boundary alignment of NR CA |
discussion revision of R1-1906529 |
CMCC |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |||
R1-1907748 | Corrections on mapping from virtual to physical resource blocks for PUSCH scheduled by RAR UL grant and Msg3 retransmission |
draftCR revision of R1-1907208 revised to R1-1907928 |
Sharp | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907749 | Summary#2 of Rel.15 maintenance for PDCCH and search space |
discussion revision of R1-1907696 revised to R1-1907921 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907751 | Summary#2 for Rel-15 CRs on DL/UL data scheduling and HARQ procedure |
discussion revision of R1-1907717 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907753 | Summary#2 of CRs on UCI multiplexing on PUSCH |
discussion revision of R1-1907715 revised to R1-1907794 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907779 | Outcome of offline discussion on resource allocation and DCI | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907780 | Correction on TC-RNTI in 38.214 with DCI format 0-1 |
draftCR revision of R1-1907741 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1907792 | Offline discussion for Rel-15 DL SPS and UL CG | discussion | NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907794 | Summary#3 of CRs on UCI multiplexing on PUSCH |
discussion revision of R1-1907753 revised to R1-1907853 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907807 | Correction on timeline check for uplink physical channel overlapping |
draftCR revision of R1-1906297 |
CATT | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1907832 | Offline Summary on CA-related Draft CRs for Rel-15 NR | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907853 | Summary#4 of CRs on UCI multiplexing on PUSCH |
discussion revision of R1-1907794 revised to R1-1907944 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907871 | Clarification on aggregationFactor with CG retransmission |
draftCR revision of R1-1907045 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1907872 | Clarification regarding non-full-duplex UE communication |
draftCR revision of R1-1907046 revised to R1-1907927 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907897 | Outcome of offline discussion on non-full-duplex Ues | discussion | Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907898 | Clarification and aligning of terminologies on MSG3 (re)transmission and RAR UL grant in 38.213 |
draftCR revision of R1-1907737 revised to R1-1907959 |
Ericsson, Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907899 | Clarification and aligning of terminologies on MSG3 (re)transmission and RAR UL grant in 38.214 |
draftCR revision of R1-1907738 revised to R1-1907960 |
Ericsson, Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907910 | Offline Summary#2 on CA-related Draft CRs for Rel-15 NR | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907921 | Summary#3 of Rel.15 maintenance for PDCCH and search space |
discussion revision of R1-1907749 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907922 | On PDCCH blind detection for NR-DC: Comparison between Alt 1 and Alt 2 |
discussion revised to R1-1907943 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907927 | Clarification regarding non-full-duplex UE communication |
CR revision of R1-1907872 |
Ericsson | 38.211 15.5.0 CR#15 catF | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1907928 | Corrections on PUSCH scheduled by RAR UL grant and Msg3 PUSCH retransmission |
draftCR revision of R1-1907748 revised to R1-1907942 |
Sharp | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907929 | Draft CR to 38.213 on deactivation timing for ScellDeactivationTimer |
draftCR revised to R1-1907951 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907942 | Corrections on PUSCH scheduled by RAR UL grant and Msg3 PUSCH retransmission |
draftCR revision of R1-1907928 revised to R1-1907958 |
Sharp, Ericsson, Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907943 | On PDCCH blind detection for NR-DC: Comparison between Alt 1 and Alt 2 |
discussion revision of R1-1907922 revised to R1-1907945 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1907944 | Summary#5 of CRs on UCI multiplexing on PUSCH |
discussion revision of R1-1907853 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1907945 | On PDCCH blind detection for NR-DC: Comparison between Alt 1 and Alt 2 |
discussion revision of R1-1907943 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
not treated | [WTS] [JSN] | |
R1-1907946 | Comments to “On PDCCH blind detection for NR-DC: Comparison between Alt 1 and Alt 2” | discussion | Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
not treated | [WTS] [JSN] | |
R1-1907951 | CR to 38.213 on deactivation timing for ScellDeactivationTimer |
CR revision of R1-1907929 |
Ericsson | 38.213 15.5.0 CR#46 catF | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1907956 | LS on PDCCH monitoring for NR-DC |
LS out LS To: RAN2 |
RAN1, Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
approved | [WTS] [JSN] | |
R1-1907957 | CR on PDCCH Monitoring for NR-DC | CR | Samsung, Nokia, Nokia Shanghai Bell, Qualcomm | 38.213 15.5.0 CR#48 catF | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1907958 | Corrections on PUSCH scheduled by RAR UL grant and Msg3 PUSCH retransmission |
CR revision of R1-1907942 |
Sharp, Ericsson, Qualcomm | 38.211 15.5.0 CR#16 catF | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1907959 | Clarification and aligning of terminologies on MSG3 (re)transmission and RAR UL grant in 38.213 |
draftCR revision of R1-1907898 |
Ericsson, Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1907960 | Clarification and aligning of terminologies on MSG3 (re)transmission and RAR UL grant in 38.214 |
draftCR revision of R1-1907899 |
Ericsson, Qualcomm | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1907962 | Corrections to 38.214 regarding the MAC CE activation/deactivation timing in mixed numerology scenario | CR | Nokia | 38.214 15.5.0 CR#34 catF | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1907963 | CR on Timing for MAC CE Applicability | CR | Samsung | 38.213 15.5.0 CR#49 catF | NR_newRAT-Core | Rel-15 |
R1-97 AI: 7.1.3 |
agreed | [WTS] [JSN] |
100 documents (0.35750389099121 seconds)