Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-1904058 | Draft TS 38.213 CR on corrections for SFI | draftCR | vivo | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1904277 | [Draft] CR on maximum modulation order configured for serving cell |
draftCR revised to R1-1905687 |
Intel Corporation | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1904278 | [Draft] CR on inclusion of TC-RNTI for monitored RNTI for UL-SCH |
draftCR revised to R1-1905758 |
Intel Corporation | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1904279 | Correction to simultaneous reception of DL Channels |
draftCR revised to R1-1905795 |
Intel Corporation | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1904359 | TP for alignment CR to 38.213 | draftCR | NEC Corporation | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1904371 | [Draft] CR on Timing for secondary cell activation / deactivation | draftCR | Intel Corporation | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1904388 | PDCCH Monitoring for NR-DC | discussion | Samsung |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |||
R1-1904389 | Draft CR on PDCCH Monitoring for NR-DC | draftCR | Samsung, Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1904390 | Draft CR on missing case for DCI format 1_1 with CS-RNTI |
draftCR revised to R1-1905750 |
Samsung | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1904391 | Draft CR on misalignment issue for PDSCH/PUSCH dropping rule | draftCR | Samsung | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1904467 | Draft CR on the determination of TBS of a PUSCH scheduled by a DCI format 0_0 with CRC scrambled by TC-RNTI | draftCR | MediaTek Inc. | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1904468 | Clarification on PDCCH candidate monitoring | discussion | MediaTek Inc. |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |||
R1-1904469 | Draft CR on rate matching for PDSCH scheduled by DCI format 1_0 |
draftCR revised to R1-1905752 |
MediaTek Inc., Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1904470 | Draft CR on collision handling of PUCCH, PUSCH, and SRS | draftCR | MediaTek Inc. | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1904471 | Draft CR on the determination of the minimum number of PRBs for PUCCH transmission | draftCR | MediaTek Inc. | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1904537 | Correction on reference CRC for multi-CSI resource selection | draftCR | CATT, Sharp | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1904538 | Correction on PUSCH selection for overlapping of PUCCH and PUSCH | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1904539 | Correction on HARQ-ACK codebook determination | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1904540 | Correction on CBG based transmission for UL | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1904541 | Correction on higher layer parameter for CBGTI in DCI format 1_1 | draftCR | CATT | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1904673 | Draft CR on resource mapping related to BWP | draftCR | ZTE | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1904674 | Draft CR on PDSCH rate-matching |
draftCR revised to R1-1905691 |
ZTE | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1904675 | Draft CR on UE procedure for PDSCH and PUSCH |
draftCR revised to R1-1905736 |
ZTE | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1904676 | Draft CR on PUCCH format 1 |
draftCR revised to R1-1905654 |
ZTE | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1904677 | Draft CR on Type-1 HARQ-ACK codebook determination |
draftCR revised to R1-1905825 |
ZTE | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1904773 | Correcton on BWP configurations | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1904802 | Correction on definition of resource block bundles for interleaved VRB-to-PRB mapping | draftCR | Spreadtrum Communications | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
not treated | [WTS] [JSN] | |
R1-1904866 | Correction on configured scheduling PUSCH repetition with dynamic SFI | draftCR | Sharp | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1904867 | Correction on CBG based transmission for uplink | draftCR | Sharp | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1904868 | Correction on frequency offset for DCI format 0_0 with CRC scrambled by TC-RNTI | draftCR | Sharp | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1904869 | Clarification of PDSCH processing capability 1 | other | Sharp |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |||
R1-1905039 | Draft TS 38.213 CR on conflict between serving cell SSB transmission and dynamic SFI | draftCR | vivo | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905083 | On support of slot aggregation when scheduled using fallback DCI formats | discussion | Intel Corporation | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | ||
R1-1905116 | Correction on physical downlink control channel | draftCR | ASUSTeK | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1905136 | Draft CR to 38.213 on Clarification of ACK or NACK for TB-based HARQ-ACK codebook | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905137 | Draft CR to 38.214 clarifying calculation of DataRate and DataRateCC |
draftCR revised to R1-1905887 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905138 | Calculation of DataRate and DataRateCC in 38.214 | discussion | Ericsson | NR_newRAT-Core |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | ||
R1-1905174 | Clarification on Type2 configured grant | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1905175 | Clarification on resource allocation of Type 1 configured grant | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1905176 | Clarification on CG transmission opportunities | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905177 | Clarification on DL-SPS transmission | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1905178 | Clarification regarding non-full-duplex UE communication |
draftCR revised to R1-1905516 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905241 | Discussion on PDCCH monitoring for NN-DC in Rel-15 late drop | other | Huawei, HiSilicon |
R1-96 AI: 7.1.3 |
not treated | [WTS] [JSN] | |||
R1-1905244 | Correction on UE DM-RS transmission procedure for SP-CSI-RNTI | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905245 | Correction on rate matching indication | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905248 | Correction on DCI size alignment in TS 38.212 |
draftCR revised to R1-1905744 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905250 | Correction on PDCCH monitoring |
draftCR revised to R1-1905686 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905251 | Correction on DCI format ambiguity | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
not pursued | [WTS] [JSN] | |
R1-1905252 | Correction on the timeline condition of multiplexing two HARQ-ACK information in one slot |
draftCR revised to R1-1905850 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905253 | Correction on redundancy version for configured grant | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1905255 | Correction on mapping from virtual to physical resource blocks |
draftCR revised to R1-1905682 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905516 | Clarification regarding non-full-duplex UE communication |
draftCR revision of R1-1905178 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905524 | Summary of draft CRs on DCI content |
discussion revised to R1-1905674 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905525 | Summary of draft CRs on resource allocation |
discussion revised to R1-1905675 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905526 | Summary of Draft CRs on CA and HARQ-ACK Codebook for Rel-15 NR | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905599 | Summary on CRs related to rate-matching in NR | discussion | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905607 | Summary for PDCCH structure and search space | discussion | NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905608 | Summary for Rel-15 UL transmission procedure | discussion | NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905612 | Summary for Rel-15 CRs on DL/UL data scheduling and HARQ procedure |
discussion revised to R1-1905653 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905613 | Summary of CRs on UCI multiplexing on PUSCH |
discussion revised to R1-1905816 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905617 | Rel-15 CR summary on long format PUCCH | discussion | Huawei | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905619 | Summary of draft CRs on UL Control |
discussion revised to R1-1905718 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905626 | Summary on Rel-15 NR CRs for CBG retransmission | discussion | LG Electronics | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905633 | Summary of CRs for SFI for Rel.15 |
discussion revised to R1-1905664 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905646 | Summary of bandwidth part related draft CRs |
discussion revised to R1-1905705 |
MediaTek | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905653 | Summary for Rel-15 CRs on DL/UL data scheduling and HARQ procedure |
discussion revision of R1-1905612 revised to R1-1905872 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905654 | CR on PUCCH format 1 |
CR revision of R1-1904676 |
ZTE | 38.211 15.5.0 CR#10 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905664 | Summary of CRs for SFI for Rel.15 |
discussion revision of R1-1905633 revised to R1-1905708 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905674 | Summary#2 of draft CRs on DCI content |
discussion revision of R1-1905524 revised to R1-1905730 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905675 | Summary#2 of draft CRs on resource allocation |
discussion revision of R1-1905525 revised to R1-1905731 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905682 | Correction on mapping from virtual to physical resource blocks |
CR revision of R1-1905255 |
Huawei, HiSilicon, ZTE, Spreadtrum Communications | 38.211 15.5.0 CR#12 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905686 | Correction on PDCCH monitoring |
draftCR revision of R1-1905250 revised to R1-1905883 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905687 | [Draft] CR on maximum modulation order configured for serving cell |
draftCR revision of R1-1904277 revised to R1-1905896 |
Intel Corporation | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905689 | LS on PDCCH monitoring for NR-DC |
LS out LS To: RAN2 |
RAN1, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
approved | [WTS] [JSN] | |
R1-1905691 | Draft CR on PDSCH rate-matching |
draftCR revision of R1-1904674 |
ZTE, Huawei, Nokia | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1905692 | Summary for Rel-15 UL configured grant transmision | discussion | NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905705 | Summary of bandwidth part related draft CRs |
discussion revision of R1-1905646 |
MediaTek | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905708 | Summary of CRs for SFI for Rel.15 |
discussion revision of R1-1905664 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905718 | Summary of draft CRs on UL Control |
discussion revision of R1-1905619 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905727 | Offline Summary for Draft CRs on CA and HARQ-ACK Codebook | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905730 | Summary#4 of draft CRs on resource allocation |
discussion revision of R1-1905674 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905731 | Summary#3 of draft CRs on resource allocation |
discussion revision of R1-1905675 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905736 | Draft CR on UE procedure for PDSCH and PUSCH |
draftCR revision of R1-1904675 revised to R1-1905742 |
ZTE | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905737 | Correction on configured scheduling PUSCH repetition with dynamic SFI |
draftCR revised to R1-1905743 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905742 | CR on UE procedure for PDSCH and PUSCH |
CR revision of R1-1905736 |
ZTE | 38.214 15.5.0 CR#27 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905743 | Correction on configured scheduling PUSCH repetition with dynamic SFI |
CR revision of R1-1905737 |
Qualcomm | 38.214 15.5.0 CR#28 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905744 | Correction on DCI size alignment in TS 38.212 |
CR revision of R1-1905248 |
Huawei, HiSilicon | 38.212 15.5.0 CR#15 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905746 | CR on the determination of the minimum number of PRBs for PUCCH transmission |
CR revised to R1-1905796 |
MediaTek | 38.213 15.5.0 CR#36 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] |
R1-1905747 | Draft CR to 38.211 on determined number of PRBs for PUCCH format 3 | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
endorsed | [WTS] [JSN] | |
R1-1905749 | Clarification on CG transmission opportunities |
draftCR revised to R1-1905822 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905750 | CR on missing case for DCI format 1_1 with CS-RNTI |
CR revision of R1-1904390 |
Samsung | 38.213 15.5.0 CR#35 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905752 | Draft CR on rate matching for PDSCH scheduled by DCI format 1_0 |
draftCR revision of R1-1904469 revised to R1-1905826 |
Nokia, Nokia Shanghai Bell, MediaTek Inc. | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905758 | [Draft] CR on inclusion of TC-RNTI for monitored RNTI for UL-SCH and inclusion of monitoring PDCCH ordering PRACH on Scell |
draftCR revision of R1-1904278 revised to R1-1905888 |
Intel Corporation, Qualcomm | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905795 | Correction to simultaneous reception of DL Channels |
draftCR revision of R1-1904279 revised to R1-1905823 |
Intel Corporation | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905796 | CR on the determination of the minimum number of PRBs for PUCCH transmission |
CR revision of R1-1905746 |
MediaTek, Ericsson | 38.213 15.5.0 CR#361 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905809 | Options for Type-1 HARQ-ACK Codebook Pseudo-code Update | discussion | Samsung | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905810 | Correction on CRC assumption for multi-CSI resource selection and CSI report(s) selection |
draftCR revised to R1-1905886 |
CATT | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905816 | Summary#2 of CRs on UCI multiplexing on PUSCH |
discussion revision of R1-1905613 revised to R1-1905859 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905822 | Clarification on CG transmission opportunities |
draftCR revision of R1-1905749 revised to R1-1905827 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905823 | Correction to simultaneous reception of DL Channels |
CR revision of R1-1905795 |
Intel Corporation | 38.202 15.4.0 CR#6 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905825 | Draft CR on Type-1 HARQ-ACK codebook determination |
draftCR revision of R1-1904677 revised to R1-1905875 |
ZTE | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905826 | CR on rate matching for PDSCH scheduled by DCI format 1_0 |
CR revision of R1-1905752 |
Nokia | 38.214 15.5.0 CR#29 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905827 | Clarification on CG transmission opportunities |
CR revision of R1-1905822 |
Ericsson | 38.214 15.5.0 CR#30 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905850 | Correction on the timeline condition of multiplexing two HARQ-ACK information in one slot |
draftCR revision of R1-1905252 revised to R1-1905890 |
Huawei, HiSilicon, Qualcomm | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905859 | Summary#2 of CRs on UCI multiplexing on PUSCH |
discussion revision of R1-1905816 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905872 | Updated summary for Rel-15 CRs on DL/UL data scheduling and HARQ procedure |
discussion revision of R1-1905653 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] | |
R1-1905873 | [Draft] Clarification of reference to PDSCH processing capability 1 in TS 38.213 |
draftCR revised to R1-1905889 |
Sharp | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905875 | Draft CR on Type-1 HARQ-ACK codebook determination |
draftCR revision of R1-1905825 revised to R1-1905891 |
ZTE, Samsung | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905883 | Correction on PDCCH monitoring |
CR revision of R1-1905686 |
Huawei, HiSilicon | 38.213 15.5.0 CR#40 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905886 | Correction on CRC assumption for multi-CSI resource selection and CSI report(s) selection |
CR revision of R1-1905810 |
CATT | 38.213 15.5.0 CR#41 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905887 | CR to 38.214 clarifying calculation of DataRate and DataRateCC |
CR revision of R1-1905137 |
Ericsson | 38.214 15.5.0 CR#32 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905888 | CR on inclusion of TC-RNTI for monitored RNTI for UL-SCH and inclusion of monitoring PDCCH ordering PRACH on Scell |
CR revision of R1-1905758 |
Intel Corporation, Qualcomm | 38.202 15.4.0 CR#7 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905889 | Clarification of reference to PDSCH processing capability 1 in TS 38.213 |
CR revision of R1-1905873 |
Sharp | 38.213 15.5.0 CR#42 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905890 | Correction on the timeline condition of multiplexing two HARQ-ACK information in one slot |
CR revision of R1-1905850 |
Huawei, HiSilicon, Qualcomm | 38.213 15.5.0 CR#43 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905891 | CR on Type-1 HARQ-ACK codebook determination |
CR revision of R1-1905875 |
ZTE, Samsung | 38.213 15.5.0 CR#44 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905896 | [Draft] CR on maximum modulation order configured for serving cell |
draftCR revision of R1-1905687 revised to R1-1905908 |
Intel Corporation | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905908 | [Draft] CR on maximum modulation order configured for serving cell |
draftCR revision of R1-1905896 revised to R1-1905910 |
Intel Corporation | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
revised | [WTS] [JSN] | |
R1-1905910 | CR on maximum modulation order configured for serving cell |
CR revision of R1-1905908 |
Intel Corporation | 38.212 15.5.0 CR#18 catF | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
agreed | [WTS] [JSN] |
R1-1905914 | Summary of email discussion [96b-NR-01] PDCCH blind decoding for Rel.15 NR-DC | discussion | NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-96 AI: 7.1.3 |
noted | [WTS] [JSN] |
119 documents (0.37579584121704 seconds)