Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-163983 | Evaluation assumptions for NR multiple access | other | Samsung |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-163984 | Discussion on phase noise modeling | other | Samsung |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-163985 | Discussion on achieving data rate and spectral efficiency KPIs for NR | other | Samsung |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-163986 | Remaining details of TRP antenna modeling and TXRU mapping/virtualization | other | Samsung |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-163987 | Remaining details of UE antenna modeling and TXRU mapping/virtualization | other | Samsung |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-163988 | Evaluation methodology and KPI for URLLC | other | Samsung |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164029 | Clarification and proposals on parameters for high speed train scenarios | discussion | Mitsubishi Electric Co. |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164034 | Further evaluation assumptions for waveform | other | Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164041 | Phase noise model for above 6GHz | other | Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164044 | Evaluation assumption for non-eMBB deployment scenarios | other | Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164045 | SLS parameters for evaluation scenarios for multiple access evaluation | other | Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164173 | Discussion on URLLC evaluation assumptions and scenarios | discussion | Intel Corporation | Rel-14 |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | ||
R1-164174 | Discussion on channel modeling framework for UE-UE and eNB-eNB interference | discussion | Intel Corporation | Rel-14 |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | ||
R1-164175 | Traffic model for small packet size | discussion | Intel Corporation | Rel-14 |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | ||
R1-164243 | Remaining issues on deployment scenarios | discussion | CATT | Rel-14 |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | ||
R1-164244 | Remaining issues on link/system-level evaluation assumptions for MA | discussion | CATT | Rel-14 |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | ||
R1-164245 | Discussion on link-level evaluation assumptions for channel coding | discussion | CATT | Rel-14 |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | ||
R1-164262 | Remaining issue with link level simulation for multiple access | discussion | ZTE |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164263 | Remaining issue with system level simulation for multiple access | discussion | ZTE |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164264 | Requirement KPIs and system performance targets for multiple access | discussion | ZTE |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164293 | Evaluation Assumptions for NR MIMO |
other revised to R1-165443 |
ZTE |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-164373 | Evaluation methodology for Massive MIMO in New Radio | other | Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164383 | Further discussion on evaluation assumption for eMBB deployment scenarios | other | Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164391 | Overview of remaining issues of evaluation assumption | other | Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164553 | Evaluation assumptions for eV2X | discussion | LG Electronics |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164554 | Proposal for UE antenna model for new RAT | discussion | LG Electronics |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164555 | Remaining Issues on Evaluation Assumptions for New Radio Interface | discussion | LG Electronics |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164586 | LLS assumptions for waveform evaluation in mMTC UL transmissions | discussion | Spreadtrum Communications | Rel-14 |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | ||
R1-164587 | Further consideration on the evaluation assumption of multiple access | discussion | Spreadtrum Communications | Rel-14 |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | ||
R1-164618 | On baseline UE receiver for NR |
discussion revised to R1-165424 |
ORANGE | FS_NR_newRAT | Rel-15 |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |
R1-164675 | Initial DL KPI evaluation for eMBB | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164676 | Initial UL KPI evaluation for eMBB | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164677 | mmW related simulation assumption parameters | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164678 | High speed train scenario clarification | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164679 | Highway and urban grid evaluation scenarios | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164680 | Other KPI evaluation assumptions |
discussion revision of R1-164682 |
Qualcomm Incorporated |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164681 | URLLC KPI evaluation assumptions | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164682 | Other KPI evaluation assumptions |
discussion revised to R1-164680 |
Qualcomm Incorporated |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-164683 | Multiple access evaluation assumption | discussion | Qualcomm Incorporated |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164718 | Discussion on System-Level Evaluations for NR |
other revised to R1-165483 |
Samsung |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-164721 | On justification of the parameter selection for PA models in link level evaluation | other | Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164868 | Evaluation assumptions for high speed scenario | discussion | ETRI |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164887 | Remaining Evaluation Assumptions for High Speed Train Scenario | other | CMCC |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164888 | Phase Noise in High Frequency Bands for New Radio Systems | other | CMCC |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-164950 | On new antenna model for NR basestation | discussion | Ericsson |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-164951 | Scenarios and Evaluation methodology for NR | discussion | Ericsson |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-165005 | On the evaluation of PN model | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-165006 | On the evaluation of PA model | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165007 | Details on the system simulation scenarios | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-165008 | UE battery life evaluation for mMTC use cases | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165009 | System level simulation assumptions for mMTC use cases | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-165010 | Waveform comparison simulation assumptions for 30 GHz and beyond | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-165078 | Remaining details of NR evaluation assumptions | discussion | Intel Corporation | Rel-14 |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | ||
R1-165424 | On baseline UE receiver for NR |
discussion revision of R1-164618 |
ORANGE, Vodafone | FS_NR_newRAT | Rel-15 |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |
R1-165443 | Evaluation Assumptions for NR MIMO |
other revision of R1-164293 |
ZTE |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-165482 | Remaining issues on evaluation assumptions for NR | discussion | NTT DOCOMO, INC. |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165483 | Discussion on System-Level Evaluations for NR |
discussion revision of R1-164718 |
Samsung |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165484 | WF on evaluation assumptions for high speed train scenario: Macro + relay at 30GHz | discussion | Mitsubishi Electric, ETRI |
R1-85 AI: 7.1.2 |
agreed | [WTS] [JSN] | |||
R1-165485 | WF on Extreme Long Range KPI Evaluation | discussion | Qualcomm |
R1-85 AI: 7.1.2 |
agreed | [WTS] [JSN] | |||
R1-165486 | void | other | ETSI |
R1-85 AI: 7.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-165487 | WF on URLLC KPIs and Evaluation | discussion | Qualcomm |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165488 | WF for TRP Antenna Modeling |
discussion revised to R1-165490 |
Samsung, Intel, Ericsson |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-165489 | void | other | ETSI |
R1-85 AI: 7.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-165490 | Way-forward for TRP antenna modeling |
discussion revision of R1-165488 |
Samsung, Intel, Ericson, Qualcomm, Xinwei |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165491 | WF on hybrid UE antenna modelling | discussion | Intel, Samsung, LGE |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-165576 | WF on evaluation assumptions for high speed train scenario | discussion | CMCC, CATT, Huawei, CATR, China Unicom, ZTE |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165587 | WF on remaining details of antenna modeling |
discussion revised to R1-165640 |
Intel, NTT DOCOMO |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-165588 | WF on hybrid UE antenna modelling |
discussion revised to R1-165712 |
Intel, Samsung |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165612 | WF on SLS evaluation assumptions for eV2X |
discussion revised to R1-165704 |
LG Electronics, Deutsche Telekom |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165633 | Way Forward on SLS evaluation assumptions | discussion | LG Electronics |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-165634 | Way Forward on evaluation methodologies |
discussion revised to R1-165696 |
LG Electronics |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-165639 | Way forward on further evaluation assumptions for NR waveform |
discussion revised to R1-165759 |
Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-165640 | WF on remaining details of antenna modeling |
discussion revision of R1-165587 |
Intel, NTT DOCOMO |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165675 | WF on Case 5 for waveform LLS evaluation | discussion | Spreadtrum, Orange, ZTE |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165690 | WF on eMTC evaluation assumptions | discussion | Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-165691 | WF on remaining issues on multiple access evaluation assumptions |
discussion revised to R1-165847 |
Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165693 | WF on UE Noise Figure | discussion | Straight Path, Samsung, Intel, Nokia, KT |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165696 | Way Forward on evaluation methodologies for mMTC |
discussion revision of R1-165634 |
LG Electronics, Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165697 | Way Forward on KPIs discussion for RAN1 evaluation | discussion | LG Electronics |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-165704 | WF on SLS evaluation assumptions for eV2X |
discussion revision of R1-165612 |
LG Electronics, Deutsche Telekom |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165712 | WF on hybrid UE antenna modelling |
discussion revision of R1-165588 |
Intel, Samsung |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165735 | WF on assumption details for case 5 in waveform LLS evaluation | discussion | Spreadtrum, Fraunhofer IIS, National Taiwan University, Orange, ZTE |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-165738 | Way forward on evaluation assumptions for NR waveform in high frequency bands | discussion | Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-165742 | WF on UE Receiver Noise Figures | discussion | Samsung, Ericsson, Intel, Nokia, ZTE, MediaTek, Straight Path, KT Corp., Verizon, ETRI, IITH, CeWiT, Reliance-jio, Tejas Networks, Fiberhome, Sony, Coolpad, InterDigital, Potevio, Mitsubishi Electric, SK Telecom, OPPO, Lenovo, Skyworks, Xiaomi, AT&T |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165751 | WF on hybrid UE antenna modelling | discussion | Intel, Samsung, LGE |
R1-85 AI: 7.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-165759 | Way forward on further evaluation assumptions for NR waveform |
discussion revision of R1-165639 revised to R1-165859 |
Huawei, HiSilicon, InterDigital |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-165813 | WF on Evaluation assumptions in UL LLS for contention based transmission in NR | discussion | LGE |
R1-85 AI: 7.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-165847 | WF on remaining issues on multiple access evaluation assumptions |
discussion revision of R1-165691 revised to R1-165875 |
Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-165848 | WF on mMTC evaluation assumptions | discussion | Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165850 | WF on antenna placement in Indoor scenarios | discussion | Intel, NTT DoCoMo, Samsung, Ericsson |
R1-85 AI: 7.1.2 |
agreed | [WTS] [JSN] | |||
R1-165859 | Way forward on further evaluation assumptions for NR waveform |
discussion revision of R1-165759 |
Huawei, HiSilicon, InterDigital |
R1-85 AI: 7.1.2 |
agreed | [WTS] [JSN] | |||
R1-165875 | WF on remaining issues on multiple access evaluation assumptions |
discussion revision of R1-165847 revised to R1-166006 |
Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165914 | WF on further evaluation assumption for NR waveform 30GHz and beyond | discussion | Nokia, Intel |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165916 | WF on DL Multiple Acess for eMBB | discussion | MediaTek, Spreadtrum |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165917 | Way Forward on High Speed link level evaluation |
discussion revised to R1-166020 |
Cohere, AT&T, CMCC, Deutsche Telekom, InterDigital, Orange, Spreadtrum, Telefonica, Telstra |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-165926 | WF on additional evaluation assumptions for high speed train scenario: Macro + relay around 30GHz | discussion | Mitsubishi Electric, ETRI, Ericsson |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-165930 | WF on evaluation assumptions for eMBB | discussion | LGE |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-165944 | Chairman's Notes of Agenda Item 7.1.2 on NR eval_assumptions | discussion | Session Chairman (Nokia, Qualcomm Inc.) |
R1-85 AI: 7.1.2 |
endorsed | [WTS] [JSN] | |||
R1-165950 | WF on Remaining Evaluation Assumptions |
discussion revised to R1-166007 |
NTT DOCOMO, Intel |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-165979 | Evaluation assumptions for the high speed train scenario for around 30GHz (RRH + relay) for NR | other | Mitsubishi | FS_NR_newRAT | Rel-14 |
R1-85 AI: 7.1.2 |
agreed | [WTS] [JSN] | |
R1-165982 | WF on UE antenna number |
discussion revised to R1-166011 |
Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-165983 | WF on remaining issues for SLS parameters | discussion | Huawei |
R1-85 AI: 7.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-165989 | Way forward on calibration assumptions for NR waveform | discussion | Huawei, HiSilicon, NTT DOCOMO, Nokia |
R1-85 AI: 7.1.2 |
agreed | [WTS] [JSN] | |||
R1-165994 | WF on the antenna model for outdoor TRP |
discussion revised to R1-166019 |
Intel, NTT DOCOMO |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-166000 | WF on further evaluation assumption for NR waveform 30GHz and beyond |
discussion revised to R1-166028 |
Nokia, Alcatel-Lucent Shanghai Bell, Intel, Samsung, Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-166001 | Proposal for email discussion on evaluation assumptions for high speed train scenario: Macro + relay around 30GHz | discussion | Mitsubishi Electric, ETRI |
R1-85 AI: 7.1.2 |
agreed | [WTS] [JSN] | |||
R1-166005 | WF on Channel coding selection | discussion | Qualcomm Incorporated, ZTE |
R1-85 AI: 7.1.2 |
available | [WTS] [JSN] | |||
R1-166006 | WF on remaining issues on SLS parameters for multiple access |
discussion revision of R1-165875 |
Huawei, HiSilicon, CATT, Orange, NTT DOCOMO, Vodafone |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-166007 | WF on Remaining Evaluation Assumptions |
discussion revision of R1-165950 |
NTT DOCOMO, Intel |
R1-85 AI: 7.1.2 |
agreed | [WTS] [JSN] | |||
R1-166010 | WF on power amplifier assumptions for NR wavwform evaluations | discussion | Nokia, Alcatel Lucent Shanghai Bell |
R1-85 AI: 7.1.2 |
noted | [WTS] [JSN] | |||
R1-166011 | WF on UE antenna number |
discussion revision of R1-165982 |
Huawei, HiSilicon |
R1-85 AI: 7.1.2 |
agreed | [WTS] [JSN] | |||
R1-166016 | Way forward on email discussion for waveforms | discussion | Huawei, HiSilicon, National Taiwan University, NTT DOCOMO, Nokia |
R1-85 AI: 7.1.2 |
agreed | [WTS] [JSN] | |||
R1-166019 | WF on the antenna model for outdoor TRP |
discussion revision of R1-165994 revised to R1-166026 |
Intel, NTT DOCOMO, ZTE, Samsung, Xinwei, CATT, Ericsson, Nokia, ASB, Huawei |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-166020 | Way Forward on High Speed link level evaluation |
discussion revision of R1-165917 revised to R1-166031 |
Cohere, AT&T, CMCC, Deutsche Telekom, InterDigital, National Taiwan University, Orange, Spreadtrum, Telefonica, Telstra |
R1-85 AI: 7.1.2 |
revised | [WTS] [JSN] | |||
R1-166026 | WF on the antenna model for outdoor TRP |
discussion revision of R1-166019 |
Intel, NTT DOCOMO, ZTE, Samsung, Xinwei, CATT, Ericsson, Nokia, ASB, Huawei |
R1-85 AI: 7.1.2 |
agreed | [WTS] [JSN] | |||
R1-166028 | WF on further evaluation assumption for NR waveform 30GHz and beyond |
discussion revision of R1-166000 |
Nokia, Alcatel-Lucent Shanghai Bell, Intel, Samsung, Huawei, HiSilicon,Qualcomm |
R1-85 AI: 7.1.2 |
agreed | [WTS] [JSN] | |||
R1-166031 | Way Forward on High Speed link level evaluation |
discussion revision of R1-166020 |
Cohere, AT&T, CMCC, Deutsche Telekom, InterDigital, National Taiwan University, Orange, Spreadtrum, Telefonica, Telstra |
R1-85 AI: 7.1.2 |
agreed | [WTS] [JSN] |
117 documents (0.34262204170227 seconds)