Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-161008 | CH Agenda and Time Plan | agenda | CH SWG Chair |
S5-105 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-161009 | CH Detailed Report from LAST Meeting | report | CH SWG Chair |
S5-105 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-161010 | CH Executive Report from THIS Meeting | report | CH SWG Chair |
S5-105 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-161011 | CH Detailed Report from THIS Meeting | report | CH SWG Chair |
S5-105 AI: 7.1 |
reserved | [WTS] [JSN] | |||
S5-161075 | LSout to CT4 on Addition of AVP code definitions |
LS out LS To: CT4 |
Alcatel-Lucent | Rel-13 |
S5-105 AI: 7.1 |
revised | [WTS] [JSN] | ||
S5-161189 | Resubmitted LS from SA3 ccSA5 Reply LS to CT4 on the start of work on Diameter Base Protocol Update | LS in | S3-152460 |
S5-105 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-161192 | LS from CT3 to SA5 on Reply LS on OCS address for Gy and Gyn inter-PLMN | LS in | C3-155314 |
S5-105 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-161193 | LS from CT4 to SA5 on progress of the work on Diameter Base Protocol Update |
LS in LS reply in S5-161308, S5-161308 |
C4-152375 |
S5-105 AI: 7.1 |
replied to | [WTS] [JSN] | |||
S5-161194 | Ls from ETSI INT to SA5 on Validation project for the Conformance Test Specifications for the Diameter Protocol over the Rf and the Ro reference points |
LS in LS reply in S5-161247, S5-161247 |
ETSI INT |
S5-105 AI: 7.1 |
replied to | [WTS] [JSN] | |||
S5-161198 | LS from SA2 cc SA5 on Mobile Equipment Identity Signalling over WLAN | LS in | S2-154415 |
S5-105 AI: 7.1 |
noted | [WTS] [JSN] | |||
S5-161201 | pCR to TR 29.819 – Update Conclusion on Changes and Clarifications of the rules for Diameter Extensibility | pCR | Alcatel-Lucent | 29.819 1.0.0 |
S5-105 AI: 7.1 |
revised | [WTS] [JSN] | ||
S5-161202 | pCR TR 29.819 - Set of new other changes | pCR | Alcatel-Lucent | 29.819 1.0.0 |
S5-105 AI: 7.1 |
revised | [WTS] [JSN] | ||
S5-161246 | LSout to CT4 on Addition of AVP code definitions |
LS out LS To: CT4 |
Alcatel-Lucent | Rel-13 |
S5-105 AI: 7.1 |
approved | [WTS] [JSN] | ||
S5-161247 | Reply to: Ls from ETSI INT to SA5 on Validation project for the Conformance Test Specifications for the Diameter Protocol over the Rf and the Ro reference points |
LS out LS is reply to S5-161194 LS To: ETSI INT |
current meeting |
S5-105 AI: 7.1 |
approved | [WTS] [JSN] | |||
S5-161306 | pCR to TR 29.819 – Update Conclusion on Changes and Clarifications of the rules for Diameter ExtensibilitYes | pCR | Alcatel-Lucent | 29.819 1.0.0 |
S5-105 AI: 7.1 |
endorsed | [WTS] [JSN] | ||
S5-161307 | pCR TR 29.819 - Set of new other changes | pCR | Alcatel-Lucent | 29.819 1.0.0 |
S5-105 AI: 7.1 |
endorsed | [WTS] [JSN] | ||
S5-161308 | Reply to: LS from CT4 to SA5 on progress of the work on Diameter Base Protocol Update |
LS out LS is reply to S5-161193 LS To: CT4 |
current meeting |
S5-105 AI: 7.1 |
approved | [WTS] [JSN] |
17 documents (0.3765070438385 seconds)