Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S2-170779 | Introduction of ATCF in DRVCC | discussion | Ericsson |
S2-119 AI: 7.1 |
noted | [WTS] [JSN] | |||
S2-170898 | System Architecture impacts due to Light Connection | discussion | Ericsson, Nokia, Sony, AT&T, LG Electronics, MediaTek |
S2-119 AI: 7.1 |
noted | [WTS] [JSN] | |||
S2-170970 | New WID on core network aspects of signalling reduction to enable light connection for LTE |
WID new revised to S2-171229 |
Huawei, HiSilicon, Intel, Qualcomm Inc | Rel-14 |
S2-119 AI: 7.1 |
revised | [WTS] [JSN] | ||
S2-171062 | Proposed timeline and organisation for the SID phase 2 | discussion | Huawei, HiSilicon |
S2-119 AI: 7.1 |
noted | [WTS] [JSN] | |||
S2-171063 | Proposed initial content for a phase 2 5G TR | discussion | Huawei, HiSilicon |
S2-119 AI: 7.1 |
withdrawn | [WTS] [JSN] | |||
S2-171110 | New SID on extended architecture enhancements for LTE support of V2X services |
SID new revised to S2-171230 |
Huawei, HiSilicon, AT&T |
S2-119 AI: 7.1 |
revised | [WTS] [JSN] | |||
S2-171130 | New SID on architecture enhancements for 3GPP support of advanced V2X services (FS_eV2XARC) |
SID new revised to S2-171231 |
LG Electronics | Rel-15 |
S2-119 AI: 7.1 |
revised | [WTS] [JSN] | ||
S2-171158 | New WID on PS Data Off Feature Phase 2 |
WID new revised to S2-171232 |
Deutsche Telekom AG | Rel-15 |
S2-119 AI: 7.1 |
revised | [WTS] [JSN] | ||
S2-171195 | Study on the phase 2 work for the 5G system architecture |
SID new revised to S2-171234 |
Huawei, China Unicom, China Telecom, CATT, HiSilicon, Telecom Italia, Intel, ETRI | Rel-15 |
S2-119 AI: 7.1 |
revised | [WTS] [JSN] | ||
S2-171207 | How to structure 5GS work beyond phase 1 | discussion | Qualcomm Incorporated, LG Electronics, Ericsson | Rel-15 |
S2-119 AI: 7.1 |
noted | [WTS] [JSN] | ||
S2-171211 | EPC support for Option 3/3a/3x Dual Connectivity with New Radio |
WID new revised to S2-171233 |
Vodafone, AT&T, NTT DOCOMO, Ericsson, Qualcomm Inc. |
S2-119 AI: 7.1 |
revised | [WTS] [JSN] | |||
S2-171228 | New Study WID on System Architecture impacts due to Light Connection | SID new | Ericsson, Nokia, ZTE, AT&T, Sony, LG Electronics, MediaTek | Rel-15 |
S2-119 AI: 7.1 |
noted | [WTS] [JSN] | ||
S2-171229 | New WID on core network aspects of signalling reduction to enable light connection for LTE |
WID new revision of S2-170970 |
Huawei, HiSilicon, Intel, Qualcomm Inc | Rel-14 |
S2-119 AI: 7.1 |
noted | [WTS] [JSN] | ||
S2-171230 | New SID on extended architecture enhancements for LTE support of V2X services |
SID new revision of S2-171110 revised to S2-172130 |
Huawei, HiSilicon, AT&T |
S2-119 AI: 7.1 |
noted | [WTS] [JSN] | |||
S2-171231 | New SID on architecture enhancements for 3GPP support of advanced V2X services (FS_eV2XARC) |
SID new revision of S2-171130 |
LG Electronics | Rel-15 |
S2-119 AI: 7.1 |
postponed | [WTS] [JSN] | ||
S2-171232 | New WID on PS Data Off Feature Phase 2 |
WID new revision of S2-171158 |
Deutsche Telekom AG | Rel-15 |
S2-119 AI: 7.1 |
approved | [WTS] [JSN] | ||
S2-171233 | EPC support for Option 3/3a/3x Dual Connectivity with New Radio |
WID new revision of S2-171211 revised to S2-171551 |
Vodafone, AT&T, NTT DOCOMO, Ericsson, Qualcomm Inc., Sprint |
S2-119 AI: 7.1 |
revised | [WTS] [JSN] | |||
S2-171234 | New SID on continuation of the work for the 5G system architecture |
SID new revision of S2-171195 |
Huawei, China Unicom?, China Telecom?, China Mobile?, KDDI?, CATT?, HiSilicon?, Telecom Italia?, Intel?, ETRI? | Rel-15 |
S2-119 AI: 7.1 |
noted | [WTS] [JSN] | ||
S2-171551 | EPC support for Option 3/3a/3x Dual Connectivity with New Radio |
WID new revision of S2-171233 revised to S2-171610 |
Vodafone, AT&T, NTT DOCOMO, Ericsson, Qualcomm Inc., Sprint |
S2-119 AI: 7.1 |
revised | [WTS] [JSN] | |||
S2-171610 | EPC support for Option 3/3a/3x Dual Connectivity with New Radio |
WID new revision of S2-171551 |
Vodafone, AT&T, NTT DOCOMO, Ericsson, Qualcomm Inc., Sprint |
S2-119 AI: 7.1 |
approved | [WTS] [JSN] |
20 documents (0.3661630153656 seconds)