Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R1-2106474 | Clarification on back-to-back PUSCHs scheduling restriction | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-16 |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | |
| R1-2106516 | Correction on prioritization rules of SRS carrier switching | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-16 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2106517 | Correction on data and control multiplexing | draftCR | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2106533 | Discussion on SRS carrier switching | discussion | ZTE |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | |||
| R1-2106534 | Draft CR on SRS carrier switching | draftCR | ZTE | NR_newRAT-Core | Rel-16 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2106535 | Draft CR on the number of layers to determine TBS | draftCR | ZTE | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2106536 | Discussion on accumulated closed loop power control for BWP switching | discussion | ZTE | Rel-15 |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | ||
| R1-2106537 | Draft CR on accumulated closed loop power control for BWP switching | draftCR | ZTE | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2106684 | PDSCH processing time per Capability 2 and DCI format 1_0 | discussion | Spreadtrum Communications | Rel-15 |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | ||
| R1-2106726 | Discussion on Configuration of First Active BWP | discussion | ZTE | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2106773 | Correction of physical-layer model of BCH transmission | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2106774 | Correction of physical-layer model of BCH transmission | draftCR | Ericsson | NR_newRAT-Core | Rel-16 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2106856 | Discussion on counting PDCCH candidates in overbooking procedure | discussion | Samsung |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |||
| R1-2106857 | Correction on counting PDCCH candidates in overbooking procedure | draftCR | Samsung | NR_L1enh_URLLC-Core | Rel-16 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2106927 | Discussion on overlapping between positive SR and PUSCH without UL-SCH | discussion | CATT |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |||
| R1-2106928 | Discussion on cancellation of semi-static transmission due to dynamic transmission | discussion | CATT |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |||
| R1-2107008 | On the PDCCH monitoring behavior during SCell activation | discussion | ZTE, Sanechips |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | |||
| R1-2107159 | TP for editor’s CR on Precoding information and number of layers, and Antenna port(s) configuration table | discussion | NEC | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2107299 | TP for editor’s CR | discussion | NEC |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |||
| R1-2107310 | Discussion on HARQ-ACK multiplexing on PUSCH without PUCCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | ||
| R1-2107311 | Discussion on SRS carrier switching | discussion | Qualcomm Incorporated | Rel-15 |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | ||
| R1-2107312 | Draft CR on Rel-16 Type-1 HARQ-ACK codebook construction | draftCR | Qualcomm Incorporated | NR_newRAT-Core, TEI16 | Rel-16 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2107313 | Clarification on back-to-back PUSCHs scheduling restriction | draftCR | Qualcomm Incorporated | NR_newRAT-Core | Rel-16 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2107314 | Clarification on coefficient reporting order in Type II CSI | discussion | Qualcomm Incorporated | Rel-15 |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | ||
| R1-2107389 | Draft CR on PDCCH DMRS scrambling sequence | CR | CMCC, ZTE | 38.211 15.9.0 CR#75 catF | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] |
| R1-2107503 | Draft 38.213 CR on PUSCH/PUCCH power control adjustment state during UL BWP change | draftCR | MediaTek Inc. | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2107504 | On two DCIs in the same slot for BWP switch | discussion | MediaTek Inc. |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |||
| R1-2107505 | On PUSCH scheduling restriction | discussion | MediaTek Inc. |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | |||
| R1-2107506 | Clarification on Multiplexing HARQ-ACK Information in PUSCH without PUCCH | discussion | MediaTek Inc. |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | |||
| R1-2107507 | Clarification on PUSCH with UCI only and DMRS multiplexing | discussion | MediaTek Inc. |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |||
| R1-2107525 | Correction to cell-specific PUCCH resource configuration with pucch-ResourceCommon | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2107567 | Discussion on SRS carrier switching | discussion | Intel Corporation | Rel-15 |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | ||
| R1-2107568 | On UE processing capability #2 and PDSCH scheduled by DCI 1_0 | discussion | Intel Corporation | Rel-15 |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | ||
| R1-2107626 | draftCR on PUCCH maxCodeRate in TS 38.213 (Rel-15) | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2107627 | draftCR on PUCCH maxCodeRate in TS 38.213 (Rel-16) | draftCR | Ericsson | NR_newRAT-Core | Rel-16 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2107672 | Discussion on the UCI multiplexing without PUCCH | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-16 |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | |
| R1-2107677 | Processing time for PDSCH scheduled by DCI format 1_0 | discussion | Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | |
| R1-2107683 | Correction to PDSCH rate matching for SPS |
draftCR revised to R1-2108335 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-16 |
R1-106-e AI: 7.1 |
revised | [WTS] [JSN] | |
| R1-2107708 | Draft CR on PT-RS threshold report (CatF) | draftCR | Apple | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2107709 | Draft CR on PT-RS threshold report (CatA) | draftCR | Apple | NR_newRAT-Core | Rel-16 |
R1-106-e AI: 7.1 |
not pursued | [WTS] [JSN] | |
| R1-2107710 | Timeline Considerations for SRS Carrier Switching and Dropping Procedure in Rel-16 | discussion | Apple |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | |||
| R1-2107711 | Discussions on PUSCH UCI Multiplexing without HARQ-ACK PUCCH in Rel-15 and Rel-16 | discussion | Apple |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | |||
| R1-2107835 | Discussion on HARQ-ACK multiplexing on PUSCH without PUCCH overlapping | discussion | NTT DOCOMO, INC. | Rel-15 |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | ||
| R1-2107836 | Discussion on PUSCH without UL-SCH and with FDM indication | discussion | NTT DOCOMO, INC. | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | ||
| R1-2107973 | Discussion on CSI-RS multiplexing with PDSCH scheduled by PDCCH with CRC scrambled by P-RNTI and SI-RNTI | discussion | vivo |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |||
| R1-2107974 | Draft CR on PUCCH power control for Rel-15 | draftCR | vivo | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
postponed | [WTS] [JSN] | |
| R1-2107975 | Discussion on SRS carrier switching | discussion | vivo |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | |||
| R1-2107995 | Capability 2 and fallback DCI format 1-0 PDSCH handling | discussion | Ericsson |
R1-106-e AI: 7.1 |
not treated | [WTS] [JSN] | |||
| R1-2108320 | Summary of [106-e-NR-7.1CRs-02] Issue#2: Correction on prioritization rules of SRS carrier switching | discussion | Moderator (Huawei) | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2108335 | Correction to PDSCH rate matching for SPS |
CR revision of R1-2107683 |
Huawei, HiSilicon | 38.214 16.6.0 CR#204 catF | NR_newRAT-Core, TEI16 | Rel-16 |
R1-106-e AI: 7.1 |
agreed | [WTS] [JSN] |
| R1-2108365 | Summary of [106-e-NR-7.1CRs-10] Correction on counting PDCCH candidates in overbooking procedure | discussion | Moderator (Samsung) | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2108388 | Summary on [106-e-NR-7.1CRs-12] | discussion | Moderator (Samsung) | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2108403 | Summary of [106-e-NR-7.1CRs-05] | discussion | Moderator (CATT) | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2108412 | Summary on [106-e-NR-7.1CRs-11] | discussion | Moderator (NEC) | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2108413 | Summary of [106-e-NR-7.1CRs-06] on the PDCCH monitoring behavior during SCell activation | discussion | Moderator (ZTE) | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2108414 | Email Discussion Summary of [106-e-NR-7.1CRs-03] | discussion | Moderator (ZTE) | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2108489 | CR to 38.214 clarification on coefficients packing order for Type II CSI | CR | Moderator (Qualcomm Incorporated) | 38.214 15.13.0 CR#211 catF | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
agreed | [WTS] [JSN] |
| R1-2108490 | CR to 38.214 clarification on coefficients packing order for Type II CSI | CR | Moderator (Qualcomm Incorporated) | 38.214 16.6.0 CR#212 catA | NR_newRAT-Core | Rel-16 |
R1-106-e AI: 7.1 |
agreed | [WTS] [JSN] |
| R1-2108491 | Summary of [106-e-NR-7.1CRs-08] | discussion | Moderator (Qualcomm Incorporated) | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2108565 | Summary of [106-e-NR-7.1CRs-01] Clarification on back-to-back PUSCHs scheduling restriction | discussion | Moderator (MediaTek Inc.) | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2108566 | Clarification on back-to-back PUSCHs scheduling restriction | CR | Moderator (MediaTek), Apple, CATT | 38.214 15.13.0 CR#213 catF | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
agreed | [WTS] [JSN] |
| R1-2108567 | Clarification on back-to-back PUSCHs scheduling restriction | CR | Moderator (MediaTek), Apple, CATT | 38.214 16.6.0 CR#214 catA | NR_newRAT-Core | Rel-16 |
R1-106-e AI: 7.1 |
agreed | [WTS] [JSN] |
| R1-2108573 | Summary of discussion on PDSCH processing time per Capability 2 and DCI format 1_0 | discussion | Moderator (Intel) | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] | |
| R1-2108591 | Rel-15 editorial corrections for TS 38.212 | CR | Huawei | 38.212 15.11.0 CR#73 catF | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
agreed | [WTS] [JSN] |
| R1-2108592 | Rel-15 editorial corrections for TS 38.212 (mirrored to Rel-16) | CR | Huawei | 38.212 16.6.0 CR#74 catA | NR_newRAT-Core | Rel-16 |
R1-106-e AI: 7.1 |
agreed | [WTS] [JSN] |
| R1-2108647 | Summary for [106-e-NR-7.1CRs-07] Discussion on HARQ-ACK multiplexing on PUSCH without PUCCH | discussion | Moderator(Apple) | NR_newRAT-Core | Rel-15 |
R1-106-e AI: 7.1 |
noted | [WTS] [JSN] |
66 documents (0.42732191085815 seconds)