Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-233238 | pCR TR 28.913 KI#1 Consideration of four types of metrics to estimate VNF Energy Consumption | pCR | Huawei, Ericsson, AT&T, Deutsche Telekom | 28.913 0.5.0 | FS_EE5G_Ph2 | Rel-18 |
S5-148-e AI: 6.9.1.1 |
noted | [WTS] [JSN] |
S5-233239 | pCR 28.913 Conclusion for KI#2 Energy Consumption of containerized VNF/ VNFCs |
pCR revised to S5-233614 |
Huawei, Deutsche Telekom | 28.913 0.5.0 | FS_EE5G_Ph2 | Rel-18 |
S5-148-e AI: 6.9.1.1 |
revised | [WTS] [JSN] |
S5-233240 | pCR 28.913 Conclusion for KI#3 Energy Consumption of RAN nodes |
pCR revised to S5-233615 |
Huawei, Deutsche Telekom | 28.913 0.5.0 | FS_EE5G_Ph2 | Rel-18 |
S5-148-e AI: 6.9.1.1 |
revised | [WTS] [JSN] |
S5-233241 | pCR 28.913 Conclusion for KI#4 EE KPI for V2X network slice |
pCR revised to S5-233616 |
Huawei, Deutsche Telekom | 28.913 0.5.0 | FS_EE5G_Ph2 | Rel-18 |
S5-148-e AI: 6.9.1.1 |
revised | [WTS] [JSN] |
S5-233247 | pCR 28.913 Conclusion for KI#6 EE KPI for URLLC network slice based on reliability | pCR | Huawei Technologies France | 28.913 0.5.0 | FS_EE5G_Ph2 | Rel-18 |
S5-148-e AI: 6.9.1.1 |
noted | [WTS] [JSN] |
S5-233248 | pCR 28.913 Conclusion for KI#7 Roles involved in EE KPI building |
pCR revised to S5-233617 |
Huawei, Deutsche Telekom | 28.913 0.5.0 | FS_EE5G_Ph2 | Rel-18 |
S5-148-e AI: 6.9.1.1 |
revised | [WTS] [JSN] |
S5-233498 | Add New Key issue and solution for Energy Efficiency of URLLC network slice- RAN based | pCR | China Unicom | 28.913 0.5.0 | FS_EE5G_Ph2 | Rel-18 |
S5-148-e AI: 6.9.1.1 |
noted | [WTS] [JSN] |
S5-233503 | Add potential solution for Energy Efficiency KPI of URLLC Network Slice based on both latency and reliability | pCR | China Unicom | 28.913 0.5.0 | FS_EE5G_Ph2 | Rel-18 |
S5-148-e AI: 6.9.1.1 |
noted | [WTS] [JSN] |
S5-233536 | Rel-18 pCR 28.913 Add Conclusion and Recommendation for Key Issue 6 | pCR | Samsung Electronics Nordic AB | 28.913 0.5.0 | FS_EE5G_Ph2 | Rel-18 |
S5-148-e AI: 6.9.1.1 |
noted | [WTS] [JSN] |
S5-233614 | pCR 28.913 Conclusion for KI#2 Energy Consumption of containerized VNF/ VNFCs |
pCR revision of S5-233239 |
Huawei, Deutsche Telekom | 28.913 0.5.0 | FS_EE5G_Ph2 | Rel-18 |
S5-148-e AI: 6.9.1.1 |
approved | [WTS] [JSN] |
S5-233615 | pCR 28.913 Conclusion for KI#3 Energy Consumption of RAN nodes |
pCR revision of S5-233240 |
Huawei, Deutsche Telekom | 28.913 0.5.0 | FS_EE5G_Ph2 | Rel-18 |
S5-148-e AI: 6.9.1.1 |
approved | [WTS] [JSN] |
S5-233616 | pCR 28.913 Conclusion for KI#4 EE KPI for V2X network slice |
pCR revision of S5-233241 |
Huawei, Deutsche Telekom | 28.913 0.5.0 | FS_EE5G_Ph2 | Rel-18 |
S5-148-e AI: 6.9.1.1 |
approved | [WTS] [JSN] |
S5-233617 | pCR 28.913 Conclusion for KI#7 Roles involved in EE KPI building |
pCR revision of S5-233248 |
Huawei, Deutsche Telekom | 28.913 0.5.0 | FS_EE5G_Ph2 | Rel-18 |
S5-148-e AI: 6.9.1.1 |
approved | [WTS] [JSN] |
13 documents (0.36984205245972 seconds)