Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-2003208 | Considerations on gNB measurement report mapping | discussion | Intel Corporation | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |
R4-2003287 | Discussion on gNB measurement requirement and report mapping | discussion | CATT | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |
R4-2003295 | LS on gNB measurement report mapping |
LS out LS To: RAN2 |
CATT | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |
R4-2003546 | draft CR on UL RTOA measurement report mapping | draftCR | CATT | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
postponed | [WTS] [JSN] | |
R4-2003547 | draft CR on gNB Rx-Tx time difference measurement report mapping | draftCR | CATT | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
postponed | [WTS] [JSN] | |
R4-2003548 | draft CR on SRS RSRP time difference measurement report mapping | draftCR | CATT | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
postponed | [WTS] [JSN] | |
R4-2003572 | on gNB requirements for NR positioning | discussion | Qualcomm Incorporated | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |
R4-2004002 | Optionality for positioning measurements in gNB | discussion | Ericsson LM | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |
R4-2004011 | BS measurements reporting mapping for gNB Rx-Tx, SRS-RSRP and UL RTOA | discussion | Ericsson LM | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |
R4-2004012 | Scenarios for gNB Rx-Tx and SRS-RSRP measurements for BS | discussion | Ericsson LM | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |
R4-2004036 | Feasibility of UL RTOA and AoA measurements for BS | discussion | Ericsson LM | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |
R4-2004078 | On gNB measurement accuracy requirements for NR positioning | discussion | Nokia, Nokia Shanghai Bell | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |
R4-2004079 | On gNB measurement report mapping for NR positioning | discussion | Nokia, Nokia Shanghai Bell | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |
R4-2004363 | Discussion on the scope gNB requirements for NR positioning | discussion | Huawei, HiSilicon, CMCC | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |
R4-2004364 | Discussion on gNB positioning measurement requirements and report mapping | discussion | Huawei, HiSilicon | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |
R4-2004365 | [draft] LS on report mapping for gNB positioning measurement |
LS out LS To: RAN3 |
Huawei, HiSilicon | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] | |
R4-2004969 | gNB requirements for NR positioning | discussion | ZTE Corporation | NR_pos-Core | Rel-16 |
R4-ah-38107 AI: 6.8.2.3 |
noted | [WTS] [JSN] |
17 documents (0.36501908302307 seconds)