Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S5-174032 Minutes of Study on management aspects of virtualized network functions that are part of the NR report Rapporteur (Intel) S5-114

AI: 6.6.7

noted [WTS] [JSN]
S5-174107 pCR TR 32.864 Add potential solutions to support partially virtualized NF under NFV concept pCR

revised to S5-174442

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174108 pCR TR 32.864 Corrections regarding transport network requirements pCR Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

withdrawn [WTS] [JSN]
S5-174109 pCR TR 32.864 Add gap analysis on adding, deleting and replacing the non-virtualized part of gNB pCR

revised to S5-174439

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174110 pCR TR 32.864 Add the CU and DU modelling option pCR Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

noted [WTS] [JSN]
S5-174111 pCR TR 32.864 Add potential solution for establishing relation between virtualized part and non-virtualized part of a gNB pCR

revised to S5-174440

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174112 pCR TR 32.864 Add potential solution for establishing relation between the CN NF and the gNB pCR

revised to S5-174441

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174113 pCR TR 32.864 Add potential solution for instantiating NS containing CN VNF and gNB pCR

revised to S5-174443

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174114 pCR TR 32.864 Add potential solution for updating transport network requirements pCR

revised to S5-174444

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174115 pCR TR 32.864 Add potential solution for on-boarding NSD for the gNB pCR

revised to S5-174445

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174116 pCR TR 32.864 Add potential solution for adding VNFFGD and VNFFGs for the gNB pCR Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

noted [WTS] [JSN]
S5-174117 pCR TR 32.864 add UC for collecting performance measurements pCR Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

noted [WTS] [JSN]
S5-174118 pCR TR 32.864 add UC for fault detection pCR Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

noted [WTS] [JSN]
S5-174119 pCR TR 32 864 Add UC on validation of NsDf for a NSD pCR

revised to S5-174435

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174120 pCR TR 32.864 Add conclusions pCR

revised to S5-174446

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174121 pCR TR 32.864 Add Recommendations pCR

revised to S5-174447

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174262 pCR TR 32.864 Add UC on depoyment of non-virtualized part of gNB based on the available non-virualized resource pCR

revised to S5-174436

China Mobile M2M Company Ltd. 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174263 pCR 32.864 Add UC on instantiation of virtualized part of a gNB with the concrete NFVI-POP information pCR

revised to S5-174438

China Mobile M2M Company Ltd. 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174405 Sequence proposal other Intel S5-114

AI: 6.6.7

noted [WTS] [JSN]
S5-174435 pCR TR 32 864 Add UC on validation of NsDf for a NSD pCR

revision of S5-174119

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

approved [WTS] [JSN]
S5-174436 pCR TR 32.864 Add UC on depoyment of non-virtualized part of gNB based on the available non-virualized resource pCR

revision of S5-174262

China Mobile M2M Company Ltd. 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

approved [WTS] [JSN]
S5-174438 pCR 32.864 Add UC on instantiation of virtualized part of a gNB with the concrete NFVI-POP information pCR

revision of S5-174263

China Mobile M2M Company Ltd. 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

approved [WTS] [JSN]
S5-174439 pCR TR 32.864 Add gap analysis on adding, deleting and replacing the non-virtualized part of gNB pCR

revision of S5-174109

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

approved [WTS] [JSN]
S5-174440 pCR TR 32.864 Add potential solution for establishing relation between virtualized part and non-virtualized part of a gNB pCR

revision of S5-174111

revised to S5-174478

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174441 pCR TR 32.864 Add potential solution for establishing relation between the CN NF and the gNB pCR

revision of S5-174112

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

noted [WTS] [JSN]
S5-174442 pCR TR 32.864 Add potential solutions to support partially virtualized NF under NFV concept pCR

revision of S5-174107

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

noted [WTS] [JSN]
S5-174443 pCR TR 32.864 Add potential solution for instantiating NS containing CN VNF and gNB pCR

revision of S5-174113

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

approved [WTS] [JSN]
S5-174444 pCR TR 32.864 Add potential solution for updating transport network requirements pCR

revision of S5-174114

revised to S5-174479

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174445 pCR TR 32.864 Add potential solution for on-boarding NSD for the gNB pCR

revision of S5-174115

revised to S5-174480

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174446 pCR TR 32.864 Add conclusions pCR

revision of S5-174120

revised to S5-174481

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

revised [WTS] [JSN]
S5-174447 pCR TR 32.864 Add Recommendations pCR

revision of S5-174121

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

approved [WTS] [JSN]
S5-174477 Draft TR 32.864 draft TR Intel FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

approved [WTS] [JSN]
S5-174478 pCR TR 32.864 Add potential solution for establishing relation between virtualized part and non-virtualized part of a gNB pCR

revision of S5-174440

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

noted [WTS] [JSN]
S5-174479 pCR TR 32.864 Add potential solution for updating transport network requirements pCR

revision of S5-174444

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

approved [WTS] [JSN]
S5-174480 pCR TR 32.864 Add potential solution for on-boarding NSD for the gNB pCR

revision of S5-174445

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

approved [WTS] [JSN]
S5-174481 pCR TR 32.864 Add conclusions pCR

revision of S5-174446

Intel Corporation (UK) Ltd 32.864 0.4.0 FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

approved [WTS] [JSN]
S5-174482 Presentation sheet TR 32.864 for information TS or TR cover Intel FS_MA_RNVNF Rel-15 S5-114

AI: 6.6.7

approved [WTS] [JSN]

37 documents (0.37677597999573 seconds)