Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S5-232072 Rel-18 CR 28.623 Add stage 3 solution for LcmProcess IOC CR Intel Corporation (UK) Ltd 28.623 18.1.1 CR#220 catB eNETSLICE_PRO Rel-18 S5-147

AI: 6.6.2.1

not pursued [WTS] [JSN]
S5-232101 Rel-18 CR TS28.622 Add abstract IOC Controller_ to support asynchronous LCM operations CR

revision of S5-226110

Nokia, Nokia Shanghai Bell 28.622 18.1.0 CR#1792 catB eNETSLICE_PRO Rel-18 S5-147

AI: 6.6.2.1

withdrawn [WTS] [JSN]
S5-232102 Add NetworkSliceController and NetworkSliceSubnetController IOCs to support asynchronous LCM operations CR

revision of S5-226557

Nokia, Nokia Shanghai Bell 28.541 18.2.2 CR#8003 catB eNETSLICE_PRO Rel-18 S5-147

AI: 6.6.2.1

not pursued [WTS] [JSN]
S5-232103 Procedures to support asynchronous Network Slice LCM operations CR

revision of S5-226560

Nokia, Nokia Shanghai Bell 28.531 18.1.0 CR#1453 catB eNETSLICE_PRO Rel-18 S5-147

AI: 6.6.2.1

not pursued [WTS] [JSN]
S5-232104 Rel-18 CR TS 28.623 Add stage 3 for abstract IOC Controller_ CR

revision of S5-226132

Nokia, Nokia Shanghai Bell 28.623 18.1.1 CR#2011 catB eNETSLICE_PRO Rel-18 S5-147

AI: 6.6.2.1

withdrawn [WTS] [JSN]
S5-232105 Add stage 3 for data type AvailabilityStatus CR

revision of S5-226383

Nokia, Nokia Shanghai Bell 28.623 18.1.1 CR#2142 catB eNETSLICE_PRO Rel-18 S5-147

AI: 6.6.2.1

not pursued [WTS] [JSN]
S5-232210 pCR TR 28.836 Add procedures for using intent driven approach to support async network slice provisioning pCR Huawei, Deutsche Telekom 28.836 0.3.0 FS_NETSLICE_IDMS Rel-18 S5-147

AI: 6.6.2.1

noted [WTS] [JSN]
S5-232225 Discussion paper for asynchronous LCM solutions discussion Intel Belgium SA/NV eNETSLICE_PRO Rel-18 S5-147

AI: 6.6.2.1

noted [WTS] [JSN]
S5-232226 Rel-18 CR 28.531 Update NSI / NSSI allocation procedures CR Intel Belgium SA/NV 28.531 18.1.0 CR#165 catB eNETSLICE_PRO Rel-18 S5-147

AI: 6.6.2.1

not pursued [WTS] [JSN]
S5-232227 Rel-18 CR 28.531 Update NSI / NSSI deallocation procedures CR Intel Belgium SA/NV 28.531 18.1.0 CR#166 catB eNETSLICE_PRO Rel-18 S5-147

AI: 6.6.2.1

not pursued [WTS] [JSN]
S5-232347 Way forward discussion on network slice in Rel-18 discussion

revised to S5-232970

Ericsson LM, Deutsche Telekom S5-147

AI: 6.6.2.1

revised [WTS] [JSN]
S5-232648 Discussion on network slice controller in Rel-18 discussion Nokia, Nokia Shanghai Bell Rel-18 S5-147

AI: 6.6.2.1

noted [WTS] [JSN]
S5-232970 Way forward discussion on network slice in Rel-18 discussion

revision of S5-232347

revised to S5-233155

Ericsson LM, Deutsche Telekom,Huawei S5-147

AI: 6.6.2.1

revised [WTS] [JSN]
S5-233018 Rel-18 CR 28.538 Add stage 3 solution for LcmProcess IOC CR Intel Corporation (UK) Ltd 28.538 18.1.0 CR#32 catB eNETSLICE_PRO Rel-18 S5-147

AI: 6.6.2.1

not pursued [WTS] [JSN]
S5-233155 Way forward discussion on network slice in Rel-18 discussion

revision of S5-232970

Ericsson, Deutsche Telekom, Huawei, Intel, Samsung, Telefónica, Nokia S5-147

AI: 6.6.2.1

endorsed [WTS] [JSN]

15 documents (0.36611294746399 seconds)