Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S2-180006 | LS from RAN WG3: LS on the need for EPS Bearer ID knowledge in NG-RAN for inter-system handover from 5GS to EPS |
LS in source LS: R3-174226 LS To: SA WG2 revision of S2-178226 |
RAN WG3 |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] | |||
S2-180016 | LS from SA WG3: Reply LS on security handling for EPS-5GC interworking |
LS in source LS: S3-173508 LS To: SA WG2 revision of S2-178416 |
SA WG3 | Rel-15 |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] | ||
S2-180019 | LS from GSMA NG SIGNAL: LS on interworking between networks with different 5G deployments options in a roaming scenario |
LS in source LS: SIGNAL99 Doc 104 LS To: SA WG2, CT WG4 LS reply in S2-180810 revision of S2-178937 |
GSMA NG SIGNAL |
S2-125 AI: 6.5.9 |
replied to | [WTS] [JSN] | |||
S2-180040 | LS from RAN WG4: Response LS on simultaneous transmission and/or reception over EPC/E-UTRAN and 5GC/NR |
LS in source LS: R4-1714539 LS To: SA WG2 |
RAN WG4 | Rel-15 |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] | ||
S2-180065 | 23.502: Clarifying inclusion of TAU messages in Registration Request |
draftCR revised to S2-180776 |
Qualcomm Incorporated | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180077 | 23.501: Correction of E-UTRA - 5GC procedures |
draftCR revised to S2-182096 |
Samsung | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
postponed | [WTS] [JSN] | |
S2-180093 | 23.502: 23.501 handling of Location Update in case of mobility from 5GS to EPS. | draftCR | Ericsson | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
not treated | [WTS] [JSN] | |
S2-180094 | 23.502 handling of Location Update in case of mobility from 5GS to EPS. | draftCR | Ericsson | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
merged | [WTS] [JSN] | |
S2-180119 | 23.502: MME and AMF registration in HSS+UDM |
draftCR revised to S2-180785 |
Cisco | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180124 | 23.502: Update the SM procedure for interworking | draftCR | Huawei, HiSilicon | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
postponed | [WTS] [JSN] | |
S2-180125 | 23.501: Generating EPS PDN Connection parameters from 5G PDU Session parameters |
draftCR revised to S2-180796 |
Huawei, HiSilicon | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180163 | 23.502 Clarification of mobility procedure from EPS to 5GS without N26 interface |
draftCR revised to S2-180792 |
Orange | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180164 | 23.501 Clarification of interworking procedures without N26 interface |
draftCR revised to S2-180790 |
Orange | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180165 | 23.501: Clarification on the use of indicators for the support of interworking without N26 and interworking with N26 |
draftCR revised to S2-180793 |
Orange | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180172 | 23.502: Removal of editor's note on mapping of security context for IW EPC/5GC | draftCR | Qualcomm Incorporated | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180180 | TS 23.501: Clarification for Combo Node in 5GS | discussion | OTD |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] | |||
S2-180181 | 23.501: Clarification for Combo Node in 5GS | draftCR | OTD | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] | |
S2-180306 | 23.502: Clarifications on EPS to 5GS handover procedure using N26 |
draftCR revised to S2-180779 |
China Mobile | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180348 | How multiple PDU sessions to same DN are transferred to EPS | discussion | Huawei, HiSilicon | Rel-15 |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] | ||
S2-180349 | 23.501: Mobility of PDU sessions with same DNN from NGS to EPS | draftCR | Huawei, HiSilicon | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
not treated | [WTS] [JSN] | |
S2-180350 | 23.501: Mobility of PDU sessions with same DNN from NGS to EPS | draftCR | Huawei, HiSilicon | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
not treated | [WTS] [JSN] | |
S2-180381 | CN selection in redirection for connected UE - DP | discussion | OPPO | Rel-15 |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] | ||
S2-180393 | 23.501: CN selection in redirection for connected UE - CR | draftCR | OPPO | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
not treated | [WTS] [JSN] | |
S2-180399 | 23.501: Clarification on interworking without N26 is supported | draftCR | LG Electronics, Orange | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
merged | [WTS] [JSN] | |
S2-180400 | 23.502: Clarification for dual registration regarding HO process - 23.502 | draftCR | OPPO | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
not treated | [WTS] [JSN] | |
S2-180401 | 23.502: Clarification on interworking without N26 is supported | draftCR | LG Electronics, Orange | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] | |
S2-180402 | 23.501: Clarification for dual registration regarding HO process -23.501 | draftCR | OPPO | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] | |
S2-180403 | 23.501: Clarification on SMF selection for interworking |
draftCR revised to S2-180786 |
LG Electronics | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180468 | 23.501: EPC to 5GC Migration fixes for Option 7 |
draftCR revised to S2-180775 |
Nokia, Nokia Shanghai Bell, AT&T | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180491 | 23.501: CR Network disable UE 5GC selection in case no roaming agreement | draftCR | Huawei, Hisilicon | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
merged | [WTS] [JSN] | |
S2-180507 | 23.502: Update 5GS and EPS handover procedures | draftCR | Huawei, HiSilicon | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
not treated | [WTS] [JSN] | |
S2-180540 | 23.501: Clarification on including an additional GUTI in the Registration request for connected-mode mobility from EPC to 5GC in single-registration mode | draftCR | LG Electronics, Nokia | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
merged | [WTS] [JSN] | |
S2-180556 | 23.502 clarification on the SM EPS bearer Contexts from the V-SMF | draftCR | ZTE | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
not treated | [WTS] [JSN] | |
S2-180557 | 23.502: Clarification and alignment on the intra-5G handover and inter-system handover. | draftCR | ZTE | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
not treated | [WTS] [JSN] | |
S2-180558 | 23.501: Clean up on the interworking without 26 indication |
draftCR revised to S2-180791 |
ZTE | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180559 | 23.502: Keeping EBI transfer alignment |
draftCR revised to S2-180780 |
ZTE | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180613 | 23.502: Clean up FFSs in 4.11.1.2.2 |
draftCR revised to S2-180782 |
Huawei, HiSilicon | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180615 | Transfer PDU session ID in the EPS |
CR revision of S2-180560 |
ZTE | 23.401 15.2.0 CR#3389 catB | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] |
S2-180640 | 23.502: Slicing handling for EPS to 5GS Mobility without N26 |
draftCR revised to S2-181536 |
ZTE | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180649 | 23.502: Sending EBI to the NG-RAN |
draftCR revised to S2-181511 |
CATT | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180650 | 23.502: Correction on the usage of ARP during EBI allocation procedure | draftCR | CATT | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] | |
S2-180651 | 23.502: Clarification on keeping NAS signaling connection | draftCR | CATT | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
not treated | [WTS] [JSN] | |
S2-180652 | 23.502: Indirect data forwarding in home routed roaming case |
draftCR revised to S2-180784 |
CATT | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180653 | 23.502: Interaction between SMF and UPF during the inter-system change |
draftCR revised to S2-180783 |
CATT | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180678 | 23.502: Update Handover procedures in clause 4.11.1.2 |
draftCR revised to S2-180794 |
Huawei, Hisilicon | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180704 | 23.501: Correcting erroneous indication name for interworking without N26 | draftCR | Intel | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
merged | [WTS] [JSN] | |
S2-180708 | 23.502: EPS bearer ID allocation update |
draftCR revised to S2-180781 |
NTT DOCOMO | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180728 | 23.502: UE Context Retrieval for dual registration mode | draftCR | Samsung | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
not treated | [WTS] [JSN] | |
S2-180730 | 23.502: Request Type in PDN connectivity request for SRM interworking |
draftCR revised to S2-180788 |
Samsung | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180732 | 23.502: Corrections to the Inter-system mobility procedures |
draftCR revised to S2-180787 |
NTT DOCOMO, LG Electronics | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180736 | 23.501: References to access stratum procedures for EPS-5GS interworking | draftCR | Intel | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
not treated | [WTS] [JSN] | |
S2-180739 | [draft] Reply LS to GSMA NG SIGNAL on Interworking between networks with different 5G deployments |
LS out LS To: GSMA NG SIGNAL revised to S2-180774 |
Vodafone | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | ||
S2-180740 | Discussing the interworking of core networks in roaming scenarios | discussion | Vodafone | Rel-15 |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] | ||
S2-180745 | Clarification on notify message in the mobility procedure from EPS to 5GS without N26 interface | CR | ORANGE | 23.401 15.2.0 CR#3393 catF | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
not treated | [WTS] [JSN] |
S2-180762 | 23.502: QoS clarifications for EPC interworking |
draftCR revised to S2-180778 |
NTT DOCOMO | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180763 | 23.501: EPS Interworking: 5G-S-TMSI derivation and context retrieval |
draftCR revised to S2-180777 |
Nokia, Nokia Shanghai Bell | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180774 | [draft] Reply LS to GSMA NG SIGNAL on Interworking between networks with different 5G deployments |
LS out LS To: GSMA NG SIGNAL revision of S2-180739 revised to S2-180798 |
SA WG2 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | ||
S2-180775 | 23.501: EPC to 5GC Migration fixes for Option 7 |
draftCR revision of S2-180468 revised to S2-180797 |
Nokia, Nokia Shanghai Bell, AT&T | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180776 | 23.502: Clarifying inclusion of TAU messages in Registration Request |
draftCR revision of S2-180065 revised to S2-181642 |
Qualcomm Incorporated | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180777 | 23.501: EPS Interworking: 5G-S-TMSI derivation and context retrieval |
draftCR revision of S2-180763 revised to S2-180799 |
Nokia, Nokia Shanghai Bell, LG Electronics | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180778 | 23.502: QoS clarifications for EPC interworking |
draftCR revision of S2-180762 revised to S2-180800 |
NTT DOCOMO | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180779 | 23.502: Clarifications on EPS to 5GS handover procedure using N26 |
draftCR revision of S2-180306 revised to S2-180801 |
China Mobile | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180780 | 23.502: Keeping EBI transfer alignment |
draftCR revision of S2-180559 revised to S2-181537 |
ZTE | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180781 | 23.502: EPS bearer ID allocation update |
draftCR revision of S2-180708 |
NTT DOCOMO | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180782 | 23.502: Clean up FFSs in 4.11.1.2.2 |
draftCR revision of S2-180613 revised to S2-180812 |
Huawei, HiSilicon | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180783 | 23.502: Interaction between SMF and UPF during the inter-system change |
draftCR revision of S2-180653 revised to S2-180806 |
CATT | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180784 | 23.502: Indirect data forwarding in home routed roaming case |
draftCR revision of S2-180652 revised to S2-180805 |
CATT | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180785 | 23.502: MME and AMF registration in HSS+UDM |
draftCR revision of S2-180119 revised to S2-180804 |
Cisco | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180786 | 23.501: Clarification on SMF selection for interworking |
draftCR revision of S2-180403 |
LG Electronics, Intel | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] | |
S2-180787 | 23.502: Corrections to the Inter-system mobility procedures |
draftCR revision of S2-180732 revised to S2-180795 |
NTT DOCOMO, LG Electronics | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180788 | 23.502: Request Type in PDN connectivity request for SRM interworking |
draftCR revision of S2-180730 revised to S2-180809 |
Samsung | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180789 | [DRAFT] LS on CN selection using RRC redirection |
LS out LS To: RAN WG2 |
SA WG2 | Rel-15 |
S2-125 AI: 6.5.9 |
noted | [WTS] [JSN] | ||
S2-180790 | 23.501 Clarification of interworking procedures without N26 interface |
draftCR revision of S2-180164 revised to S2-182260, S2-182281 |
Secretary of SA WG2 | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180791 | 23.501: Clean up on the interworking without 26 indication |
draftCR revision of S2-180558 revised to S2-181538 |
ZTE | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180792 | 23.502 Clarification of mobility procedure from EPS to 5GS without N26 interface |
draftCR revision of S2-180163 revised to S2-180808 |
Orange | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180793 | 23.501: Clarification on the use of indicators for the support of interworking without N26 and interworking with N26 |
draftCR revision of S2-180165 revised to S2-180814, S2-182263 |
Orange | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180794 | 23.502: Update Handover procedures in clause 4.11.1.2 |
draftCR revision of S2-180678 revised to S2-181592 |
Huawei, Hisilicon | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180795 | 23.502: Corrections to the Inter-system mobility procedures |
draftCR revision of S2-180787 revised to S2-180802 |
NTT DOCOMO, LG Electronics | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180796 | 23.501: Generating EPS PDN Connection parameters from 5G PDU Session parameters |
draftCR revision of S2-180125 revised to S2-180807 |
Huawei, HiSilicon | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180797 | 23.501: EPC to 5GC Migration fixes for Option 7 |
draftCR revision of S2-180775 revised to S2-181754 |
Nokia, Nokia Shanghai Bell, AT&T | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180798 | [draft] Reply LS to GSMA NG SIGNAL on Interworking between networks with different 5G deployments |
LS out LS To: GSMA NG SIGNAL revision of S2-180774 revised to S2-180810 |
SA WG2 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | ||
S2-180799 | 23.501: EPS Interworking: 5G-S-TMSI derivation and context retrieval |
draftCR revision of S2-180777 revised to S2-181755 |
Nokia, Nokia Shanghai Bell, LG Electronics | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180800 | 23.502: QoS clarifications for EPC interworking |
draftCR revision of S2-180778 |
NTT DOCOMO | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180801 | 23.502: Clarifications on EPS to 5GS handover procedure using N26 |
draftCR revision of S2-180779 revised to S2-180811 |
China Mobile | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180802 | 23.502: Corrections to the Inter-system mobility procedures |
draftCR revision of S2-180795 revised to S2-180813 |
NTT DOCOMO, LG Electronics | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180803 | Capturing EPC specifications impacts for 5GC interworking |
discussion revised to S2-180815 |
Irfan (Cisco) |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |||
S2-180804 | 23.502: MME and AMF registration in HSS+UDM |
draftCR revision of S2-180785 revised to S2-181806 |
Cisco | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180805 | 23.502: Indirect data forwarding in home routed roaming case |
draftCR revision of S2-180784 revised to S2-181512 |
CATT | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180806 | 23.502: Interaction between SMF and UPF during the inter-system change |
draftCR revision of S2-180783 revised to S2-181513 |
CATT | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180807 | 23.501: Generating EPS PDN Connection parameters from 5G PDU Session parameters |
draftCR revision of S2-180796 revised to S2-181594 |
Huawei, HiSilicon | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
endorsed | [WTS] [JSN] | |
S2-180808 | 23.502 Clarification of mobility procedure from EPS to 5GS without N26 interface |
draftCR revision of S2-180792 revised to S2-181404, S2-182251 |
Orange | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
revised | [WTS] [JSN] | |
S2-180809 | 23.502: Request Type in PDN connectivity request for SRM interworking |
draftCR revision of S2-180788 revised to S2-182090 |
Samsung | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180810 | Reply LS to GSMA NG SIGNAL on Interworking between networks with different 5G deployments |
LS out LS is reply to S2-180019 LS To: GSMA NG SIGNAL revision of S2-180798 |
SA WG2 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | ||
S2-180811 | 23.502: Clarifications on EPS to 5GS handover procedure using N26 |
draftCR revision of S2-180801 revised to S2-182089 |
China Mobile | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180812 | 23.502: Clean up FFSs in 4.11.1.2.2 |
draftCR revision of S2-180782 revised to S2-181593 |
Huawei, HiSilicon | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180813 | 23.502: Corrections to the Inter-system mobility procedures |
draftCR revision of S2-180802 |
NTT DOCOMO, LG Electronics | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180814 | 23.501: Clarification on the use of indicators for the support of interworking without N26 and interworking with N26 |
draftCR revision of S2-180793 revised to S2-182282 |
Orange | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] | |
S2-180815 | Capturing EPC specifications impacts for 5GC interworking |
discussion revision of S2-180803 |
Irfan (Cisco) |
S2-125 AI: 6.5.9 |
endorsed | [WTS] [JSN] | |||
S2-181404 | 23.502 Clarification of mobility procedure from EPS to 5GS without N26 interface |
draftCR revision of S2-180808 |
Orange | 5GS_Ph1 | Rel-15 |
S2-125 AI: 6.5.9 |
approved | [WTS] [JSN] |
99 documents (0.34209489822388 seconds)